planning mlearning project

20
Planning a mobile learning project By Inge Ignatia de Waard

Upload: inge-ignatia-de-waard

Post on 06-May-2015

5.279 views

Category:

Education


0 download

DESCRIPTION

This presentation gives an overview of which factors you need to take into account to set up a mobile learning project.

TRANSCRIPT

Page 1: Planning mlearning project

Planning a mobile learning project

By Inge Ignatia de Waard

Page 2: Planning mlearning project

Mobile projects at ITMCurrently I work at the Institute of Tropical Medicine (ITM) in Antwerpen,

Belgium.

ITM has been developing several, different types of projects: on/offline data gathering, full mobile courses, mobile learning for health awareness, mobile continuing education updates, train the trainer modules, GIS. These mobile solutions were developed for research and educational purposes.

Our challenges: emerging countries, challenging environments & tiny budgets & tiny team.

Our strength: an interdisciplinary, creative team.

Page 3: Planning mlearning project

11 steps towards a mLearning project5 core elements:•1. Define the goal of the mLearning project? What needs does it address?2. Get all the stakeholders involved.3. What are your planned learner dynamics.4. What is the (mobile) infrastructure like in the target area you will be rolling out your project?5. Who is your target audience? What is the mobile situation for your target audience?

Knowing the above steps, you can get more practical:•6. Could security be an issue? Sensitive information/location7. What will be the core devices you will cater for? BYOD or not?8. How will you design the content? Authoring tools or programming or social media or text?9. What are your strategies your mobile content delivery ?10. What is a mLearning content user allowed to do? 11. What will be your user policies?

More elaborate: http://ignatiawebs.blogspot.it/2012/06/drawing-up-mlearning-strategy.html

Page 4: Planning mlearning project

Which mLearning need is addressed?

Starting from a need that lives in your target audience will increase chances of success.

Page 5: Planning mlearning project

What is your project goal?

What part of the need does it address? What do you want to achieve with this project? For instance: an improved financial awareness and action strategy for women in poor and challenged situations, enabling them to start a small business. A clear goal defines priorities, which in turn lead to the mobile solutions you will need to find or create.

Page 6: Planning mlearning project

Which mLearning field does it relate to?

Depending on the field, different mobile tools or technical options are needed•For example:

– a project related to language will have more focus on communication/audio,

– a project targeting less literate learners will have to be more visual, – environmental projects will benefit from geo-location options…

Page 7: Planning mlearning project

Who is your target audience?Who will be the learners for this mLearning project and what is their mobile environment?

If you are able to describe the target population, it will make it easier to anticipate mobile digital literacy, what type of device they are using, which type of community feeling is important.

Page 8: Planning mlearning project

Different learners, different entry levels

If a project consists of different learner audiences, you might need different project entry levels: e.g. an engineering project can have different audiences: the engineers (keeping in touch with progress on the floor – pictures of progress, sharing notes), the managers (need to keep up with costs, timing…) and overall project leads. In those cases it is useful to plan different entry levels, so a learner only sees what is of interest to them (possibly with an option to see all, but enable optimal time management and focus).

Page 9: Planning mlearning project

Engage all stakeholdersWho are ALL the stakeholders that might influence the project? (e.g. school directors, district health clinics, ministry of education, top level managers, leaders of a community, funding agencies ...).

•Getting stakeholders involved from early on, gives them a sense of co-ownership and importance. This will make them more open to your project as mutual trust can be build from early on.

Page 10: Planning mlearning project

Prepare your pitch …

Be ready with a broader description of the project if you want to get funding or interest from stakeholders. Make sure that your project has some ‘body’ and looks like more than a wild idea. (possibly with a scenario describing how the learning cycle of the project evolves)

Page 11: Planning mlearning project

Infrastructure analysis

What type of technology and infrastructure can be expected? What is the internet/telecom connection in that region?

– Which type of mobile device will be offered or do the target audience have at their disposal?

– Are the mobile devices basic (email, sms) or more elaborate (mobile apps, mobile browser …?)

– Is there stable electricity/connectivity? – Can you use mobile social media or not? Are some of the media

censored or filtered (China, N. Korea…)?

Page 12: Planning mlearning project

Know the cost for ALL parties

The cost is not only limited to starting the project, it has consequences for the user also. Make a holistic cost overview:•How much does it cost to start the project?•How much does it cost to sustain the project?•How much is the cost for the user (regional data plan, sms cost, phone/tablet cost…)?

Page 13: Planning mlearning project

How do you ensure sustainability?

One of the most heard critiques on mLearning projects is the fact that many of them do not stand the test of time (= not longer than the pilot period of the project). •For stakeholders and certainly for gathering funds it is important that you at least come up with a few durable ideas: using what the target population has, keeping costs low, understanding the cost of the user once the project rolls out ....

Page 14: Planning mlearning project

Step by step, reaching your goal?

Cut down your project into smaller steps. List the different steps that will bring you to a successful end result: •interviewing the target population, •getting funds from organisation X, •developing mobile skills training....

Page 15: Planning mlearning project

Timing gives a guideline

Once you know the steps, you can put a timeline on getting the project realized. This will enable you to plan ahead, as well as adapt if needed.

Page 16: Planning mlearning project

Foresee possible challenges

Once you analyse all factors, keep potential challenges in mind and list them: •stakeholders that can slow down the project, •administrative processes, …

Page 17: Planning mlearning project

The 500 $ MobiMOOC AwardAt the end of the three week course the MobiMOOC Award will be offered to the winning mLearning project, as voted by the MobiMOOC participants. The winning mLearning project will be that project which is considered by all as having the most impact for people living in difficult or challenged situations.

In order to enter the contest and to win the MobiMOOC Award, you must participate in MobiMOOC and fill in a mLearning project overview. The contest will be based on mLearning project overviews, that will be made based on a 10 step template that can be found here.

Every MobiMOOC participant willing to enter the MobiMOOC award contest will be asked to post their overview in the MobiMOOC google group [clear subject line of mail = mLearning project + your name] OR send their overview by 25 September (is absolute deadline) to Inge/Ignatia (see contact details in last slide)

From 28 September 2012 the vote will be open and on 30 September the winner will be revealed.

30 September 2012: Award notification! The winner of the MobiMOOC award will be revealed (the money will be send via Western Union.

Page 18: Planning mlearning project

Collaboration makes us stronger

I would ask all of you to share your project overview with all of us first. That way you will get the best possible feedback. If you do not feel comfortable you can mail the overview to me and I will give private feedback (if I get the overview before 23 September).

Page 19: Planning mlearning project

Steps to take with mLearning overview

Get hold of the mLearning project overview•Here on the wikipage•Or here as a google document

Write up a workable draftShare it with the group: discussion forum here or via MobiMOOC group here. Make sure to use a clear title. Or send it via mail to Inge BEFORE 23 September 2012 for feedback.

Once your draft reaches a state you are happy with, post it with title ‘final mLearning overview’ in the designated discussion forum (before 25 September 2012).

Page 20: Planning mlearning project

Additions from youQ/A Contact

20

E-mail: ingedewaard (at) gmail.com

Blog: ignatiawebs.blogspot.com

Twitter: http://twitter.com/Ignatia Slideshare (ppt): http://www.slideshare.net/ignatia

linkedIn: http://www.linkedin.com/in/ingedewaard

Publications/presentations: http://www.ingedewaard.net/pubconsulpres.htm