plo tradisional hadsiz
DESCRIPTION
presentasi perancangan tata letak pabrik modul tradisional PT kerta kayu mainanTRANSCRIPT
Hadsiz Corp.Agri Suramanggala Ginandjar 13405069Dhimas Lazuardi Noer 13405105
Head office: Militan Trading Indonesia building, 1st floor, Bandung 40132, Indonesia.
Phone : (+62-22)91647080. Home Page: http://hadsiz.wordpress.com
HadSIZ Corporation merupakan perusahaan yang berfokus pada bidang konsultasi manajemen & industri.
Didirikan pada tanggal 5 September 2008 di Teknik Industri ITB
HadSIZ berarti Unlimited dalam bahasa Turki. Motto: Unlimited Infinity
President Director : Agri SG Chief Executive Officer : Dhimas LN
Jenis Produk Tabel demand Engine Gondola Boxcar Caboose Total
EGCC Produk I 46 46 46 0 92 184
EGBC Produk II 19 19 19 19 19 76
EGBG Produk III 35 35 70 35 0 140
Total 100 100 135 54 111 400
TABEL KEBUTUHAN ROUGH LUMBER PT KERETA KAYU
NO. ROUGH LUMBER NO PART NAMA PART
KARAKTERISTIK MATERIAL JUMLAH KEBUTUHAN
PART
JUMLAH PART DARI 1 UNIT
ROUGH LUMBER
JUMLAH KEBUTUHAN
ROUGH LUMBER
TOTAL
TEBAL (inch) PANJANG (inch) LEBAR (inch)
1/4"
131 Side Cab 0.25 2.50 2.00 201.407 174 2.000 133 Front Cab 0.25 2.00 1.50 100.301 219 1.000 141 Side Tender 0.25 2.00 1.50 108.325 219 1.000 144 Back Tender 0.25 1.50 1.50 54.162 291 1.000 231 Side Gondola 0.25 6.00 1.00 271.084 72 4.000 233 End Gondola 0.25 1.50 1.00 270.812 291 1.000 431 Side Caboose 0.25 4.00 1.50 223.786 108 3.000 433 End Caboose 0.25 1.50 1.50 223.114 291 1.000
14.000
1/2 "
135 Roof Cab 0.50 3.00 2.50 54.108 192 1.000 335 Roof Box Car 0.50 6.00 2.50 54.217 96 1.000 435 Roof Caboose 0.50 5.00 2.50 111.445 116 1.000
3.000
3/4"
110 Chassis engine 0.75 9.50 2.00 100.602 45 3.000 210 Chassis Gondola 0.75 6.00 2.00 135.677 72 2.000 410 Chassis Caboose 0.75 5.00 2.00 111.669 87 2.000
7.0002" 330 Body Box Car 2.00 6.00 2.00 54.434 72 1.000 1.000
Finished Rod Stick, 1.5 D 120 Boiler 1.50 4.50 100.502 16 7.000 7.000Finished Rod Stick, 0.75 D 121 Stack 0.75 1.50 100.200 50 3.000 3.000
KETERANGAN SPESIFIKASI ROUGH LUMBER
Nama Material SPESIFIKASI JUMLAH BAGIAN PER UNIT
UKURAN PER UNIT Rough Lumber UKURAN PER UNIT Rough Lumber
TEBAL (inch) PANJANG (inch) LEBAR (inch) TEBAL (inch) PANJANG (inch) LEBAR (inch)Rough Lumber 1/4" 3 per ketebalan 5/4" 3 1.25 146 2 0.25 146 2Rough Lumber 1/2" 4 per ketebalan 5/4" 4 1.25 146 5 0.5 146 2.5Rough Lumber 3/4" 3 per ketebalan 4/4" 3 1 146 6 0.75 146 2Rough Lumber 2" 1 per ketebalan 10/4" 3 2.5 146 6 2 146 2
Finished Rod Stick, 1.5 D Finished Rod Stick, 1.5 D 1 1.5 76 1.5 76 Finished Rod Stick, 0.75 D Finished Rod Stick, 0.75 D 1 0.75 76 0.75 76
Jumlah Mesin
TeoritisJumnlah Mesin
Aktual
PREFABRI KASI
C.O.Saw 2.45 3
Planner 2.07 3
Circ.Saw 2.76 3
Jointer 1.93 2
FABRIKASI
Circ.Saw 8.83 9
Jointer 5.10 6
Disc Sand 9.12 10
Drill Press 16.24 17
ASSEMBLY
Disc Sand 6.83 7
Bench I 12.58 13
Racks 1.71 2
Spray Booth1.10 2
Oven 2.30 3
Bench II 9.84 10
Bench III 1.37 2
92
Direktur Utama
Wakil Direktur Utama
Sekertaris
Direktur Keuangan
Direktur SDM
Direktur Produksi
Direktur Management Information System
Direktur Pemasaran
Sekertaris
Bagian Produksi
Bagian Perakitan
Bagian R&D
Bagian Maintenance
Bagian Pengendalian
Kualitas
Bagian Logistik & Gudang
Staff Merketing
Staff Humas
Staff Personalia
Staff Keuangan
Staff MIS
MOp
BENCH I (ASSY)
DISC SAND (FAB)
DRILL PRESS (FAB)
M
Disc
Sand
Op
DIS
C S
AN
D
(AS
SY
)
SPRAY BOOTH (ASSY)
Maintenance
Operator
Oven
Maintenance
Operator
OVEN (ASSY)
Maintenance
RACK
Operator
RACKS (ASSY)
M Op
Ben
ch II
BENCH II (ASSY)
BE
NC
H
III
Mai
nten
ance
Ope
rato
r
BENCH III
RECEIVING
GB
BP
GBBU
PLANNER (PREFAB)
OutgoingMaterial
Maintenance
PlannerIncomingMaterial
Operator
CIRCULAR SAW (PREFAB)
OutgoingMaterial
Maintenance
Circ. Saw
IncomingMaterial
Operator
JOINTER (PREFAB)
OutgoingMaterial
Maintenance
Mesin Jointer
IncomingMaterial
Operator
JOINTER (FAB)
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
SH
IPP
ING
CU
T O
FF
SA
W
(PR
EF
AB
)
Outgoing
Material
Maintenance
C
.O S
awIncom
ingM
aterial
Operator
Maintenance
C saw
Operator
IncomingMaterial
CIRCULAR SAW (FAB)
Outgoing
Material
Maintenance
C
.O S
awIncom
ingM
aterial
Operator
OutgoingMaterial
Maintenance
C.O Saw IncomingMaterial
Operator
OutgoingMaterial
Maintenance
Circ. Saw
IncomingMaterial
Operator
OutgoingMaterial
Maintenance
Circ. Saw
IncomingMaterial
Operator
OutgoingMaterial
Maintenance
Mesin Jointer
IncomingMaterial
Operator
OutgoingMaterial
Maintenance
PlannerIncomingMaterial
Operator
OutgoingMaterial
Maintenance
PlannerIncomingMaterial
Operator
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
OutgoingMaterial
Maintenance
Mesin Jointer
IncomingMaterial
Operator
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Drill
Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
D
rill
Pre
ss
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M Op
Ben
ch II
M Op
Ben
ch II
M Op
Ben
ch II
M Op
Ben
ch II
M Op
Ben
ch II
M Op
Ben
ch II
M Op
Ben
ch II
M Op
Ben
ch II
M Op
Ben
ch II
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
M
Disc
Sand
Op
M
Disc
Sand
Op
M
Disc
Sand
Op
M
Disc
Sand
Op
M
Disc
Sand
Op
M
Disc
Sand
Op
Maintenance
RACK
Operator
Maintenance
Operator
Oven
Maintenance
Operator
Oven
Maintenance
Operator
BE
NC
H
III
Mai
nten
ance
Ope
rato
r
WAREHOUSIN
G
Ruang Seminar
Rua
ng F
otok
opi
Ruang Gambar dan Desain
BagianAdministrasi
Ruang Rapatumum
Ruang Tamu
Ruang ArsipBagian
ProduksiBagian
PersonaliaBagian
PemasaranBagian
Keuangan
Bagian R & D
Bagian Kualitas
Bagian Logistik
Musholla
Toilet
DirekturUtama
Toilet
d
d
d
d
d
d
d
d
d
d
d
d
SH
IPP
ING
MOp
BENCH I (ASSY)
DISC SAND (FAB)
DRILL PRESS (FAB)
M
Disc
Sa
nd
Op
DIS
C S
AN
D
(AS
SY
)
SPRAY BOOTH (ASSY)
Main
tena
nce
Op
erator
Oven
Maintenance
Operator
OVEN (ASSY)
Maintenance
RACK
Operator
RACKS (ASSY)
M Op
Be
nch
II
BENCH II (ASSY)
BE
NC
H
III
Ma
inte
na
nce
Op
era
tor
BENCH III
RECEIVING
GB
BP
GBBU
PLANNER (PREFAB)
OutgoingMaterial
Maintenance
PlannerIncomingMaterial
Operator
CIRCULAR SAW (PREFAB)
OutgoingMaterial
Maintenance
Circ. Saw
IncomingMaterial
Operator
JOINTER (PREFAB)
OutgoingMaterial
Maintenance
Mesin Jointer
IncomingMaterial
Operator
JOINTER (FAB)
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
CU
T O
FF
SA
W
(PR
EF
AB
)
Ou
tgoing
Mate
rial
Main
tena
nce
C.O
Saw
Incoming
Mate
rial
Op
erator
Maintenance
C saw
Operator
IncomingMaterial
CIRCULAR SAW (FAB)
Ou
tgoing
Mate
rial
Main
tena
nce
C.O
Saw
Incoming
Mate
rial
Op
erator
OutgoingMaterial
Maintenance
C.O Saw IncomingMaterial
Operator
OutgoingMaterial
Maintenance
Circ. Saw
IncomingMaterial
Operator
OutgoingMaterial
Maintenance
Circ. Saw
IncomingMaterial
Operator
OutgoingMaterial
Maintenance
Mesin Jointer
IncomingMaterial
Operator
OutgoingMaterial
Maintenance
PlannerIncomingMaterial
Operator
OutgoingMaterial
Maintenance
PlannerIncomingMaterial
Operator
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
OutgoingMaterial
Maintenance
Mesin Jointer
IncomingMaterial
Operator
Outgoing
Material
Maintenance
Mesin
JointerIncom
ingM
aterial
Operator
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
Maintenance
C saw
Operator
IncomingMaterial
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Disc Sand
Op
M
Drill
Pre
ss
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
D
rill
Pre
ss
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M
Drill Press
Op
M Op
Be
nch
II
M Op
Be
nch
II
M Op
Be
nch
II
M Op
Be
nch
II
M Op
Be
nch
II
M Op
Be
nch
II
M Op
Be
nch
II
M Op
Be
nch
II
M Op
Be
nch
II
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
MOp
M
Disc
Sa
nd
Op
M
Disc
Sa
nd
Op
M
Disc
Sa
nd
Op
M
Disc
Sa
nd
Op
M
Disc
Sa
nd
Op
M
Disc
Sa
nd
Op
Maintenance
RACK
Operator
Main
tena
nce
Op
erator
Oven
Maintenance
Operator
Oven
Main
tena
nce
Op
erator
BE
NC
H
III
Ma
inte
na
nce
Op
era
tor
WAREHOUSIN
G
Security
Ruang Seminar
Rua
ng F
oto
kop
i
Ruang Gambar dan Desain
BagianAdministrasi
Ruang Rapatumum
Ruang Tamu
Ruang ArsipBagian
ProduksiBagian
PersonaliaBagian
PemasaranBagian
Keuangan
Bagian R & D
Bagian Kualitas
Bagian Logistik
Musholla
Toilet
DirekturUtama
Toilet
Parkir Motor
272 sq. m.
Parkir Mobil
151 sq. m.
Garasi
Locker
RuangGanti
Toilet Pria
Kloset Kantin &Dapur
Masjid
WashTable
kom
pre
ssor
Gen
erat
or
Ruang Peralatan
PemadamKebakaran
GarduListrik
P3K
Menara Air
Security
Parkir
174 sq. m.
d dd d dd d dd d dd d dd d dd d dd d dd d dd d dd d dd d dd d dd d dd d d
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
ddd
d
dd
dd
d
d
dd
dd
d
d
dd
dd
dd d dd d dd d dd d dd d dd d d d dd d dd d dd d dd d dd d dd dd d dd d dd d dd d dd d dd d dd d d
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
d
d
dd
dd
dd
d
d
dd
d
d
d
dd
dd
d
d
dd
Security
Security
Lapangan Badminton
D
A
A
d
c
c
c
c
d
dd
d
d
dd
dd
d
d
dd
TPS
16 sq. m.
Gudang
LEGENDA
MATERIAL HANDLING LIFT TRUCK
MATERIAL HANDLING WALKING PALLET
MATERIAL HANDLING TENAGA MANUSIA
SKALA 1 : 200
Tree
OUTGOING MATERIAL
INCOMING MATERIAL
LAMPU TAMAN
Luas tanah yang dibutuhkan : 88 m X 138 m (12144 m2)
Biaya Investasi : Rp7,597,374,275.50
Pay Back Period : ◦ 1,8845 tahun + 1 tahun ◦ Setara dengan 2 tahun, 10 bulan, 16 hari kerja
Jenis Produk Tabel demand Harga Jual per Produk
EGCC Produk I 46 Rp51,010.23
EGBC Produk II 19 Rp51,352.93
EGBG Produk III 35 Rp50,867.56
Wassalamualaikum warahmatullah wabarakatuh