Pit, Haul Fleet, and Crushing Optimization
KCSA ‘18
Tony Gianni Trimble LOADRITE
Introduction
• Eastern NA Sales Manager Trimble Loadrite• 5 years as Technical Support Engineer• Hundreds of quarries around the world• Belt scales, plant integration, online reporting
Today’s Objectives• What is the Connected Quarry? • What technology is available? • How can operations be more efficient? • How can reports be a valuable tool? • How can my processes be improved? • Where can I reduce costs and improve profit?
Connected Quarry• Measurement
o Real time link and visibility of all three zoneso Extractiono Processingo Loadout
• Staying Connected to your Quarry
Connected QuarryPit loading:Measure loading and haul truck productivity. Optimize haulage.Measure Blast performance
Processing / Production:Measure total production. Tonnage per product and specific stockpile tonnage. Downtime reporting and monitor plant utilisation.
Load-out management:Load your customers trucks more accurately, eliminate overloading , reduce waiting time, improve safety.Fully integrated solution with site ERP or dispatch systems.
Available Technology• On-board Weighing Technology
o Pit Loader Scaleso Haul Truck Monitoring Systemso Primary Conveyor Scaleso Final Product Conveyor Scaleso Yard Loader Scales
• Improved Data Transfer• Cloud Based Reporting Software
Cloud Based Reporting• Near Real Time Insight and Visibility
o Fix Today’s Problems• Increased Accessibility• Operational Analysis
Targeted Operational Improvements • Throughput per hour
o Faster cycle times reduces the hours needed to achieve a certain task or output o Reduced machine hours reduces fuel cost, maintenance cost, repairs, capital depreciation, for the same
amount of output
• Cost per hour o Treating equipment better reduces maintenance costs, regardless of the output / hr o Operating a machine properly can reduce fuel cost and maintenance cost for the same productive output
• Idling, running empty o Like idling for mobile equipment, “black belt time” in crushing and screening
• Reduce wasted material o Sell as much as you can of what you make
• Value of service o Better customer service leads to more business and better pricing
Sample Quarry Operation• Production:
o 900,000 ton theoretical capacity o Selling 730,000 tons per year, at $10/ton
• Fleet: o Pit: 1 Drill (1 shot/ 2 wks), 1 excavator, 3 Haul Trucks o Processing: 3 crushers, 10 belts o Loadout: 4 Loaders, 1 water truck, 1 weigh bridge
• Other parameters: o 17 staff o 11 months/yr, 5 days/wk, 8 hrs/day operation
Extraction• Pit loader scales optimize the
load in each trucko By loading closer to optimal
weight, avoid under loaded trucks, and reduce the number of cycles
o Minimize fuel consumption and maintenance costs
o Measure blast efficiency
Extraction• Cloud Based Performance
and Availability Management
Extraction• Not all operators
are the same• Load out
management system helps to:o Identify ‘A’ operatorso Assist ‘B’ and ‘C’
operators
Extraction• Haul trucks activity
o Loading timeo Haul timeo Queuing time
• Shows machinery availability/performanceo Identifies bottlenecks, bunching/line-
upso Empowers fleet managers to make
improvements that affect production during the shift
• Higher total throughput
Extraction• Automated product totals provides
accurate production figures• Avoid tabulating load sheets• Highlights material movement issues• Increased Safety
Extraction• Overall summary of fleet
performance• Average haul truck loading
time• Compare Truck TPH to
Primary TPH to determine feeding efficiency
• Speedingo Increased safetyo Increased production
Customer feedback: Reduction in cycle times
• Monitoring system data helped identify issues causing longer cycle times.
• Dumping time issues caused by waiting for traffic light.
• Change in practice to call for lights once in position.
• Achieved 50% reduction in dump time.
• Time saving of 1 hour per day.
Shap Beck Quarry : Pit OptimizationShap Beck Quarry •X2350 Excavator Scale •Reporting software
Eighty (80) day Payback •Purely from optimizing haulage Additional value from: •Better management of blasting contractors •Hard data to right-size equipment
Recommended to rollout on largest global sites
“Having Loadrite systems and reports was like putting reading glasses on. We could see and analyze every detail of our operation.”-Chris Herbert, plant supervisor Shap Beck Quarry, UK
Extraction Improvements
• Task Productivity o Reduce the number of truck cycles o Compress operating costs
• Process productivity o Reduce truck cycle time
• Monitor blast yields • Reduce inventories and re-handling
Cost improved by 10 cents/ton, With a system that costs about 2.2 cents/ton (over 7 years)
ROI: Extraction
Additional Benefits: 1.Accelerate Operator learning curve ! Achieve more than the above, or faster 2.Improved Safety
1. Ensure trucks are loaded appropriately for the circumstances ! priceless
Processing• Installation of belt scales
to monitor flow of product through the system
• Visibility into plant operations
• Process Managemento Over/under loadingo Stop timeo Black belt time
Processing• Identify bottle necks and
pinch points• Undersized equipment• Monitor wear parts against
tons processed• Identify waste• Energy used per ton• Cost analysis• Help with inventory accuracy
at month/quarter and year-end
Processing• Review real plant availability
information • Run time, black-belt time,
scheduled time• Track down time• Belt start and stop times• First and last time the belt
was loaded• Immediate efficiency
feedback
SiteBeltReport Period
08:49
07:17
01:3217.4% Start time 07:10 Stop time 16:5011 Time of first load 07:55 Time of last load 16:40
Black belt %Number of belt stops
Conveyor Performance Report
Yesterday
Rock Quarry
PrimaryRun time
Run time loaded
Black belt run time
Primary
0
2
4
6
8
10
07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00Stopped time Black belt time Loaded time
Minutes
83%Run time loaded
Black belt run time
Processing• Instantaneous Operational
Datao Rate (TPH)o Total Tonso Belt Status
• Zeroing of Scaleso Maintains highest level of accuracy
• Graphical trends of production
• Down time event coding/tracking
Processing• Measuring production
helps:o Ensure stockpile
inventory accuracyo Communicate daily,
weekly, monthly targets• Create connection
between process and product
Effect of empty run (black belt) time
Regional Production MonitoringWhat was the solution?• Installation of belt scales on each site after
the primary crusher• Various pieces of data communication
infrastructure to provide the best solution• Access to Cloud Based Reports by
regional and site management
Internet
Regional Production Monitoring
Solution •Installation of belt scales on each site after the primary crusher •Various pieces of data communication infrastructure to provide the best solution for each site, incl. Ethernet, radio and cellular modem •Access to cloud based reports by regional and site management
Benefits •Monitoring of black belt time after each primary crusher; operating the plant only when material has to be processed •Monitor the performance of all sites with the same type of scale •Consolidate all data in one single data base •Reduce software and hardware variations
Overall reduction in operating cost, reduction in power consumption and maintenance and increase in management productivity by remote monitoring of all sites
Cost improved by 9 cents/ton,With a system that costs about 1.5 cents/ton (over 7 years)
• 5% reduction in black belt time
• 1% reduction in maintenance costs
• Reduced downtime events
ROI: Processing Summary
Additional Benefits 1.Improved Employee Satisfaction
o Less manual reporting, less data re-entry → hiring and training costs
2.Improved Safety o Keep people away from heavy machinery when not necessary → priceless
Performance metrics improved
• Throughput per hour, cycle times • Utilization • Cost per hour • Sales / Extraction ratio • Customer Satisfaction
Financial Benefit Achieved
Cost improved by 37 cents/ton, With an investment of 5.2 cents/ton (over 7 years)