plan - gov.uk · 0 5 10 15 20 25 30 35 40 45-5-10-15-20 0 5 10 15 20 25 30 35 40 45-5-10-15-20...

1
0 5 10 15 20 25 30 35 40 45 -5 -10 -15 -20 0 5 10 15 20 25 30 35 40 45 -5 -10 -15 -20 Chainage 1 + 200 1 + 250 1 + 300 1 + 350 1 + 400 1 + 450 1 + 500 1 + 550 1 + 600 1 + 650 1 + 700 1 + 750 1 + 800 1 + 850 1 + 900 1 + 950 2 + 000 2 + 050 2 + 100 Horizontal Alignment L=547.4 Vertical Alignment G = - 3 . 40 % L = 161 . 9 R=6000.0 L=185.5 G = - 0 . 31 % L = 569 . 8 Existing Level 24 . 9 Proposed Level 13 . 3 11 . 6 9 . 9 8 . 2 6 . 9 6 . 0 5 . 5 5 . 3 5 . 2 5 . 0 4 . 8 4 . 7 4 . 5 4 . 4 4 . 2 4 . 1 3 . 9 3 . 8 Cut and Fill - 11 . 6 Design Speed: 145km/h L=547.4 L = 120 . 0 G = - 3 . 40 % L = 161 . 9 R=6000.0 L=185.5 25 . 3 25 . 3 35 . 3 34 . 6 33 . 8 32 . 6 32 . 1 - 13 . 7 - 15 . 4 - 27 . 7 - 27 . 8 - 27 . 1 - 26 . 8 32 . 1 32 . 5 32 . 9 33 . 5 33 . 5 32 . 6 32 . 4 30 . 6 31 . 3 29 . 8 - 25 . 1 - 26 . 9 - 27 . 5 - 28 . 1 - 28 . 8 - 29 . 0 - 28 . 2 - 28 . 2 - 26 . 5 - 27 . 4 - 26 . 0 001 - L2 Euston Tunnel (Main Line) R=-1060.0 L=405.2 Route Element ID Euston Portal 001-L1 30 . 0 m 30 . 0 m 30 . 0 m 1 + 219 1 + 219 2 + 000 A1 07/01/2016 LH AS SHOWN London Metropolitan Civil Mott MacDonald London Metropolitan Area Design Profile Scale 1:2500 Plan H S 2 U p L i n e H S 2 D o w n L i n e Scale H 1:2500 V 1:500 Existing Ground Profile HS2 Alignment cross passage Running tunnel Level Sewer No.2 Thames Water Middle Cr o ss p a ss a g e Cr o ss p a ss a g e Se we r No . 2 M i dd l e L e v e l T h a m e s W a t e r W ood Ca b l e T unn e l Ea d e Ro a d t o St J ohn ' s Na ti on a l Gr i d Portal 001-L1 Euston Empty Carriage Line Tunnel H-02-S1 Network Rail Up St John's Wood Cable Tunnel National Grid Eade Road to 1 + 290 Chainage 1+275 to 2+100 Main Line C221-MMD-CV-DPP-010-200500-FPD Sheet 3 FINAL PRELIMINARY DESIGN DH MP F o r Co n ti nu a ti on Re f e r T o C22 1 - M M D- CV- DPP - 010 - 200700 - FP D F o r Con ti nu a ti on Re f e r T o C221 - MM D- CV- DPP - 010 - 580006 - FP D MF 08/01/16 08/01/16 08/01/16 DH LH MP P01 Baseline HB Nov 2013. Copied, renumbered and changed for FPD. P02 P02 Final issue 09/03/16 KR 09/03/16 MP 09/03/16 Drawn Checked Approved Drawing No. Date Scale Size Rev. Drawn Rev Description Project/Contract Discipline/Function Zone Creator/Originator Legends/Notes: Drawing Title Design Stage HS2 App Con App Checked Scale with caution as distortion can occur. may be used for legal or other official purposes. Only an official copy of a title plan or register obtained from the Land Registry sold or published without the formal permission of Land Registry. This material was last updated on 2015 and may not be copied, distributed, Registry under delegated authority from the Controller of HMSO. © Crown Copyright material is reproduced with the permission of Land Ordnance Survey Licence number 100049190 © Crown Copyright and database right 2015. All rights reserved. or if it is issued in part or issued incompletely in any way. the reproduction of this document after alteration, amendment or abbreviation HS2 accepts no responsibility for any circumstances which arise from London, E14 5AB One Canada Square, Registered office: Registration No. 06791686 Registered in England Tunnel portal Ditches - new Tunnels external extent Woodland habitat creation Wetland habitat creation Grassland habitat creation Ecological mitigation pond HS2 Access road Watercourse diversion Electricity substation Balancing pond Noise fence barrier Replacement floodplain storage Land drainage area (scrub / woodland) Landscape mitigation planting Main utility works County boundary Borough / District boundary Community forum boundary Rail alignment Rail alignment formation Landscape earthworks Engineering earthworks 10 + 000 Stopped-up PRoW Hedgerow habitat creation Grassed areas Sustainable placement Public realm (PRoW) Existing public right of way PRoW New, diverted or realigned (e.g. 10+000) Chainage Existing watercourse or portal building Depot, station, headhouse development use Returned to suitable any error or omission which is due to an error or omission in data supplied to us by other parties. consequences of this document being relied upon by any other party, or being used for any other purpose, or containing only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the This document is issued for the party which commissioned it and for specific purposes connected with the captioned project © Mott MacDonald 0 10 5 50 20 @ 1:500 METRES 0 50 250 100 20 @ 1:2500 METRES Fit for Acceptance Code 1 - Accepted

Upload: others

Post on 08-Jan-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Plan - gov.uk · 0 5 10 15 20 25 30 35 40 45-5-10-15-20 0 5 10 15 20 25 30 35 40 45-5-10-15-20 Chainage 1 + 200 1 + 250 1 + 300 1 + 350 1 + 400 1 + 450 1 + 500 1 + 550 1 + 600 1 +

0

5

10

15

20

25

30

35

40

45

-5

-10

-15

-20

0

5

10

15

20

25

30

35

40

45

-5

-10

-15

-20

Chainage

1+200

1+250

1+300

1+350

1+400

1+450

1+500

1+550

1+600

1+650

1+700

1+750

1+800

1+850

1+900

1+950

2+000

2+050

2+100

Horizontal Alignment L=547.4

Vertical Alignment G=-3.40%L=161.9

R=6000.0

L=185.5

G=-0.31%

L=569.8

Existing Level

24.9

Proposed Level

13.3

11.6

9.9

8.2

6.9

6.0

5.5

5.3

5.2

5.0

4.8

4.7

4.5

4.4

4.2

4.1

3.9

3.8

Cut and Fill

-11.6

Design Speed: 145km/h

L=547.4L=120.0

G=-3.40%L=161.9

R=6000.0

L=185.5

25.3

25.3

35.3

34.6

33.8

32.6

32.1

-13.7

-15.4

-27.7

-27.8

-27.1

-26.8

32.1

32.5

32.9

33.5

33.5

32.6

32.4

30.6

31.3

29.8

-25.1

-26.9

-27.5

-28.1

-28.8

-29.0

-28.2

-28.2

-26.5

-27.4

-26.0

001 - L2 Euston Tunnel (Main Line)

R=-1060.0 L=405.2

Route Element IDEuston Portal001-L1

30.0m

30.0

m

30.0

m

1+219

1+219

2+000

A107/01/2016

LH

AS SHOWN

London Metropolitan

Civil

Mott MacDonald

London Metropolitan Area Design

Profile

Scale 1:2500

Plan

HS2 Up Line

HS2 Down Line

Scale H 1:2500 V 1:500

Existing Ground Profile

HS2 Alignment

cross passage

Running tunnel

Level Sewer No.2

Thames Water Middle

Cross p

assage

Cross p

assage

Se

wer

No.2

Mid

dle L

evel

Tha

mes W

ater

Wood C

able T

unnel

Eade R

oad to St John's

National

Grid

Portal001-L1 Euston

Empty Carriage Line Tunnel

H-02-S1 Network Rail Up

St John's Wood Cable Tunnel

National Grid Eade Road to

1+290

Chainage 1+275 to 2+100

Main Line

C221-MMD-CV-DPP-010-200500-FPD

Sheet 3

FINAL PRELIMINARY DESIGN

DH MP

For

Continuation R

efer

To C

221-M

MD-C

V-D

PP-0

10-2

00700-F

PD

For

Continuation R

efer

To C

221-M

MD-C

V-D

PP-0

10-5

80006-F

PD

MF

08/01/16 08/01/16 08/01/16

DHLH MPP01

Baseline HB Nov 2013. Copied,

renumbered and changed for FPD.

P02

P02

Final issue

09/03/16

KR

09/03/16

MP

09/03/16

Drawn Checked Approved

Drawing No.

Date Scale Size

Rev.

DrawnRev Description

Project/Contract

Discipline/Function

Zone

Creator/Originator

Legends/Notes:

Drawing Title

Design Stage

HS2 AppCon AppChecked

Scale with caution as distortion can occur.

may be used for legal or other official purposes.

Only an official copy of a title plan or register obtained from the Land Registry

sold or published without the formal permission of Land Registry.

This material was last updated on 2015 and may not be copied, distributed,

Registry under delegated authority from the Controller of HMSO.

© Crown Copyright material is reproduced with the permission of Land

Ordnance Survey Licence number 100049190

© Crown Copyright and database right 2015. All rights reserved.

or if it is issued in part or issued incompletely in any way.

the reproduction of this document after alteration, amendment or abbreviation

HS2 accepts no responsibility for any circumstances which arise from

London, E14 5AB

One Canada Square,

Registered office:

Registration No. 06791686

Registered in England

Tunnel portalDitches - new

Tunnels external extentWoodland habitat creation

Wetland habitat creation

Grassland habitat creation

Ecological mitigation pond

HS2 Access road

Watercourse diversion

Electricity substation

Balancing pond

Noise fence barrier

Replacement floodplain storage

Land drainage area (scrub / woodland)

Landscape mitigation planting Main utility works

County boundary

Borough / District boundary

Community forum boundary

Rail alignment

Rail alignment formation

Landscape earthworks

Engineering earthworks

10+000

Stopped-up PRoW

Hedgerow habitat creation

Grassed areas

Sustainable placement

Public realm

(PRoW)

Existing public right of way

PRoW

New, diverted or realigned (e.g. 10+000)

Chainage

Existing watercourseor portal building

Depot, station, headhouse

development use

Returned to suitable

any error or omission which is due to an error or omission in data supplied to us by other parties.

consequences of this document being relied upon by any other party, or being used for any other purpose, or containing

only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the

This document is issued for the party which commissioned it and for specific purposes connected with the captioned project

© Mott MacDonald

0 105 5020

@ 1:500METRES

0 50 25010020

@ 1:2500METRES

Fit for Acceptance

Code 1

- Acc

epted