poa standards

6
www.perspectives.cc · [email protected] © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012

Upload: elkan

Post on 07-Jan-2016

45 views

Category:

Documents


0 download

DESCRIPTION

PoA Standards. Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012. New PoA Standards. Standard for demonstration of additionality, development of eligibility criteria and application of multiple methodologies for Programme of Activities Approved EB 65 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PoA Standards

www.perspectives.cc · [email protected] © 2012 Perspectives GmbH

PoA Standards

Courtney Blodgett

Joint Coordination Workshop, Bonn

24 March 2012

Page 2: PoA Standards

www.perspectives.cc · [email protected] 2

New PoA Standards

Standard for demonstration of additionality, development of eligibility criteria and application of multiple methodologies for Programme of Activities- Approved EB 65

Also relevant: Standard for sampling and surveys for CDM project activities and programmes of activities- Approved EB 65

Page 3: PoA Standards

www.perspectives.cc · [email protected] 3

Key challenges of PoA standards - timing

Deadline of 25 July for uploading for registration- 226 PoAs in validation* - 15 PoAs submitted in February- Average time for start of comment period to requesting

registration: 255 days, approximately 8.5 months- Average time from requesting registration until registration: 100

days (approximately 3.3 months)- = Already a tight schedule for being registered by 2012

- High number of PoAs in non- LDCs: 32 PoAs in China, 27 in South Africa, 22 in India, 12 in Indonesia, 10 in Kenya

Compliance with the standards adds further complications/ possible delays to validation

* March 2012 CDM Pipeline, UNEP Risoe

Page 4: PoA Standards

www.perspectives.cc · [email protected] 4

Key challenges of PoA standards - Implementation

Co-ordinating & Managing Entity (CME) Manual- Useful document for thinking long term- But adds significant complications during validation

- 20 – 40 page document- Adds a substantial amount of extra work (and therefore

adds to the cost) during validation which adds to the 2012 time pressure

- Currently no precedence for a CME manual- A standardized optional template would be useful for facilitating

writing and validation

Page 5: PoA Standards

www.perspectives.cc · [email protected] 5

Sampling and survey standards

Single sampling plan covering a group of Component Project Activities (CPAs) now allowed - For micro or small scale PoAs applying a 95/10

confidence/precision- When there is either homogeneity of included CPAs or the

differences among the included CPAs is taken into account in the sample size calculation

- Highly relevant for i.e. energy efficient lighting and cookstove PoAs

Reduces transaction costs by not needing to sample each and every CPA

Very positive step: remains to be seen how DOEs apply the standards during validation

Page 6: PoA Standards

www.perspectives.cc · [email protected] © 2012 Perspectives GmbH

Thank you!Courtney Blodgett

[email protected] +49 (0)40 399 99 06 53