pipeline opportunities...
TRANSCRIPT
Source: Silent Majority Strategies
$15 MILLION
Producers lose every Calculating
DRY GAS ALONE
day vs. HH discount
MARCELLUS FLOW REVERSAL
13 Major
Projects
scheduled
v
$28.4B Estimated
CapEx
3,339 Cumulative
Miles of Pipe
84
Estimated
Spread Count
Spreads
MARCELLUS PROJECTION
0
10
20
30
40
50
60
Bcf/d
Historical Forecast
Source: EIA US Energy Administration, BTU Analytics
Bcf/d
0
5
10
15
20
201920182017
New
Existing
0
4000
8000
12000
16000
20000
MARCELLUS GAS REVERSAL
9,460 MMcf/d
Mill
ion
Sta
nd
ard
Fee
t /
day
(M
Mcf/d
)
2018
2017
7,222 MMcf/d
Source: EIA; BTU Analytics
MAP OF 13 PROJECTS
Marcellus
Utica & Marcellus
Utica
Source: With thanks to TransCanada Midstream Team
THE BOOTS
• Well defined scope • Early involvement • Culture of safety
Successful Contractor
• Talent Field Experts • Operational Execution • Trusted Partner
Valuable Expertise
THE BREAKTHROUGH
by 2018, 2.44 billion people will be using
social networks, up from 970,000 in 2010.
00:01
+
GRANDPARENTS -
Fastest Growing Users
INCREASE IN
ACTIVE USERS 79%
Source: WeForum.Org; GrowingSocialMedia.com
71% LARGEST PROFESSIONAL
NETWORK ON THE PLANET
2 New Users Every Second
00:01+ 433 MILLION
USERS
Source: Alan Armstrong, CEO of Williams Cos; The Moral Case for Fossil Fuels
NYC clean today, thanks to Natural Gas
50Years
Global Energy generated by Wind/Solar
1%
Decrease US Air Pollution 1980 -2012
49% 49% 50
1% 20%
“The Lowest 20% of Earners Spend 10% of Income on Electricity Alone.”
20%
Pip
elin
e O
pport
unitie
s Confe
rence
ENERGY FUELS THE WORLD 1. “NYC is the
cleanest it’s ever
been in 50 years
and we have
Natural Gas to
thank for that.”
2. “The Lowest 20% of
Income Earners
Spend 10% of
Income on
Electricity Alone.”
3. Despite increased
fossil fuel use, US
Air Pollution has
decreased 49%
from 1980-2012
(during that time
Fossil Fuel Usage
has increased 71%
WW)
4. Simple fact, you
can’t build a
windmill with a
windmill (steel
components)
NATIONWIDE S U P P O R T
UNPARALLELED OPERATIONAL
EXECUTION
WILLBROS
REPUTATION
S T R E N G T H
3,000 EMPLOYEES
PIONEER INDUSTRY
109
YEARS OF EXCELLENCE:
0.63 TRIR 2016 YTD
SAFETY
UTD Oil & Gas Canada Lineal Engineering
PIPELINE
2 - 200 miles
8 - 48’’
FERC Projects
Midstream Gathering
FACILITIES
Compressor stations FERC
Pump Stations
Cryo Plant
Interconnect
INTEGRITY
Lift & Relay
Pig launcher & receivers
Maintenance
Hydrotest
TANKS
Field erected steel, above ground storage facilities
LINEAL INDUSTRIES
Pipelines 1-10 miles, 8-24’’
Midstream
Integrity
HIRE WILLBROS
For a talented construction team with
phenomenal execution, call Willbros.
Courtney McShane can be reached at:
713.403.8056 Connect on LinkedIn
Courtney McShane is a millennial, a business strategist, and energy advocate who loves
construction boots so much she wore them at her wedding. As Director of Business
Development for Willbros, she is expanding its presence throughout the Marcellus Shale and
Eastern Seaboard. Her career launched in high tech, driving global marketing for EMC before
being hired by PLH Group to represent its pipeline construction businesses. Her Bachelor’s
and MBA are from Bentley University.