8
Problem Solving I nnovator Solving Tomorrows Problems Today 8D Report provides a summary of the PSI Reviewing the 8D Report Project Sign Off Management Close out and Approval. Congratulate Team Certificate

Upload: duane-cameron

Post on 23-Dec-2015

220 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: P roblem S olving I nnovator Solving Tomorrows Problems Today 8D Report provides a summary of the PSI 8D Report provides a summary of the PSI Reviewing

Problem Solving I nnovatorSolving Tomorrows Problems Today

8D Report provides a summary of the PSI

Reviewing the 8D Report

Project Sign Off

Management Close out and Approval.

Congratulate Team Certificate

Page 2: P roblem S olving I nnovator Solving Tomorrows Problems Today 8D Report provides a summary of the PSI 8D Report provides a summary of the PSI Reviewing

COVER PAGE

Page 3: P roblem S olving I nnovator Solving Tomorrows Problems Today 8D Report provides a summary of the PSI 8D Report provides a summary of the PSI Reviewing

The above information is ‘pulled forward’ from the PSI Cover page.

The Problem Description information is ‘pulled forward’ from D2 Comparative Analysis.

Team information is ‘pulled forward’ from D1 Team Validation.

Reviewing the 8D Report

Page 4: P roblem S olving I nnovator Solving Tomorrows Problems Today 8D Report provides a summary of the PSI 8D Report provides a summary of the PSI Reviewing

Containment Measures information is ‘pulled forward ‘from D3 Interim Containment Action.

The information below is ‘pulled forward’ from D4 – D6.

D4

D3

Reviewing the 8D Report

Page 5: P roblem S olving I nnovator Solving Tomorrows Problems Today 8D Report provides a summary of the PSI 8D Report provides a summary of the PSI Reviewing

This information is ‘pulled forward’ from D7 Prevention / Lessons Learned & D7 Potential Improvements

The Project Sign Off is where the Team Leader will thank the team for their hard work.

A member of Management will Close Out the PSI by clicking NEXT.

Project Sign Off

Page 6: P roblem S olving I nnovator Solving Tomorrows Problems Today 8D Report provides a summary of the PSI 8D Report provides a summary of the PSI Reviewing

******

Once the password is entered, Management is redirected to the Management Confirmation section, where the Problem Solving Report Actions can be Closed Out and Approved.

Clicking the ‘NEXT’ button will bring up a ‘window’ prompting Management to enter a password.

Management Close out and Approval.

Page 7: P roblem S olving I nnovator Solving Tomorrows Problems Today 8D Report provides a summary of the PSI 8D Report provides a summary of the PSI Reviewing

Once the Problem Solving Report Actions have been Closed Out and Approved, Management can award a Certificate by selecting the ‘Certificate’ button. This will automatically generate a Team Certificate.

Double click on the images to change them.Please Note:A JPEG and GIF image needs to be used

A member of Management will sign the certificate.

Congratulate Team Certificate

Page 8: P roblem S olving I nnovator Solving Tomorrows Problems Today 8D Report provides a summary of the PSI 8D Report provides a summary of the PSI Reviewing

Problem Solving I nnovatorSolving Tomorrows Problems Today

You Have Now Completed all the steps in the PSI.We hope that the PSI has served you well in finding

valuable solutions to ALL your potential problems.

Good Job