Page 1: Performance management   a new paradigm

Increasing the

probability of a positive outcome

Predictive Performance

Analytics

Applied People Intelligence ©

Page 2: Performance management   a new paradigm

The Current Performance Paradigm

Metrics are important for managing performance: If we can measure it, we can manage it

Metrics need to be SMART:

The less ambiguous a metric, the better it is

Metrics should be task specific: Measurement needs to be directly related to the context

of the job

Page 3: Performance management   a new paradigm

The Current Performance Paradigm

These paradigms are valid when the purpose is to:

Communicate: Tell people specifically how and where to focus their energy and effort

Motivate: Reward people for the accomplishment of

a specific goal or outcome

Page 4: Performance management   a new paradigm

An Additional Performance Paradigm

These paradigms are NOT valid if the purpose is to:

Diagnose: Understand why someone is not achieving a specific goal

Predict: Determine the likelihood that someone will

successfully achieve a goal

Page 5: Performance management   a new paradigm

An Additional Performance Paradigm

The new approach is not a substitute for the current performance paradigm

But

It is an additional perspective for increasing the probability of a successful outcome

Page 6: Performance management   a new paradigm

Using both performance paradigms

Situation: Performance manage your country’s soccer team to win the next World Cup Existing paradigm (Metrics): Communicate: Score more goals than the other team Reward: $1 million per player New paradigm (Analytics): Diagnose: What dimension/s of performance are required for success? e.g. the ability of the captain to motivate the team when down Predict: What is the likelihood that this will happen? i.e. does the captain have the ability to motivate others?

Page 7: Performance management   a new paradigm

When the current paradigm fails

1 slight change Communicate: Score an average of 2 goals per game Reward: $1 million per player What will this communicate and how will it motivate? •  Individual performance is more important that team performance •  Failure to score 2 goals in one game (against a tough team) can be

compensated for by scoring more goals in another game (against an easier team)

•  It doesn’t matter if the other teams score 3 goals each game, as long as you score an average of two.

•  Making enough money to pay the R 1,000,000 is not my problem. •  I have no interest in whether anyone else gets a bonus, and therefore

they will have no interest in me achieving mine. •  If I score an average of 1.8 goals per game, I still want some bonus,

and if I average 2.5, I want a bigger bonus, regardless of how we perform in the league.

Page 8: Performance management   a new paradigm

Why the old paradigm gets in the way

“Metrics are important for managing performance”

If we can measure it, we can manage it

While this is partly true, it relies on “managing” after the fact, i.e. only when the person is off target, or has missed the target, which may be 12 months later, can you act. The new paradigm relies on predicting what factors may cause the person to miss the target before they even start trying to achieve it. You can then proactively allocate, or re-allocate, resources to prevent failure and support success.

Page 9: Performance management   a new paradigm

Why the old paradigm gets in the way

“Metrics need to be SMART”

The less ambiguous a metric, the better it is

Once again, this is useful if the task or outcome is not particularly complex, i.e. it does not rely on the co-operation of, or collaboration with other people or functions; it is achievable in the short term; the environment doesn’t require constant adaptation to changing conditions etc. The new paradigm deals with dimensions of performance, e.g. the quality of the work a team produces; the ability of a person to deliver (any result) on time; the ability of a group to innovate (when the specific outcome is undefined). Most work takes place in a changing, ambiguous, undefined context. By being able to focus on the dimension of performance, the specific outcome can adapt to the specific context.

Page 10: Performance management   a new paradigm

Why the old paradigm gets in the way

“Metrics should be task specific”

Measurement needs to be directly related to the context of the job

Although specific goals may change as targets shift, new projects are rolled out, processes change and people move, research has shown that performance against a specific dimension, e.g. on-time delivery remains relatively constant. The new paradigm recognizes that if time management, priority setting and technical proficiency are not strengths of a particular individual, they will consistently struggle to deliver on time, regardless of whether it is a new project, a new process or a new team (unless the team are able to compensate for the weaknesses). In other words, the likelihood that someone with a certain behavioral profile will change their behavior, and therefore have a different performance outcome, is limited.

Page 11: Performance management   a new paradigm

What we know from research

1.  There are certain generic predictors of performance:

•  Energy and drive (achievement orientation) •  Conscientiousness (big 5 personality factor) •  Social awareness (Emotional Intelligence) •  Functional competence (Technical proficiency)

2.  Job specific/contextual requirements

•  Extraversion (Sales) •  Agreeableness (customer service) •  Conscientiousness (Engineering) •  Emotional stability (call centers) •  Openness to new experiences (creativity/innovation)

Can we expand these dimensions to predict the probability that an individual will successfully achieve a given performance outcome based on the role they are required to play?

Page 12: Performance management   a new paradigm

How a performance issue is described

When managers see a performance problem for an individual contributor, they may often describe it like this: •  Low personal motivation/Lack of drive •  Negative attitude/Lack of willingness •  Lack of initiative/proactivity •  Lack of technical competence/ability •  Lack of autonomy/Inability to work independently •  Poor quality of work/output •  Low personal productivity/ Poor use of time •  Inconsistent delivery/Lack of reliability •  Lack of responsiveness/Slow reaction time •  Lack of teamwork/collaboration •  Poor customer service level

There is a direct correlation between these observed performance dimensions and the behavioral characteristics of the individual.

Page 13: Performance management   a new paradigm

Identifying the underlying cause

Observed behavior: Poor quality of work/output Underlying behavioral attributes are:

Attribute Definition

Bright Has difficulty grasping complex concepts or ideas, oversimplifies them and lacks the necessary depth of understanding

Demonstrates good

judgment Shows poor judgment and does not anticipate the consequences of decisions, or has taken wrong decisions previously

Detail-orientated Appears disorganized and lacks attention to detail Improves Processes Overlooks or appears to be disinterested in opportunities

to improve work processes Technically Competent Lacks critical functional and technical knowledge and skills

to do the work

Diagnose and Predict

Page 14: Performance management   a new paradigm

Performance dimensions differences

1.  By level

•  Individual •  Supervisor/Team Leader •  Specialist •  Senor Manager/Executive

2.  By role

•  Innovation •  On time delivery •  Credibility •  Resource management •  Quality of output •  Responsiveness •  Motivating a team

Page 15: Performance management   a new paradigm

Summary

1.  The new performance paradigm does not replace the current one that is “metric-centric”, it compliments it.

2.  The new paradigm is future-focused and creates the ability for diagnosis (why something happens) and prediction (what will most likely happen).

3.  The new paradigm works with dimensions of performance, rather than with specific targets and goals, which more closely aligns with the need for people and companies to adapt to changing conditions.

4.  The new paradigm correlates behavior with the ability to achieve a particular performance outcome when someone is acting in a specific role.

5.  The new paradigm recognizes that behavioral change can be difficult and take a long time to occur. A person’s ability to achieve a performance outcome that is dependent on their strengths is significantly better than their ability to achieve an outcome that depends on their weaknesses.

6.  The purpose of the new paradigm is to increase the probability of a successful outcome by identifying the possible causes of failure ahead of time and taking steps to minimize or neutralize them.

Page 16: Performance management   a new paradigm

PeopleTree Talent Analytics

Martin Sutherland Global Director +2783 453 1593 [email protected]