Pinnacle Point
Planning & Zoning Commission
Pinnacle Point Office Campus
February 4, 2016
Pinnacle Point
Pinnacle Point
Request:
We would like to develop Pinnacle Point, a six-
building office village on S. Kimball Avenue.
The buildings will be built in phases, with two
buildings built per phase.
We are asking for Zoning Change to Office and
Site Plan Approval for 2 of the 6 buildings
proposed.
Pinnacle PointTimeline:
May 2015: Initial staff meetings and feedback
June-August 2015: Design work by architects and engineers
September 2015: Initial submittal to staff for review
October 2015: SPIN meeting
Formal submittal to staff for zoning change and site plan
approval
November 2015: Staff asked for traffic study
Staff asked us to work with neighboring developer to
develop small-area mobility plan
December 2015: Staff asked us to design and present mobility plan to
Corridor Planning Committee; required site plan
redesign and ROW dedication to accomplish plan
January 2016: Back in the queue for P&Z and Council approval
Pinnacle Point
Site
Location
Pinnacle Point
Pinnacle Point
Original Concept
Plan:
128,000 SF
-Too Dense
-Too Regimented
-Tree Loss at Kimball
Pinnacle Point
Our Office
Village
Concept
Plan
Revised Plan:
121,000 SF
-Less Dense
-Park Areas
-Keeps Trees
-Water Feature
-ROW Dedicated
Pinnacle Point
Phase 1
consists of
Lots 1 and 2
Pinnacle Point
Site Location as
shown on the
Southlake 2030
Kimball/Crooked
Small Plan Area
Pinnacle Point
Southlake 2030
Plan shows
recommendation
of land use change
to Mixed Use from
Residential
Pinnacle Point
Our Concept
Plan shown within the
Southlake 2030 Small
Area Plan
Recommendations
Pinnacle Point is an
office use which is
compatible with the
Mixed-Use land
designation
Pinnacle Point
Proposed Elevations and Floorplans
Pinnacle Point
Typical
Elevations
of Buildings
Pinnacle Point
Typical
Floor Plan
of Buildings
Pinnacle Point
Renderings
Pinnacle Point
Rendering
North West
Perspective
Pinnacle Point
Rendering
South West
Perspective
Pinnacle Point
Rendering
South West
Bird’s Eye View
Pinnacle Point
Timing:
If approved, construction on the first two buildings
would commence in mid-2016.
Pinnacle PointQuestions?
David Karr
Brown Company Partners
(214) 506-3205
Jimmy Fechter
Adams Engineering
(817) 328-3215
THANK YOU VERY MUCH