Page 1: PMP 02 Project Scope Management - PMBOK 5th Edition

Project Scope Management Based on PMBOK 5th Edition

Waleed El-Naggar, MBA, PMP

https://www.facebook.com/waleed.naggar

Page 2: PMP 02 Project Scope Management - PMBOK 5th Edition

Introduction to Project Scope

Plan Scope Management

Collect Requirements

Define Scope

Create WBS

Control Scope

Validate Scope

Agenda

PMP - Project Scope Management 2 https://www.facebook.com/waleed.naggar

Page 3: PMP 02 Project Scope Management - PMBOK 5th Edition

Scope refers to all the work involved in creating

the deliverables of the project and the processes

used to create them.

Project scope management includes the

processes required to ensure that the project

includes all the work required, and only the work

required, to complete the project successfully.

What is Project Scope?

PMP - Project Scope Management 3 https://www.facebook.com/waleed.naggar

Page 4: PMP 02 Project Scope Management - PMBOK 5th Edition

Product scope: The futures & functions that

characterize the product, service, or result.

Project Scope: The work that needs to be

accomplished to deliver a product, service, or

result with the specified features and

functions.

Product Scope vs. Project Scope

PMP - Project Scope Management 4 https://www.facebook.com/waleed.naggar

Page 5: PMP 02 Project Scope Management - PMBOK 5th Edition

PMP - Project Scope Management 5 https://www.facebook.com/waleed.naggar

Page 6: PMP 02 Project Scope Management - PMBOK 5th Edition

The process of creating a scope management plan that documents how the project scope will be defined, validated, and controlled.

It provides guidance and direction on scope will be managed.

5.1 Plan Scope Management

PMP - Project Scope Management 6 https://www.facebook.com/waleed.naggar

Page 7: PMP 02 Project Scope Management - PMBOK 5th Edition

Plan Scope Management Data Flow

PMP - Project Scope Management 7 https://www.facebook.com/waleed.naggar

Page 8: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Project Management Plan: it defines how the

project is executed, monitored, controlled

and closed. It integrates all plan

components.

2. Project Charter

3. Enterprise Environmental Factors

4. Organizational Process Assets

Plan Scope Management: Inputs

PMP - Project Scope Management 8 https://www.facebook.com/waleed.naggar

Page 9: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Expert Judgment: knowledgeable and

experiences parties.

2. Meetings.

Plan Scope Management: T & T

PMP - Project Scope Management 9 https://www.facebook.com/waleed.naggar

Page 10: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Scope Management Plan. It includes:

Process for preparing a detailed project scope

statement.

Process to enable the creation of WBS

Process to establish how the WBS will be

managed

Define formal acceptance criteria of

deliverables

How change requests will be applied to scope

Plan Scope Management: Output

PMP - Project Scope Management 10 https://www.facebook.com/waleed.naggar

Page 11: PMP 02 Project Scope Management - PMBOK 5th Edition

2. Requirements Management Plan: describes how

requirements will be analyzed, documented, and

managed. It includes, but not limited to:

How requirements activities will be planned,

tracked and reported.

Configuration management activities.

Requirements prioritization process.

Product metrics

Traceability structure

Plan Scope Management: Output (2)

PMP - Project Scope Management 11 https://www.facebook.com/waleed.naggar

Page 12: PMP 02 Project Scope Management - PMBOK 5th Edition

Which is the BEST description of project scope?

A. All of the features and deliverables your

project will deliver

B. All of the products your project will make

C. All of the people involved in your project

D. All of the work you will do to build the

project deliverables

Quiz

PMP - Project Scope Management 12 https://www.facebook.com/waleed.naggar

Page 13: PMP 02 Project Scope Management - PMBOK 5th Edition

The process of determining, documenting and managing stakeholder needs to meet project objectives.

The key benefit is to provide the basis for defining and managing project scope.

Requirements includes the quantified and documented needs and expectations of the sponsor, customer, and other stakeholders.

Requirement must be analyzed and recorded in a clear and detailed way to be measured.

5.2 Collect requirements

PMP - Project Scope Management 13 https://www.facebook.com/waleed.naggar

Page 14: PMP 02 Project Scope Management - PMBOK 5th Edition

Requirements can be grouped into classifications including:

Business requirements, describe the high-level needs of

the organization as a whole.

Stakeholder requirements, describe needs of a

stakeholder or stakeholder group.

Solution requirements, describe features, functions and

characteristics of the product, service, or results.

Transition requirements, describe temporary capabilities

such as data conversion & training needs.

5.2 Collect requirements (2)

PMP - Project Scope Management 14 https://www.facebook.com/waleed.naggar

Page 15: PMP 02 Project Scope Management - PMBOK 5th Edition

PMP - Project Scope Management 15 https://www.facebook.com/waleed.naggar

Co

llec

t R

equ

irem

ents

Da

ta F

low

Page 16: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Project Scope Management Plan

2. Requirements Management Plan

3. Stakeholder Management Plan

4. Project Charter

5. Stakeholder Register

Collect Requirements: Inputs

PMP - Project Scope Management 16 https://www.facebook.com/waleed.naggar

Page 17: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Interviews: meeting the stakeholders to ask

prepared and spontaneous question &

recording the responses.

Collect Requirements: T & T (1)

PMP - Project Scope Management 17 https://www.facebook.com/waleed.naggar

Page 18: PMP 02 Project Scope Management - PMBOK 5th Edition

2. Focus groups: bring together stakeholders

and subject matter experts to learn about

their expectations and attitudes about a

proposed product,

service or result.

Collect Requirements: T & T (1)

PMP - Project Scope Management 18 https://www.facebook.com/waleed.naggar

Page 19: PMP 02 Project Scope Management - PMBOK 5th Edition

3. Facilitated Workshops: Focused session with

key cross-functional stakeholders to define

product requirements.

4. Group Creativity Techniques:

Brainstorming

Nominal Group

Idea/Mind Mapping

Affinity Diagram

Multi-criteria decision analysis

Collect Requirements: T & T (2)

PMP - Project Scope Management 19 https://www.facebook.com/waleed.naggar

Page 20: PMP 02 Project Scope Management - PMBOK 5th Edition

Mind Map

PMP - Project Scope Management 20 https://www.facebook.com/waleed.naggar

Page 21: PMP 02 Project Scope Management - PMBOK 5th Edition

Affinity Diagram

PMP - Project Scope Management 21 https://www.facebook.com/waleed.naggar

Page 22: PMP 02 Project Scope Management - PMBOK 5th Edition

5. Group Decision Making Techniques

Unanimity

Majority

Plurality

Dictatorship

6. Questionnaire and Surveys

7. Observations

8. Prototypes

Collect Requirements: T & T (3)

PMP - Project Scope Management 22 https://www.facebook.com/waleed.naggar

Page 23: PMP 02 Project Scope Management - PMBOK 5th Edition

9. Benchmarking

10.Context Diagrams

11. Document Analysis

Collect Requirements: T & T (4)

PMP - Project Scope Management 23 https://www.facebook.com/waleed.naggar

Page 24: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Requirements Document

Business Requirements

Stakeholder requirements

Solution requirements

Project requirements

Transition requirements

2. Requirements Traceability Matrix

Collect Requirements: Outputs

PMP - Project Scope Management 24 https://www.facebook.com/waleed.naggar

Page 25: PMP 02 Project Scope Management - PMBOK 5th Edition

Sample Requirements Traceability Matrix

PMP - Project Scope Management 25 https://www.facebook.com/waleed.naggar

Page 26: PMP 02 Project Scope Management - PMBOK 5th Edition

The best tool in collecting requirements for a

cross-functional project is:

A. Facilitated Workshops

B. Interviews

C. Surveys

D. Brainstorming

Quiz

PMP - Project Scope Management 26 https://www.facebook.com/waleed.naggar

Page 27: PMP 02 Project Scope Management - PMBOK 5th Edition

The process of developing a detailed description

of the project and product.

5.3 Define Scope

PMP - Project Scope Management 27 https://www.facebook.com/waleed.naggar

Page 28: PMP 02 Project Scope Management - PMBOK 5th Edition

Define Scope Data Flow

PMP - Project Scope Management 28 https://www.facebook.com/waleed.naggar

Page 29: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Scope Management Plan

2. Project charter

3. Requirements Document

4. Organizational Process Assets

Procedures & Templates

Historical Data

Lessons learned from old Projects

Define Scope: Inputs

PMP - Project Scope Management 29 https://www.facebook.com/waleed.naggar

Page 30: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Expert Judgment

2. Product Analysis

3. Alternatives Identification

4. Facilitated workshops

Define Scope: T & T

PMP - Project Scope Management 30 https://www.facebook.com/waleed.naggar

Page 31: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Scope Statement: describes project’s

deliverables and the work required to create

those deliverables. It includes

Product scope description

Deliverables’ Acceptance Criteria

Project Deliverables

Project Exclusion

Project Assumptions

Constraints

Define Scope: Outputs (1)

PMP - Project Scope Management 31 https://www.facebook.com/waleed.naggar

Page 32: PMP 02 Project Scope Management - PMBOK 5th Edition

PMP - Project Scope Management 32 https://www.facebook.com/waleed.naggar

Elements of

Project

Charter and

Scope

Statement

Page 33: PMP 02 Project Scope Management - PMBOK 5th Edition

2. Project Documents Updates: may include,

but not limited to:

Stakeholder register

Requirements Documents

Requirements Traceability Matrix

Define Scope: Outputs (2)

PMP - Project Scope Management 33 https://www.facebook.com/waleed.naggar

Page 34: PMP 02 Project Scope Management - PMBOK 5th Edition

Why would you consider the scope statement so important

in your project management methodology?

A. Mandatory to consult the plan before accepting change.

B. Project managers must document any changes before

approving or declining them.

C. The project scope serves as a reference for all future

project decisions.

D. The scope statement is the base of WBS creation

Quiz

PMP - Project Scope Management 34 https://www.facebook.com/waleed.naggar

Page 35: PMP 02 Project Scope Management - PMBOK 5th Edition

Subdividing the project deliverables and

project work into smaller and more

manageable components.

The work breakdown structure is a

deliverable-oriented hierarchical

decomposition of project work.

5.4 Create WBS

PMP - Project Scope Management 35 https://www.facebook.com/waleed.naggar

Page 36: PMP 02 Project Scope Management - PMBOK 5th Edition

Create WBS Data Flow

PMP - Project Scope Management 36 https://www.facebook.com/waleed.naggar

Page 37: PMP 02 Project Scope Management - PMBOK 5th Edition

Sample WBS

PMP - Project Scope Management 37 https://www.facebook.com/waleed.naggar

Page 38: PMP 02 Project Scope Management - PMBOK 5th Edition

Sample WBS

PMP - Project Scope Management 38 https://www.facebook.com/waleed.naggar

Page 39: PMP 02 Project Scope Management - PMBOK 5th Edition

Sample

WBS

PMP - Project Scope Management 39 https://www.facebook.com/waleed.naggar

Page 40: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Scope Management Plan

2. Project Scope Statement

3. Requirements Document

4. Enterprise Environmental Factors

5. Organizational Process Assets

Create WBS: Inputs

PMP - Project Scope Management 40 https://www.facebook.com/waleed.naggar

Page 41: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Decomposition: The subdivision of project

deliverables into smaller, more manageable

components. The work package level is the

lowest level in the WBS, and is the point at

which the cost an activity durations can be

reliably estimated and managed. The level of

detail for work packages will vary with the size

and complexity of the project.

2. Expert Judgment

Create WBS: T & T

PMP - Project Scope Management 41 https://www.facebook.com/waleed.naggar

Page 42: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Scope Baseline

Project Scope Statement

WBS

WBS Dictionary

2. Project Documents updates

Create WBS: Outputs

PMP - Project Scope Management 42 https://www.facebook.com/waleed.naggar

Page 43: PMP 02 Project Scope Management - PMBOK 5th Edition

WBS Dictionary may include (but not limited to) Code of Account Identifier

Description of work

Assumptions and Constraints

Schedule Milestone

Resource required

Cost Estimate

Acceptance criteria

Quality Requirements

Create WBS: Outputs (2)

PMP - Project Scope Management 43 https://www.facebook.com/waleed.naggar

Page 44: PMP 02 Project Scope Management - PMBOK 5th Edition

Control

Accounts,

Work

Packages

and

Activities

PMP - Project Scope Management 44 https://www.facebook.com/waleed.naggar

Page 45: PMP 02 Project Scope Management - PMBOK 5th Edition

A work breakdown structure numbering system allows

project staff to:

A. Systematically estimate costs of work breakdown

structure elements.

B. Provide project justification

C. Identify the level at which individual elements are

found

D. Use it in project management software

Quiz

PMP - Project Scope Management 45 https://www.facebook.com/waleed.naggar

Page 46: PMP 02 Project Scope Management - PMBOK 5th Edition

Which of the following documents contain detailed

descriptions of work packages?

A. Work breakdown structure (WBS) dictionary

B. Activity list

C. Preliminary project scope statement

D. Project scope management plan

Quiz

PMP - Project Scope Management 46 https://www.facebook.com/waleed.naggar

Page 47: PMP 02 Project Scope Management - PMBOK 5th Edition

The work breakdown structure can best be thought of

as an effective aid for ___________ communication

A. Team

B. PMO

C. Customer

D. Stakeholders

Quiz

PMP - Project Scope Management 47 https://www.facebook.com/waleed.naggar

Page 48: PMP 02 Project Scope Management - PMBOK 5th Edition

Formalizing acceptance of the completed

project deliverables.

Includes reviewing deliverables with the client

and obtaining formal acceptance of deliverables.

Scope verification is concerned with acceptance

of deliverables while quality control is

concerned with correctness of the deliverables

and meeting quality requirements.

5.5 Validate Scope

PMP - Project Scope Management 48 https://www.facebook.com/waleed.naggar

Page 49: PMP 02 Project Scope Management - PMBOK 5th Edition

Validate Scope: Data Flow Diagram

PMP - Project Scope Management 49 https://www.facebook.com/waleed.naggar

Page 50: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Project Management Plan

2. Requirements Documentation

3. Requirements Traceability Matrix

4. Validated Deliverables

5. Work Performance Data

Validate Scope: Inputs

PMP - Project Scope Management 50 https://www.facebook.com/waleed.naggar

Page 51: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Inspection: measuring, examining, and

validating to determine whether work and

deliverables meet requirements and product

acceptance criteria. Inspections may be called

reviews, audits, and walkthroughs.

2. Group Decision Making Techniques

Validate Scope: T & T

PMP - Project Scope Management 51 https://www.facebook.com/waleed.naggar

Page 52: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Accepted Deliverables

2. Change Requests

3. Work Performance Information

4. Project Document Updates

Validate Scope: Outputs

PMP - Project Scope Management 52 https://www.facebook.com/waleed.naggar

Page 53: PMP 02 Project Scope Management - PMBOK 5th Edition

Which of the following is an output of scope

verification?

A. WBS template

B. Rework

C. Formal acceptance

D. SOW acceptance

Quiz

PMP - Project Scope Management 53 https://www.facebook.com/waleed.naggar

Page 54: PMP 02 Project Scope Management - PMBOK 5th Edition

Monitoring the status of the project &

products scope

Managing changes to scope baseline

Ensure all requested changes and

recommended corrective or preventive actions

are processed through the “Perform Integrated

Change Control” process.

Uncontrolled changes are often referred to as

project scope creep.

5.6 Control Scope

PMP - Project Scope Management 54 https://www.facebook.com/waleed.naggar

Page 55: PMP 02 Project Scope Management - PMBOK 5th Edition

Control

Scope

Data

Flow

PMP - Project Scope Management 55 https://www.facebook.com/waleed.naggar

Page 56: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Project Management Plan

Scope baseline

Scope management plan

Change management plan

Configuration management plan

Requirements management plan

2. Requirements Documentation

Control Scope: Inputs (1)

PMP - Project Scope Management 56 https://www.facebook.com/waleed.naggar

Page 57: PMP 02 Project Scope Management - PMBOK 5th Edition

3. Requirements Traceability Matrix

4. Work Performance Data

5. Organizational Process Assets

Control Scope: Inputs (2)

PMP - Project Scope Management 57 https://www.facebook.com/waleed.naggar

Page 58: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Variance Analysis

Analyze performance measurements to assess

the variation from the baseline scope. Analysis

should determine the cause and degree of

variance.

Control Scope: T & T

PMP - Project Scope Management 58 https://www.facebook.com/waleed.naggar

Page 59: PMP 02 Project Scope Management - PMBOK 5th Edition

1. Work Performance Information

2. Change Requests

3. Project Management Plan Updates

4. Project Document Updates

5. Organizational Process Asset Updates

Control Scope: Outputs

PMP - Project Scope Management 59 https://www.facebook.com/waleed.naggar

Page 60: PMP 02 Project Scope Management - PMBOK 5th Edition

During a project team meeting, a team member suggests

an enhancement to the scope that is beyond the scope of

the project charter. The project manager points out that

the team needs to concentrate on completing all the work

and only the work required. This is an example of:

A. Change management process.

B. scope management.

C. quality analysis.

D. scope decomposition.

Quiz

PMP - Project Scope Management 60 https://www.facebook.com/waleed.naggar

Page 61: PMP 02 Project Scope Management - PMBOK 5th Edition

Which of the following is the KEY attribute of scope

validation?

A. More complete project scope management plan

B. Customer acceptance of project deliverables

C. Improved schedule estimates

D. An improved project management information

system.

Quiz

PMP - Project Scope Management 61 https://www.facebook.com/waleed.naggar

Page 62: PMP 02 Project Scope Management - PMBOK 5th Edition

[email protected]

PMP - Project Scope Management https://www.facebook.com/waleed.naggar 62