Pacific Gas and Electric Company September 21, 2016 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014 Michael A. Ginn Manager Emergency Planning Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.6300 Internal: 691.6300 Fax: 805.545.6265 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54, 10 CFR 72.32 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update Dear Commissioners and Staff: In accordance with 10 CFR 50.54, and including the requirements of 10 CFR 72.32 for the Independent Spent Fuel Storage Installation, Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to Emergency Plan (E-Pian) Implementing Procedure OM10.1D1, "Maintaining Emergency Preparedness." The associated enclosures are listed below: Enclosure Title 1 Diablo Canyon Power Plant Emergency Plan Implementing Procedures, Revision Numbers for Emergency Plan Implementing Procedures 2 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure OM10.1D1, Revision 14, "Maintaining Emergency Preparedness'' PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Pian, and that the E-Pian continues to meet the requirements in Appendix E to 10 CFR 50 and the planning standards of 10 CFR 50.47(b). Therefore, prior NRC approval of the associated changes was not required. A member of the STARS Alliance Callaway Diablo Canyon Palo Verde Wolf Creek

Upload: others

Post on 27-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pacific Gas and Electric Company• · Pacific Gas and Electric Company• September 21, 2016 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014 Michael A. Ginn Manager Emergency Planning

Pacific Gas and Electric Company•

September 21, 2016

PG&E Letter DCL-16-092 PG&E Letter DIL-16-014

Michael A. Ginn Manager Emergency Planning

Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424

805.545.6300 Internal: 691.6300 Fax: 805.545.6265

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

10 CFR 50.54, 10 CFR 72.32

Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update

Dear Commissioners and Staff:

In accordance with 10 CFR 50.54, and including the requirements of 10 CFR 72.32 for the Independent Spent Fuel Storage Installation, Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to Emergency Plan (E-Pian) Implementing Procedure OM10.1D1, "Maintaining Emergency Preparedness."

The associated enclosures are listed below:

Enclosure Title 1 Diablo Canyon Power Plant Emergency Plan Implementing

Procedures, Revision Numbers for Emergency Plan Implementing Procedures

2 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure OM10.1D1, Revision 14, "Maintaining Emergency Preparedness''

PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Pian, and that the E-Pian continues to meet the requirements in Appendix E to 10 CFR 50 and the planning standards of 10 CFR 50.47(b). Therefore, prior NRC approval of the associated changes was not required.

A member of the STARS Alliance

Callaway • Diablo Canyon • Palo Verde • Wolf Creek

Page 2: Pacific Gas and Electric Company• · Pacific Gas and Electric Company• September 21, 2016 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014 Michael A. Ginn Manager Emergency Planning

Document Control Desk September 21, 2016 Page 2

PG&E Letter DCL-16-092 PG&E Letter DIL-16-014

This update does not contain privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans."

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If there are questions regarding this update, please contact me at (805) 545-3446.

Sincerely,

~~n Emergency Planning Manager

bnsm/4540/50868684 Enclosures cc/enc: John M. Goshen, P.E., NMSS Project Manager

Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRR Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)

A member of the STARS Alliance

Callaway • Diablo Canyon • Palo Verde • Wolf Creek

Page 3: Pacific Gas and Electric Company• · Pacific Gas and Electric Company• September 21, 2016 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014 Michael A. Ginn Manager Emergency Planning

Enclosure 1 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014

DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES

Revision Numbers for Emergency Plan Implementing Procedures

Page 4: Pacific Gas and Electric Company• · Pacific Gas and Electric Company• September 21, 2016 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014 Michael A. Ginn Manager Emergency Planning

Proc. No. OM10.1D1* OM10.DC1 EP G-1 EPG-:2 EP G-3 EP G-4 EP G-5 EP OR-3 EP RB-1 EP RB-2 EP RB-3 EP RB-4

EP RB-5 EP RB-8 EP RB-9 EP RB-10 EP RB-11 EP RB-12

EP RB-14 EP RB-14A EP RB-15 EP RB-16 EP R-2 EP R-3 EP R-7 EP EF-1 EP EF-2 EP EF-3 EP EF-4 EP EF-9 EP EF-10

EP EF-11

Enclosure 1 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014

DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES

Rev. 14 8

44 49 58 28 14 10 8 8 7 5

8 27 15 19 14 11

9 2 15 13 33 9

16A 51 38 43 20 11 16

2

Title Maintaining Emergency Preparedness Emergency Preparedness Drills and Exercises Emergency Classification and Emergency Plan Activation Interim Emergency Response Organization Emergency Notification of Off-Site Agencies Assembly and Accountability Evacuation of Non-Essential Site Personnel Emergency Recovery Personnel Dosimetry Emergency Exposure Guides Stable Iodine Thyroid Blocking Access to and Establishment of Controlled Areas Under Emergency Conditions Alternate Personnel Decontamination Facilities Instructions for Field Monitoring Teams Calculation of Release Rate Protective Action Recommendations Emergency Offsite Dose Calculations Plant Vent Iodine and Particulate Sampling During Accident Conditions Core Damage Assessment Procedure Initial Detection of Fuel Cladding Damage Post Accident Sampling System Operating Instructions for the EARS Computer Program Release of Airborne Radioactive Materials Initial Assessment Release of Radioactive Liquids Off-Site Transportation Accidents Activation and Operation of the Technical Support Center Activation and Operation of the Operational Support Center Activation and Operation of the Emergency Operations Facility Activation of the Off-Site Emergency Laboratory Backup Emergency Response Facilities Activation and Operation of the Joint Information Center

Alternate Emergency Response Facilities I Incident Command Post (ICP)

*Revised Document

Page 1 of 1

Page 5: Pacific Gas and Electric Company• · Pacific Gas and Electric Company• September 21, 2016 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014 Michael A. Ginn Manager Emergency Planning

Enclosure 2 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014

Summary of the Analysis of Changes to

Emergency Plan Implementing Procedure OM1 0.101, Revision 14

Maintaining Emergency Preparedness

Page 6: Pacific Gas and Electric Company• · Pacific Gas and Electric Company• September 21, 2016 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014 Michael A. Ginn Manager Emergency Planning

Enclosure 2 PG&E Letter DCL-16-092 PG&E Letter DIL-16-014

Summary of the Analysis of Changes to Emergency Plan Implementing Procedure OM1 0.101, Revision 14

Original Content Content Change Reason for Change

Section 5.7.2. Section 5.7.2. Process change with no change of intent. c. Controlled copies of procedures ·c. Controlled copies of procedures maintained within ERO position maintained within ERO position Steps are being added to provide clear binders shall be audited within seven binders shall be audited within procedural direction. Steps were added to working days of a real event or drill. seven working days of a real event direct documentation of procedure audits These audits satisfy annual audit or drill. These audits satisfy annual and deficiencies and direction on record requirements of AD3.1D5, "Procedure audit requirements of AD3.1D5, retention. These activities were occurring, Distribution and Control." "Procedure Distribution and but were not being documented per

Control. 77

Interdepartmental Administrative 1. Completed audits shall be Procedure AD3.1D5, "Procedure

documented per AD3.1D5. Distribution and Control." 2. Identified deficiencies shall

be documented in the This is not a change of intent within the corrective action program Emergency Plan (E-Pian). The audits will per OM7.1D1, "Problem continue to be done as required by the E-Identification and Plan. This change provides additional Resolution." information regarding documentation

3. Completed audit forms shall requirements established in other station be provided to the site p raced u res. procedure group for processing as records per AD10.1D1, "Storage and Control of Quality Assurance Records."

1 of 1