persemaian permanen cimanggis - forda-mof.org persemaian.pdf · pemeliharaan bibit mandor...

22
PERSEMAIAN PERMANEN CIMANGGIS DISAMPAIKAN PADA : ACARA PELATIHAN KEHUMASAN PUSAT HUMAS KEMENTERIAN KEHUTANAN RI Oleh : Dr. Ir. Bedjo Santosa, M.Si. DIREKTUR BINA PERBENIHAN TANAMAN HUTAN Cimanggis, 15 Juni 2011

Upload: truongkiet

Post on 14-Feb-2018

292 views

Category:

Documents


11 download

TRANSCRIPT

  • PERSEMAIAN PERMANENCIMANGGIS

    DISAMPAIKAN PADA :

    ACARA PELATIHAN KEHUMASAN

    PUSAT HUMAS KEMENTERIAN KEHUTANAN RIOleh :

    Dr. Ir. Bedjo Santosa, M.Si.

    DIREKTUR BINA PERBENIHAN TANAMAN HUTAN

    Cimanggis, 15 Juni 2011

  • ALUR PIKIR PENYEDIAAN BIBIT

    PERSEMAIAN

    OBIT

    Tanaman 500.000 ha/tahun

    (Kontrak kerja Menhut KIB II Presiden RI)

    Permanen

    Non Permanen KBR

    KEMENHUT

    HTI, HTR, RHL, HKm, HD

  • Menetap pada satu lokasi,

    Organisasi dan personil pelaksana yang

    tetap,

    Memiliki sarana, prasarana dan teknologi

    mutakhir,

    Memproduksi bibit tanaman hutan

    berkualitas dalam jumlah besar dan

    berkesinambungan.

  • Dilakukan untuk mengetahui tingkat kelayakan lokasi pembangunan persemaian permanen ditinjau dari aspek teknis, ekonomi dan sosial.

    Kelayakan dimaksud antara lain :> Aksesibilitas yang baik> Lokasi relatif datar dan tersedia sumber air> Representatif terhadap sasaran lokasi penanaman> Ketersediaan tenaga kerja> Kebutuhan terhadap bibit tanaman hutan tinggi> Biaya produksi ekonomis

  • Pemerintah Provinsi/Kab./Kota

    menyediakan lahan calon lokasi

    persemaian permanen berupa kawasan

    hutan atau tanah negara lainnya dengan

    kondisi clear and clean

    Cimanggis : 1,8 ha

  • Kebutuhan sarana dan prasarana persemaian

    Tata letak (denah) masing-masing sarana dan

    prasarana yang disesuaikan dengan arus proses

    produksi

    Spesifikasi teknis dan gambar masing-masing sarana

    prasarana

    Analisis kegiatan dan biaya.

    Tata waktu.

    RANCANGAN TEKNIS

  • Tempat penumpukan dan pengolahan media (media emplacement).

    Rumah kaca untuk perkecambahan dan perakaran (germination house/rooting area), dibuat dari plastik yang tahan 5 tahun.

    Runah kaca ubtuk sumber benih (mother plant) Ruang perbanyakan vegetatif dan generatif (propagation house)

    Areal pemuatan bibit (loading emplacement) Sarana irigasi (pompa air, Sprinkle/fogging/boom irrigation, dan lain-lain).

    Pottray/solidtube/polytube. Ruang panel kontrol (control panel room). Kantor dan rumah jaga. Gudang. Genset.

  • Pimpinan pelaksana Pelaksana Teknis Persemaian, Pelaksana sarana dan prasarana,Mandor Penyiapan Media, Mandor Penaburan dan Penyapihan, Mandor Pemeliharaan Bibit, Mandor Seleksi dan Pengangkutan,

    Regu Kerja.sementara 13 orang

    ORGANISASI PELAKSANA

  • Regu ReguReguReguRegu

    Pelaksana TeknisPersemaian

    PelaksanaSarana dan Prasarana

    MandorPenyiapan

    Media

    MandorProduksi dan

    Pemeliharaan Bibit

    Mandor Distribusi

    MandorSarana

    MandorPrasarana

    Manager Persemaian

    Pelaksana ADM dan Keuangan

    STAF

  • Produksi bibit tanaman hutan dilakukan secara terus menerus untuk memenuhi kebutuhan bibit sepanjang musim tanam di wilayah abodetabek.

    Jenis sesuai dengan kondisi setempat (kayu-kayuan akasia, eucalyptus, malaleuca, MPTS).

    Jumlah produksi bibit disesuaikan dengan kapasitas persemaian permanen yang dibangun.

  • Tempat/bangunan untuk memelihara tanaman induk yang menghasilkan bahan perbanyakan tanaman secara vegetatif yang memiliki kualitas dan sifat yang sama dengan pohon induknya

  • Bangunan yang dirancang untuk membesarkan hasil pembiakan

  • Area terbuka yang dipersiapkan untuk aklimatisasi bibit dari rooting house untuk bibit hasil pembiakan vegetatif

  • Bangunan untuk melakukan proses penanaman stek ke potray/polytub atau proses penyapihan bibit dari germination house ke polybag.

  • No. S a tua n Vol Ukura n Harg a S atuan J umla h

    I

    1 mac am 1 40,000,000 40,000,000

    2 unit 1 10x 40 m2 10,000,000 10,000,000

    3 unit 1 5x 10 m2 25,000,000 25,000,000

    4 Media preparation room unit 1 5x 10 m2 50,000,000 50,000,000

    5 unit 1 5x 10 m2 50,000,000 50,000,000

    6 unit 1 5x 10 m2 75,000,000 75,000,000

    7 unit 4 0,5x 3x 2 15,000,000 60,000,000

    8 unit 1 5x 10 m2 75,000,000 75,000,000

    9 unit 1 10x 20 m2 160,000,000 160,000,000

    10 unit 1 20x 20 m2 180,000,000 180,000,000

    11 unit 1 5.000 m2 80,000,000 80,000,000

    12 unit 1 200 m2 20,000,000 20,000,000

    13 meter 100,000,000

    14 meter 100,000,000

    15 unit 75,000,000 75,000,000

    1,100,000,000

    16 100,000,000

    17 150,000,000

    18 K euntungan perus ahaan 150,000,000

    1,500,000,000

    II B IA Y A O P E R A S IO NA L

    1 paket 1 150,000,000

    2 unit 500,000,000

    650,000,000

    III

    1 bt 1 juta 600 600,000,000

    2 paket 1 150,000,000

    750,000,000

    IV

    1 paket 1 100,000,000 100,000,000

    100,000,000

    3,000,000,000 TO TAL

    R ancangan

    J um lah

    B iaya pers onil

    B IA Y A TIDA K TE TA P

    P roduks i bibit

    B iaya pers onil

    J um lah

    J um lah

    P embelian kontainer

    R uang C ontrol panel

    Irigas i

    K antor

    P engawas an

    S ub Total

    J um lah

    P ekerjaan parit

    A NC AR-A NC AR BIA Y A P EMBA NG UNA N P ERS EMAIAN P ERMA NEN

    KAP AS IT AS 1.000.000 S /D 1.500.000 Batang /T ahun

    B IA Y A P E R E NC A NA A N

    P ekerjaan jalan

    P ropagation hous e

    S haded area

    P ajak-pajak

    Open area

    L oading emplac ement

    K eg iatan

    P ers iapan lahan

    A real parkir

    G ermination rack

    Media E mplacement

    G udang

    B IA Y A INV E S TA S I

  • No S atuan Vol Ukuran Harga S atuan J umlah

    I.

    1 mac am 1 60,000,000 60,000,000

    2 unit 1 10x40 m2 15,000,000 15,000,000

    3 unit 1 5x10 m2 25,000,000 25,000,000

    4 Media preparation room unit 1 5x10 m2 50,000,000 50,000,000

    5 unit 1 5x10 m2 50,000,000 50,000,000

    6 unit 1 5x10 m2 75,000,000 75,000,000

    7 unit 6 0,5x3x2 15,000,000 90,000,000

    8 unit 1 5x10 m2 75,000,000 75,000,000

    9 unit 2 10x20 m2 160,000,000 320,000,000

    10 unit 2 20x20 m2 180,000,000 360,000,000

    11 unit 1 10000 m2 120,000,000 120,000,000

    12 unit 1 300 m2 30,000,000 30,000,000

    13 meter 100,000,000

    14 meter 160,000,000

    15 unit 100,000,000 100,000,000

    1,630,000,000

    17 150,000,000

    18 200,000,000

    19 K euntungan perusahaan 200,000,000

    2,180,000,000

    II B IAYA O P E R AS IO NAL

    1 paket 1 175,000,000

    2 unit 1 jt 750 750,000,000

    925,000,000

    III.

    1 bt 2 jt 600 1,200,000,000

    2 paket 1 175,000,000

    1,375,000,000

    IV

    paket 1 120,000,000 120,000,000

    120,000,000

    4,600,000,000

    ANC AR -ANC AR B IAY A P E MB ANG UNAN PE R S E MAIAN P E R MANE N

    K AP AS IT AS 2.000.000 s /d 3.000.000 B atang /T ahun

    K antor

    Areal parkir

    Media E mplacement

    P ers iapan lahan

    B IAYA INVE S TAS I

    K egiatan

    Gudang

    O pen area

    P engawas an

    P ajak-pajak

    B IAYA TIDAK TE T AP

    S ub T otal

    P embelian kontainer

    B iaya pers onil

    J umlah

    T O T AL

    R ancangan

    J umlah

    J umlah

    B IAYA P E R E NC ANAAN

    J umlah

    P roduks i bibit

    B iaya pers onil

    Germination rack

    P ekerjaan parit

    P ekerjaan jalan

    Irigas i

    Loading emplac ement

    R uang C ontrol panel

    P ropagation house

    S haded area

  • LAPORAN MUTASI BIBIT PRODUKSI TAHUN 2010PERSEMAIAN PERMANEN CIMANGGIS

    BULAN JUNI 2011

  • Lanjutan

  • Lanjutan

  • TERIMA KASIH