parramatta road improvement work, leichhardt - september 2019 · 2019-09-16 · improvement work,...

3
September 2019 Parramatta Road improvement work, Leichhardt Parramatta Road and Norton Street, Leichhardt We’re planning to improve trafc fow along Parramatta Road between Rofe Street and Cannon Street, Leichhardt to make your journey easier, faster and safer. Easing congestion and improving travel times Reducing the number of vehicles blocking trafc on Parramatta Road at the Crystal Street right turn A 725 metre section of Parramatta Road between Rofe and Cannon Streets is being improved. This work is planned to start in October 2019 and includes: extending the right turn lane into Crystal Street from Parramatta Road by about 180 metres relocating two bus stops, on each side of Parramatta Road permanently removing parking spaces on Parramatta Road between Rofe and Renwick Streets and Cannon and Crystal Streets for the new bus lane configuration removing sections of the existing kerbside bus lanes in each direction removing the ‘left turn only buses excepted’ condition at the Norton Street intersection installing new pavement surfacing and line markings. We have included a map over the page showing the details and location of the work.

Upload: others

Post on 30-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Parramatta Road improvement work, Leichhardt - September 2019 · 2019-09-16 · improvement work, Leichhardt . Parramatta Road and Norton Street, Leichhardt . We’re planning to

Generic

September 2019

Parramatta Road improvement work, Leichhardt

Parramatta Road and Norton Street, Leichhardt

We’re planning to improve trafc fow along Parramatta Road between Rofe Street and Cannon Street, Leichhardt to make your journey easier, faster and safer.

Easing congestion and improving travel times

Reducing the number of vehicles blocking trafc on Parramatta Road at the Crystal Street right turn

A 725 metre section of Parramatta Road between Rofe and Cannon Streets is being improved. This work is planned to start in October 2019 and includes:

• extending the right turn lane into Crystal Street from Parramatta Road by about 180 metres

• relocating two bus stops, on each side of Parramatta Road

• permanently removing parking spaces on Parramatta Road between Rofe and Renwick Streets and Cannon and Crystal Streets for the new bus lane configuration

• removing sections of the existing kerbside bus lanes in each direction

• removing the ‘left turn only buses excepted’ condition at the Norton Street intersection

• installing new pavement surfacing and line markings.

We have included a map over the page showing the details and location of the work.

Page 2: Parramatta Road improvement work, Leichhardt - September 2019 · 2019-09-16 · improvement work, Leichhardt . Parramatta Road and Norton Street, Leichhardt . We’re planning to

Cat

heri

ne S

tree

t

Bal

mai

n R

oad

N

Hay

Str

eet

Left turn only buses excepted signs to be removed

Cry

stal

Str

eet

Phill

ip S

tree

t

Cha

rles

Str

eet

Nor

ton

Stre

et

Rai

lway

Str

eet

Pete

rsha

m S

tree

t

Ren

wic

k St

reet

Rof

e St

reet

Parramatta Road

Disclaimer: This report has been generated by various sources and is provided for information purposes only. Spatial ServicesServices gives no warranty in relation to the information, especially material supplied by third parties. Spatial Services acce report.

does not warrant or represent that the information is free from errors or omission, or that it is exhaustive. Spatial

does not warrant or represent that the information is free from errors or omission, or that it is exhaustive. Spatialpts no liability for loss, damage, or costs that you may incur relating to any use or reliance upon the information in thisLegend

Parking spaces removed

Bus lane

Bus stop to be relocated

Relocated bus stop

Median strip

0

Scale 1:1000m

10 20 30 40

Our work schedule

Our work will be done in up to four shifts, weather permitting. We’ll mainly work at night to minimise impact on trafc and for the safety of our workers and road users. Our work will take place during:

• 8pm and 5am, Sunday to Friday morning • 8pm Friday to 8am Saturday • 8pm Saturday to 9am Sunday. Some work may also be carried out during the day where there is no impact or change to trafc.

Details confrming dates the work will take place will be provided when our work plan is fnalised.

How will our work afect you?

Our work may be noisy at times but we’ll do everything we can to minimise its impact, including completing the noisier tasks by 1am.

We’ll install temporary noise barriers around our work zone and only low noise reversing alarms will be used on trucks. We’ll also help to reduce noise by turning of machines and vehicles when they are not being used.

We’ll provide you with advance notice of any noisy work and trafc impacts.

Trafc changes and pedestrian access

We’ll implement some temporary trafc changes for the safety of motorists, pedestrians and workers.

In addition to the parking being permanently removed on sections of Parramatta Road, lane closures on Parramatta Road and a temporary 40 km/h speed limit during our work hours.

There may also be some impact to street parking. We will notify you in advance if you will be impacted.

There will be no impact to pedestrian access and access to the bus stops on Parramatta Road.

Please keep to speed limits, follow signs and trafc controllers directions at all times. Trafc changes may afect travel time.

For the latest trafc updates: Call 132 701 Visit livetrafc.com Download the App Live Trafc NSW App

Page 3: Parramatta Road improvement work, Leichhardt - September 2019 · 2019-09-16 · improvement work, Leichhardt . Parramatta Road and Norton Street, Leichhardt . We’re planning to

Other projects in the area WestConnex M4-M5 Link Tunnels We are building twin tunnels to connect your journey from the New M4 at Haberfeld with the New M5 at St Peters. These tunnels will accommodate up to four lanes of trafc in each direction and help ease congestion on Victoria Road and City West Link.

Construction is underway and scheduled to open to trafc in 2023.

WestConnex New M4 The New M4 Tunnels opened in July and are the frst underground section of WestConnex, extending around 6.5 kilometres from Homebush to Haberfeld.

The twin tunnels are three lanes in each direction and bypass up to 22 sets of trafc lights.

Contact our team Thank you for your patience while we complete this important work. Please contact us if you have any questions.

rms.nsw.gov.au/PRIWL

[email protected]

1800 951 212

Roads and Maritime Services Network Integration team Locked Bag 928, North Sydney NSW 2059

If you need help understanding this information, please contact the Translating and Interpreting Service on 131 450 and ask them to call us on 1800 951 212.

Privacy Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998 (“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of assisting the assessment of this proposal. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS. You have the right to access and correct the information if you believe that it is incorrect.