Pohick Creek Restoration Project - Phase 1

Download Pohick Creek Restoration Project - Phase 1

Post on 14-Apr-2017

112 views

Category:

News & Politics

1 download

TRANSCRIPT

PowerPoint PresentationProject No. WW-000009-007June 9, 2016Noman M. Cole Jr. Pollution Control PlantPohick Creek Restoration Project Phase IMount Vernon DistrictA Fairfax County, VA, publicationDepartment of Public Works and Environmental ServicesWorking for You!Pohick Creek Restoration Project Phase ICapital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction BranchPohick Creek Restoration Project Phase IProject Overview:Construction of a stacked, imbricated rock wall along the toe of the slope and a bench along the top of the wall Installation of live stakesPlanting that includes native riparian vegetationInstallation of soil lifts for upper bank stabilizationDPWES Project Team:Utilities Design and Construction Division Adil Lhous, Mohamed Madih, Chris Triolo and Howard ChampWastewater Treatment Division Nikta Attar, Eddie TateStormwater Planning Division Sajan PokharelMaintenance and Stormwater Management Division Chad CrawfordDescription:The Pohick Creek Restoration Project Phase I, provided earthworks and bank stabilization along Area 1, located on the left bank of Pohick Creek adjacent to the Noman M. Cole, Jr. Pollution Control Plant. This project provided a stream diversion with the use of temporary sandbags adjacent to the creek. Additional requirements included the removal, stockpile, and replacement of the existing Class III rip rap. This project was substantially completed on June 13, 2016.Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction BranchProject DetailsPohick Creek Restoration Project Phase I9399 Richmond Highway, Lorton, VA 22079 Mount Vernon District, Tax Map No. 108-3Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction BranchPohick Creek Restoration Project Phase INew Rock Wall Installation Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction BranchPohick Creek Restoration Project Phase ISoil LiftsCapital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction BranchPohick Creek Restoration Project Phase IFinal Look of the Pohick Creek Restoration ProjectCapital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction BranchPohick Creek Restoration Project Phase ISoil LiftsCapital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction BranchBeforeAfterRehabilitation of the Primary Sludge Degritting Facilities and Replacement of MCC-2Irene Haske, Public Information Officer703-324-5821 TTY 711SWPDmail@fairfaxcounty.govCapital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction BranchAdditional InformationFor additional Information, please callwww.fairfaxcounty.gov/dpwes9

Recommended

View more >