p-1469-gh public disclosure...

33
FILE COPY TOv~ CIRCULATtNG COPY FILEY TO BE RETURNED TO REPORTS DESK DOCUMENT OF INTERNATIONAL DEVELOPMENT ASSOCIATION Not For Public Use Report No. P-1469-GH REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED CREDIT TO THE REPUBLIC OF GHANA FOR A WATER SUPPLY PROJECT (SECOND STAGE) June 17, 1974 This report was prepared for official use only by the Bank Group. It may not be published, quoted or cited without Bank Group authorization. The Bank Group does not accept responsibility for the accuracy or completeness of the report. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 24-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

FILE COPY TOv~ CIRCULATtNG COPYFILEY TO BE RETURNED TO REPORTS DESK

DOCUMENT OF INTERNATIONAL DEVELOPMENT ASSOCIATION

Not For Public Use

Report No. P-1469-GH

REPORT AND RECOMMENDATION

OF THE

PRESIDENT

TO THE

EXECUTIVE DIRECTORS

ON A

PROPOSED CREDIT

TO

THE REPUBLIC OF GHANA

FOR A

WATER SUPPLY PROJECT

(SECOND STAGE)

June 17, 1974

This report was prepared for official use only by the Bank Group. It may not be published,quoted or cited without Bank Group authorization. The Bank Group does not acceptresponsibility for the accuracy or completeness of the report.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

CURRENCY EQUIVALENT

Currency Unit Cedi (0)

0 1.00 100 Pesewa

Us$ 1.00 0 1.1538

US$ 1 million = % 1,150,00001.00

US$ 0.8667

O 1 million - Us$ 866,670

FISCAL YEAR

July 1 - June 30

ABBREVIATIONS

CWSC - Ghana Water and Sewerage Corporation

ATMA - Accra Tema Metropolitan Area

Page 3: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

INTERNATIONAL DEVEL[OPMENT ASSOCIATION

REPORT AND RECOMMENDATION OF THE PRESIDENT TOTHE EXECUTIVE DIRECTORS ON A PROPOSE) CREDIT

TO THE REPUBLIC OF GHANA FUR AWATER SUPPLY PROJECT (SECOND STAGE)

1. I submit the following report and recommendation of a proposeddevelopment credit to Ghana for the equivalent of US$10.4 million on standardIDA terms to help finance a water supply project. The proceeds of the Creditwould be relent to the Ghana Water and Sewerage Corporation (GWSC) for 25years, including 6-1/2 years of grace, with interest at 7-1/4 percent perannum. Under collaborative financing arrangements, the Canadian InternationalDevelopment Agency would contribute US$7.5 million equivalent, to be relentat 2-1/2 percent interest with the same repayment and grace periods as thosefor the IDA Credit. An additional US$4.8 million equivalent would be lent bythe African Development Bank directly to GWSC for 22 years, including 5 yearsof grace, with interest at 7 percent per annum.

PART I - THE ECONOMY

General

2. The last economic report on Ghana (R72-223) was distributed to theExecutive Directors on October 3, 1972, and drew attention to the structuralproblems of the economy. An industrial sector mission visited Ghana duringNovember 1973; its report is expected to be issued shortly. An economicmission was in Ghana recently and its report should be available in earlyfall. Country data sheets are attached as Annex I.

3. Gross domestic product in real terms in Ghana increased by about2.5 percent a year between 1969 and 1972, while the population grew at ratesranging from 2.6 percent to 3 percent. Ghana seemed to have been caught inthe downward economic spiral of declining per capita income and consumptionaffecting the capacity of the nation to save and invest. The Government isengaged in trying to break this cycle and is preparing a long-term develop-ment strategy for growth with stability.

4. On external account, Ghana's problem has been excessive dependenceon cocoa exports -- cocoa still accounts for about 70 percent of merchandlseexports. Accordingly, with widely fluctuating cocoa prices and Ghana'sdeclining share of worldwide production, the long-term balance of paymentssituation remains somewhat uncertain.

5. On public finances, there has been a tendency for current budgetexpenditures to rise at a rapid rate and to outstrip revenues which areoverly dependent on cocoa export duties and import taxes. In addition to theimbalance in the government bulget per se, there are a number of public agenciesand enterprises whose activities have not been jl'.iected to adequate economictests, and which are dependent on budget support or bank borrowings.

Page 4: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

6. in describ-ing these basic problems, the last economic report con-cluded tnat, even with vigorous and determined policies on the part of the-overnment, the necessary structural adjustments could only be effected gradually.

ThanaIs structural problems and slow growta should not obscure, however, thestrong points of its economy. Besides being the world's largest cocoa producingand exporting country, Ghana has a variety of mineral resources as well assubstantial timber reserves. There is a reasonably advanced infrastructure.Cocoa production is broad-based and benefits many small farmers. The educationsystem is well established; elementary education has been free and universalsince 1962. Favorable external developments and government policy action overthe past two years have laid the basis for more secure and sustained develop-ment. Ghana has achieved a reasonable degree of monetary stability, made astart in putting its state industries on a sounder economic footing andexercised caution in its public investment decisions.

7. During 1972 and 1973 the balance of payments position improveddramatically. Compared to a trade deficit of about $40 million in 1971, tradesurpluses of about $160 million in 1972 and $100million in 1973 were achieved. In1972 this was in part due to the very substantial retrenchment in importsfollowing the reimposition of an import licensing system. While imports in1973 were expanded to meet the production needs of the economy and to replenishstocks, continuin- high world prices for cocoa, gold and timber maintained atrade surplus. In contrast with the practice in previous years, the surplushas been used to repay some $40 million of Ghana's short-tem debts and tobuild up reserves w1hich stood at about $200 million at the end of 1973, com-pared to about $20 million at the end of 1971.

8. While prospects for continued high world prices for cocoa and goldseem good, the recent increases in petroleum prices are estimated to increaseGhana's import bill by about $100 million and eliminate the anticipatedbalance of payments surplus for 1974. Petroleum imports, which accounted forless than one-tenth of total imports in 1970-72, would account for about 30percent of imported goods in 1974. With the need to meet substa.1tial paymentsobligations and to maintain an adequate level of short-term debt repayment,the overall balance of payments position is likely to become difficult onceagain. Therefore, Ghana will need new aid commitments to supplement the meagreaid pipeline, and it is appropriate that a substantial part of these commit-ments should be on concessionary terms.

9. An agreement for a long-term rescheduling of Ghana's medium-termexternal debt was reached at a meeting in Rome March 11-13, 1974. Under thisagreement, which was announced by the Govermnent of Ghana last April, allpayments due after February 1, 1972 in respect of pre-1966 debt obligationswill be paid over a period of 28 years, including a grace period of 10 years,with an interest rate of 2-1/2 percent per annum. This concludes more thantwo years of negot_ations between Ghana and the creditor countries, in whichthe good offices of the Bank were provided. The rescheduling agreement isexpected to go into effect this summer provided the creditors are satisfiedthat the results of Ghana 's review of the contracts underlying the medium-termdebts do not put in quest-on the basis of the debt settlement. The review is tobe completed by June 30, 1974. The exact impact which the Rame agreement will haveon Ghana's future debt service obligations will of course depend on the outcomeof this review. It iill be affected as well by the extent of the implementation

Page 5: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

- 3 -

of the agreement and its application to creditor countries not represented atthe Rome meeting. These cannot be ascertained now but, given the size ofGhana's debt obligations, the relief obtained should prove to be substantial.

10. In Decmber 1972 the Government announced a new investment policyredefining the ground rules for foreign private investment in Ghana with aview to encouraging more indigenous participation in those sectors which exerta major influence on the economy. The Government is currently engaged innegotiating compensation arrangements with the affected parties; some settle-ments have already been reached.

11. On the basis of the understandings reached at the Rome meeting, andon the assumption that a substantial part of Ghana's external borrowing require-ments will be covered by aid on concessional terms, it is estimated that Ghana'sexternal debt service ratio will average about 5-6 percent in 1974-76 and riseto some 10-12 percent during the remainder of this decade. The Bank Group'sshare of Ghana's total external debt is currently about 12 percent and isexpected to rise but still remain small (14 percent) in relation to otherlenders over the next several years. Similarly, the Bank Group's proportionof Ghana's future debt service is estimated to average 9-11 percent in thenear future. Bank Group lending to Ghana since 1969 has been exclusively onIDA terms because of the large overhang of external debt service inheritedfrom the early 1960s. The agreement to reschedule service of most of themedium-term suppliers' credits should open up possibilities for Ghana toborrow abroad on conventional terms, and it is planned to resume Bank lendingto Ghana in the near future.

PART II - BANK GROUP OPERATIONS IN GHANA

12. The Bank Group has lent Ghana $113.3 million, of which $47 millionwas a Bank loan for the Volta Dam and associated infrastructure in 1962. Theremainder has been lent since 1968 for agriculture, power, water supply andsewerage and roads projects. Annex II contains a summary statement of loansand credits as of April 30, 1974 and notes on the execution of ongoing projects.There are now no major problems in project implementation.

13. Ghana is currently engaged in a major task of restructuring itseconomy, particularly to achieve greater self-sufficiency in agriculturalproducts. Future Bank Group lending will support this objective, as reflectedin the livestock project presented to the Board on June 18, 1974 as we:Ll asan oil palm project which was negotiated recently. A cotton project aind arice project have been appraised and are expected to be presented for con-sideration by the Executive Directors in FY 1975. Follow-up projects in cocoaand fisheries are planned thereafter. Apart from agriculture, the findingsof the industrial sector mission have indicated favorable prospects for pos-sible lending for small-scale industry. In addition, while proportionatelylesS future Bank Group assistance than in the past is planned for infrastruc-tural improvements, some additional lending is contemplated in this field tosupport key institutions. The Bank is assisting Ghana in preparing telecom-munications, power generation and distribution, highway maintenance and feederroad projects.

Page 6: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

PART III - WATER SUPPLY IN GHANA

14. It is estimated that about 40 percent of Ghana's total populationhas access to safe and dependable water supplies. In communities of 5,000

people and above, which account for 30 percent of the total population,between 90 and 100 percent have such access. In the case of the remaining70 percent of the popiulation, only about 15 percent have access to safe anddependable water supplies. While water borne diseases such as dracontiasis(Guinea worn infection) and bilharziasis have been virtually eliminated in

communities provided with piped water, these diseases are prevalent in ruraltowns and villages which have no public water supplies. Such communitiesare also vulnerable to cholera, which broke out in many parts of the country

in 1970-71.

15. National responsibility for the provision, distribution and con-servation of water and for the establishment, operation and control ofsewerage systems has been entrusted to the Ghana Water and Sewerage Corporation(GWSC), established in 1966 under the Ghana Water and Sewerage Act of 1965.GWSC has been concerned primarily with water supply, but comiissio.aed itsfirst sewerage scheme in November 1973. The scheme serves central Accra;the only other sewerage scheme in Ghana is operated by the Tema DevelopmentCorporation, the body responsible for Tema's industrial and residentialdevelopment.

GW.SC: The Management

16. GWSC, the beneficiary of the proposed credit, is a statutorycorporation; and has a Board of seven part-time members including a representa-tive of the Ministry of Works and Housing, to which the Corporation isaccountable. Board members are appointed by the Head of State. The presentmanaging director of GWSC was appointed in late 1973 after serving theCorporation in senior positions for many years. With increased operationsand responsibilities, GWSC's management was decentralized in 1973. 41District Management Centers were created within the Corporation's nineregional organizations, of which the Accra/Tema Metropolitan Area (ATMA) isby far the largest. GWSC has delegated to the District Management Centersprimary responsibility for operations, management and development in theirrespective areas. This arrangement should contribute to increasing theefficiency of the Corporation.

17. The Accra/Tema Metropolitan Area (ATMA) manager was promoted tohis post in early 1973. Although technically sound, ATMA's management needssome reinforcement in its financial administration. The Canadian Inter-national Development Agency (CIDA) is expected to provide the requiredtechnical assistance.

Page 7: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

-5-

GWSCZ The National Investment Program

18. GWSC is currently drawing up for Government approval a nationalinvestment program (presently in a rudimentary form) in the water andsewerage sector for 1975-79. The total cost of the program is estimatedat about US$170 million equivalent, of which about 80-90 percent is expectedto be allocated to the extension of water supplies to communities of lessthan 5,000 people. The objective of the program is to provide 60 percent ofGhana's population with a safe water supply by 1980. The program is to befinanced from the national budget and foreign sources. So far, about US$12million of bilateral assistance has been granted by Canada, Germany andDenmark for the construction of new water supply systems and the extension ofexisting ones, mostly in rural areas. In audition to water supply, the programincludes a sewerage project to be constructed during 1975-79 in Kumasi, Ghana'ssecond largest city. The UNDP has approved a rural water supply and sanitationproject which is expected to provide a basis for a national rural water supplyprogram.

Tariffs

19. In 1973, GWSC sought Government approval for a change in the levelsand structure of its water supply tariffs. The Corporation's proposal was thattariffs for all consumers with private connections in major urban areas shouldbe raised, and that in the remaining communities tariifs should be unchangedand in some cases lowered. The objective of the proposal was to enable GWSCto achieve financial autonomy, while at the same time extending accessibilityto safe water supplies to an increasing number of rural communities. Imple-mentation of GWSC's proposal would have a desirable inter-regional income dis-tribution effect. The Government, however, while agreeing with the proposalin principle, had decided to postpone a country-wide tariff change until allconnections in urban areas have been metered. More recently, in view ofATMA's substantial investment program and the commitment made for the construc-tion of Weija dam, Government approved a new tariff proposal increasing waterrates in the Accra/Tema Metropolitan Area from 40 Pesewas to 60 Pesewas per1,000 gallons in respect of metered supplies to domestic consumers and from90 Pesewas to Cedis 1.35 per 1,000 gallons in respect of metered supplies tocommercial and industrial consumers. This tariff increase of 50 percent isto come into effect and the appropriate regulations issued not later thanAugust 1, 1974.

PART IV - THE PROJECT

20. A report entitled, "Ghana, Appraisal of the Accra/Tema Water SupplyProject - Second Stage", dated May 31, 1974 and numbered 425a-GH is beingcirculated separately to the Executive Directors. A credit and project sum-mary is provided in Annex III.

Page 8: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

-6-

21. This project would be the Bank Group's second credit for watersuuply in Ghana. It is the second stage of the implementation of a masterDlan for water %nd sewerage for the Accra/Tema metropolitan area preparedby consultants in 10('3-70 under a stuay financed by UNDP, with WHO as theexecuting agency. In August 1969, IDA provided a credit of US$5.5 millionequivalent (CredLt o60-GH) to cover the foreign exchange cost of the firststage project consis'ting of the extension of the water distribution systemin Accra and Tema anrd a new sewerage system in Central Accra. These workswere satisfactorily completed in November 197s.

22. The second stage project was first appraised in November 1971 butwas delayed due to t'ne uncertainties created by the initial economic measuresof the Government which assumed office in early 1972 and the precariousfinancial and economic situation in the country at the time. The project wasthen reappraised in March/April 197J, and the appraisal report was updated inFebruary 1974. In view of the substantial increase in the foreign exchangecomponent of the project since it was first appraised and the limited availa-bility of IDA funds, the Government has sought parallel financing from theAfrican Development Bank (AfDB) and the Canadian International DevelopmentAgency (CIDA); and tlese institutions have agreed to provide the requiredfinancing. Approval of AfDB and CIDA contributions or a suitable alternativearrangenent satisfac-,ory to the Association is a condition of effectivenessof the IDA credit. (Section 6.01(d) of the Development Credit Agreement).

Description

23. The project would help increase water supply for the metropolitanarea where the population is growing around 5.b percent annually, as well asadjacent rural areas. The demand for water has increased at an annual rateof 12.5 percent in the last decade; with improved efficiency in the distri-bution works and reduced leakages (from the current 39 percent to about25 percent by 1982) demand is projected to increase at a lower rate of 8percent per annumr until 1978 and 6.5 percent thereafter. The project willexpand the supplies of water from the current level of 8.5 million gallonsto 28 million gaIllons per day and will meet demand in the service area up toabout the mid-e:g,h`ies.

24. The Prolec`- comprises the following components (for details seeAnnex III):

A. IDA-Assiso M2nents

Construction of neu dam at Weija; improvement of existingWeija treatment works; extension of existing secondary andtertiary water distribution system in Accra/Tema; extensionof water supplies in adjacent rural areas; provision ofwater meters and leakage detection eauipment; technicalassistance for tne new sewerage system; training, and con-sulting services for design and procurement.

Page 9: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

-7-

B. AfDB-Assisted components

Civil works for treatment plant and service reservoir; supplyof transmission mains; extension of the existing primary cis-tribution system in Accra/Tema; ana miscellaneous items.

C. CIDA-Assisted comPonents

Raw water pumps; supply of treatment plant; and constructionsupervision for components not financed by IDA.

Project Execution

25. As in the case of the first stage project (Credit 160-GH), ATMAwould be responsible for project implementation. ATnA operates with a con-siderable degree of autonomy and keeps its own accounts (as provided forunder Section h.01 of the Project Agreement). Its operations equal the restof GWSC's operations combined. It is aaequately organized and managed, andsuccessfully implemented the first stage project. However, in view of theproposed additional investment under the second stage project, ATMA requiresassistance in financial management; and CIDA has been approached to providethe required technical assistance (para. 17).

Project Cost and Financing

26. The total estimated costs of the project are summarized below anddetailed in Annex III:

-US $ Million- - -Local Foreign Total Pecenta

Weija Dam and Works 11.73 14.08 25.81 57.6Rbiral Water Supply 2.91 0.48 3.39 7.6Engineering Services

and Training 1.90 2.69 4.59 10.3Contingencies 5.76 5.18 10.94 24-5

Total 22.30 _22_ 44.7t3 100.0

The three external financing agencies (IDA, CIDA, and AfDB) will provide thetotal foreign exchange cost of the project estimated at US$22.4 million. Theproposed IDA credit would be re-lent by the Government to GWSC at 7-1/4 percentfor a term of 25 years, including 6-1/2 years of grace. It is expected that theCIDA contribution would be re-lent at 2-1/2 percent with the same repaymenu andgrace periods as those for the IDA credit and that AfDB's loan would be madedirectly to GWSC at 7 percent per annum for a term of 22 years, including 5 yearsof grace. The following table summarizes the financing of the total projectcost:

Page 10: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

US$ Million Percentage

IDA 10.4 23.3

AfDB 4.8 10.7

CIDA 7.5 16.7

GWSC 14.4 32.3

Goverrnent 7.6 17.0

Total U4-44.*7 100.0

Financial Position and Prosp2ects

27. While GWSC as a whole continues to operate at a deficit and to

require Government subsidies, although on a smaller scale than in 1969, ATMA

has become financially self-sufficient and has been able to earn the 4 per-

cent rate of return in FY 1973 stipulated under Credit 160-GH. Moreover,

the projected debt/equity ratio of at least 58/42 and debt service coverage

of at least 2.2 are satisfactory, a minimxum borrowing limit debt service ratio

of 1.5:1 being provided for under Sectiorn 4.01 of the Project Agreement.

28. ATMA's water revenues are projected to increase from their present

level oi about V5.1 million to 012.0 million by the end of the project con-

struction period. This increase of 135 percent would result from projected

increases in consumption, but more inmortantly from the proposed 50 percent

increase, effective not later than August 1, 1974, in the average tariff

(see para. 19). With the implementation of the proposed tariff increase,

ATYiA is expected to be able to meet its obligations under the Project Agree-

ment (Section 4.02) to earn a rate of return of not less than 7 percent,

except for the last two years of project construction for which a minimum

return of 3 percent was agreed in view of the increase in ATMA's asset base

and the lag between new investments and new revenues. The implementation by

August 1, 1974 of a tariff increase that will provide ATMA with the required

rate of return in its fiscal year ending June 30, 1975 is a condition of

effectiveness of the proposed Credit (Section 6.01 (c) of the Develop,ment Credit

Agreement).

29. The Government has agreed to reimburse GWSC the amount of capital

costs and operating losses relating to financially non-viable projects or

services taken over by GWSC at Government request (Section 4.03 of the Develop-

ment Credit Agreement).

Procurement

30. Contracts for the major project elements to be financed by IDA (dam,

related construction supervision, rural water supplies and extension of

existing secondary and tertiary distribution systems) either have been or will

be awarded on the basis of international competitive bidding in accordance with

IDA guidelines. Consulting services for design and preparation of tenders com-

menced in September 1972; and procurement of goods had to be started in mid-

1975 to permit the commencement of construction in the 1973/74 dry season and

to avoid delays in project execution. Project elements to be financed by CIDA

will be procured under CIDA guidelines, and items to be financed by AfDB will

be procured on the basis of AfDB's international competitive bidding procedures.

Page 11: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

-9-

Disbursement

31. The proceeds of the proposed Credit would be disbursed during theperiod of FYs 1975-78 against the foreign exchange costs of the project com-ponents to be financed by IDA.

32. Retroactive financing estimated at about US$2.0 million is proposedfor the foreign exchange costs of the civil works and technical assistancecontracts for the IDA-assisted project components incurred between September1972 and signature of the Credit.

Justification

33. Water shortages are currently experienced in the Accra/Tema area(with a population of about 900,000) in the dry season. Without the proposedproject, this situation would deteriorate further in the face of populationgrowth and increasing demands from industry and commerce as well as publicand private institutions and domestic households. The rural areas adjacentto Accra/Tewa have only limited supplies of piped water and rely mainly ongenerally polluted ponds, streams and wells. The project would extend safewater supplies to these areas for the benefit of about 200,000 rural people.

34. Studies of alternative sources have shown the Weija scheme to bethe least cost source of water supply for Accra. The only alternativesource, the Volta River at Kpong, was found to be more costly to develop. Itwould require a 48-mile transmission main from Kpong to Accra via Tema, plusassociated pumping facilities, compared to 7 miles of transmission main requiredfor Weija. In addition, the Weija dam would permit continuous use of existingpumping, treatment and transmission capacity which at present is under-utilizedin the dry season due to inadequate river flows.

35. Mhe economic benefits resulting from.the project include substantialunquantifiable benefits which represent one of its main justifications. Iheseinelude first the prevention of a progressive decline in health conditions inAccra/Tema and the improvement of these conditions in the benefitting ruralareas. There are also the anticipated benefits of resettlement. Additionalbenefits may accrue from the possible use of Weija lake for agriculturalirrigation.

36. The facilities at the Weija Dam include minor works required tocomply with a Government plan to allow for irrigation development next tothe Wei.ja site. Preliminary analysis suggests that the irrigation projectwould be feasible and have a substantial economic rate of return. However,its scale and implementation remain to be defined on the basis of a full.feasibility study, as well as an investigation of potential sedimentationin the reservoir. The Government has agreed to establish operational pro-ceduress to determine the allocation of water from the Weija reservoir asbetween public consumption and other purposes and to pay due regard theretoin permitting any development involving water utilization. (Section 4.05of the Development Credit Agreement.)

Page 12: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

- 10 -

Resettlement and Land Acquisition

37. The reservoir to be formed by the dam will inundate about 12square miles, of which 7 square miles have already been acquired by theGovernment in connection with the existing Weija Works. The additionalland is subject to flooding during the rainy season and only a small frac-tion of it is cultivated. There are eight villages within the area with apresent population of about 2,000. A detailed socio-economic survey ofthe villages carried out by the University of Science and Technology,Kumnasi, in 1969 showed that the villages had no infrastructure or socialservices and that the villagers were willing to move to new sites suitablefor resettlement and farming. Resettlement will not disturb traditionalnorms of the villages affected and will in fact improve their standard ofliving by providing them with better housing, roads, water supply, sanitation,health facilities and farming opportunities. Detailed planning and super-vision of resettlement will be undertaken by the University of Kumasi.

Ecological Considerations

38. The feasibility study of the project included a survey to investi-gate possible health hazards that might result from the construction of thenew dam. The survey showed that malaria and bilharziasis are endemic inthe area; the hazard from these diseases should, therefore, decrease whenthe present inhabitants are resettled away from the immediate vicinity ofthe lake and bordering swamps, and provided with piped water and sanitaryfacilities.

39. GWSC are establishing a committee of experts to supervise andcoordinate investigations into the environmental impact of the Weija reservoir,considering not only disease problems,but also water quality and potentialof the reservoir for game or commercial fisheries.

PART V - LIEAL INSTRUMENTS AND AUTHORITY

40. A draft Credit Agreement between the Republic of Ghana and theAssociation, a draft Project Agreement between the Association and GhanaWater and Sewerage Corporation, the recommendation of the Committee providedfor in Article V, Section 1(d), of the Articles of Agreement of the Associa-tion, and the text of a resolution approving the proposed Credit are beingdistributed separately to the JExecutive Directors.

41. Features of the Development Credit and Project Agreements of specialinterest are referred to in paragraphs 19, 22, 25, 27, 28, 29 and 36 of thisReport.

42. I am satisfied that the proposed development Credit would complywith the Articles of Agreement of the Association.

Page 13: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

- 11 -

PART VI - REOMMENDATION

42. I recommend that the Executive Directors approve the proposedCredit.

Robert S. McNamaraPresident

Attachments: Annexes I, II & IIIMaps (3)

June 17, 1974

Page 14: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)
Page 15: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

Page 1 of 3 Pages

OOUNTRY DATA - GHALNA

AREA POPtULTION DENSITY238,537 kin 2(W51lo (mid-1971) 37 Percr

Per id2of arable land

SOCIAL INDICATIORS

Reference CountriesGhana U.K. Tanzania Peru

r~~~~~~9 T~9~70 1-970 19I'70GN' PER CAPITA US$ (ATLAS BASIS) /5 . 250 Ia 2,270 100 550

AIWRAPHICrrStFe th rate (per thousand) .. 7 'h i6.6 47 52Crude death rate (per thousand) .. i 11.S 21 12Infant mortality rate (per thousand live births) 156 /b .. 8.6 i65 /c 75Life expectancy at birth (years) .4 6 72.4 U3 59

Gross reproduction rate A2. 3.2 1.3 3 .2 2.9Population growth rate 13 . 2.6 o.6 2.7 3.1Population growth rate - urban 5 Id o.8 7

Age structure (percent)0-11, h~~~~ ~ ~~~~~~~5 46 25.1 55 iS

15-64 52 52 63.1 53 5265 and over 3 7 12~.a 3 3

De,,endency ratio/A 1.21e O. 9/f 0.6 1./ 1.6

Urban population as percent of total 23 'd 39 'A7I6'd5 /Family Planning,! Na of accPtors -uvlati-a (thou.) . 11 785

No. of users (% of carried wo,sn) *.2A/

EMPlYMENTTotal abor force (thousands) 2,730 3,500 25,250 5,780 S,100

Percentage employed in agriculture 62 58 it 3 91 1,5Percentage uneoploysd .... 5 6

INCOME DISTRIBUTIONPercent of nationai jocose received by highest 5% ... 15 /5 3S /c 3S 1kPercent of national inomse received by highest 20% ... 39 5 60 T, 6- 7W

Pretof national income received by lowest 20% 6 57..27/Percent of nationul inoose received by lowest 40% ... 19 A~ i 72 2 77k

DISTRIBUTION OF LAND OWN1ERSHIP% owned by top 10% of o-wners .% owned by smallest 10% of owners...

HEALTH AND NUTRITIONPopulation Per PhTysician 21,360 12,390) /1 860) 23,130 n/n 2,070Population per nursing person .. 1,530 7?i 290- 2,980 1 i 760 PoPulation per hospital bed .. 790 110 700) 7(t 1o

Per capita calorie supply as % of requirements 5. 85 1

10 69 9SPer capita protein supply , total (grams per dayY~6 .. 3 75 88 S3 58

Of which, animal and pulse . 10 7.- 58 23 iDeath rate 1-5 years /7 ... 0.9 .. 9/5

EDUCATIONAdjusted /8 primary school enrollment ratio 38 56 1l1 37 1 01AdJusted 7ff secondary school enrollment ratio y5 a 72 7 38Tears of s;chooling provided, first and aecond level 15 15 13 13 1iVocational enrollmeest as % of sec. school enrollment 13 /r 15 I5 5 6 16Adult literacy rate 5 .

HOUSINGAverage No. of persons per coos (urban) 0.. .7/s . ./Percent of occupied units withaut piped water... 7 75 20 It 76 Access to electricity (as 5 of total population) . 17 .. 3Percent of z

1ural. population connected to electricity .

CONSUMPTIONIG'Ro rraeivers per 1000 population 17 78 325 11 1 35Passenger care per 1000 population 3 5 215 72/i ms 17Electric petwr consumption (kwh p.c.) 56 / 321 4,291 27 L0PNewsprint consumption p.c. kog per year o.6 O.h 27.7 0.1 3.5

Notes: Figures refer either to t'he latest periods or to account of environsmental temperature, body wihs nthe latest years. Lateat periods refer in principle to dietribution by age aced sex of national popalations.the years 1956-60 or 1966-70; the latest yea~rs in prim- /6 Protein etandlards (requirements) for all coantires as estab-ciple to 1960 and 1970. Only significantly different lished by USDA Economic Resea~rch Service provide for a etimamperiods or years ar footnoted aeparately. allowance of 60 grams of total protein Par day, and 20 grams of/1 The Per Capite CliP estimates for yeare other than 1960 animal and pulse protein, of which 10 grams should be animal

is at market prices, calculated by the same conversion protein. These standards are aomewhat lower than those of 75technique aa the 1972 World Bank Atlas. grazes of total protein and 23 grams of a.nimal protein as a.n

/2 Average number of daughtere per woman or reproductive average for the world, proposed by FAO in the Third World Foodage. Survey.

LI Populatiec growth rates are frr the doeades ending in /5 Some studies have suggested that crade death rates of children1960 ran 1976. apes 1 through 4 may be used as a firet approximation index of/4 Ratio of under 15 and 65 aMd over age brackete to malnutritios.those in labor force bracket of ages 15 through 64. /8 Pmerontage enrolled of cor~responding Population of school age

Li FAD reference standards represent physiological re- as defined for each counrtry.quirements for normal activity and health, taking

Is hesed on a U.N. estimnte Of the CliP lower tha~n the offincia wtio'te: lb U.N. esttsate, /c 1067: /A Towns with a Populationof 5,000 and over: Ie Ratio of population wider 15 and 65 and ovmr to itetl labor force: If Rati.rof Population under iS and65; and over no popsTattnn of l5-65 ace brack~et- Ig Capitals of district, and those nopul_oTed centres witb soch urbe characterloti-nas s treets, plazas, water-supply systamse sewerage wetems, electric light,, etc'

1h Estimate- /i 1969- / 1968.

/k Relates to economically active population: /1 1971 1m Tanganxyika only; /n Includes midwives;

7o 1966-6t., /5 Eonludes Indian

jt ungle population; Is Public eduvation only;/r Vocational enr~ollmsnt. as~ o f secondary public rd,00 tor;0 Is 1 971, urha,/ Urhan only; Is 1961 /v 1 965/71.

Oct-ber 31, 19(3

Page 16: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

Page 2 of 3 pages

ECONOMIC INDICATORS

GROSS NATIONAL PRODUCT IN l970 IJ ANNUAL RATE OF GMOWTHl (%, constant prices)

USE Mln. % 1960 -65 196$ -70 1971

GNM at Market Prices Z 2477 100.0 J.2 2.0G;ross Domestic Investment 318 12.8 4.2 -5.5Gross National Saving 252 10.2 10.3 -11.0Current Account Balance -66 -2.7Exports of G-oods, NFS 465 18.8 4.3 -1.5Imports of Goods, NFS 495 20.0 0.7 -0.4

CUTPUT, LABOR FORCE ANDPRODUCTIVITY IN 1968 /3

Value Added Labor Force a V. A. Per WorkerUS$ MI n M$n.

Agriculture 617 41.8Industry 295 20.0Services 564 33.2Unallocated

Total/Average 176 100.0 100.0 100.0

XOVERTNYET FINANCEGeneral Government Central Government

J Mln-) tsof GDP jedis Nln.) oLcf GDP4197 197 196-7 197017 1970/71 196- 71

Current Receipts 479.4 18.2 15.6Current Expenditure jJ6.0 12.7 14.1Current SurplusCapital Expenditures 3 1.2 45.7External Assistance (net) 19.1 0.7 0.9

MONEY, CREDIT and PRICES 1965 1969 1970 1971 L9 72(iTllion 0%outstanding end period)

Money and Quasi Money 350 388 427 474 666Bank credit to Public Sector 421 480 378 545 674Bank Credit to Private Sector 67 92 126 175 174

(Percentages or Index Numbers)

Money and Quasi Money as % of GDP 16.9 16.7 16.6 17.5General Price Index (1963 = 100) 169.7 151.8 188.8 205.4 295.9

Annual percentage changes insGeneral Price Index 8.1 7.1 3.9 8.8 10.0Bank credit to Public Sector 3.4 .. 21 .2 44.2 23.7Bank credit to Private Sector 10.1 37.3 37.0 38.9

NOTE: All conversions to dollars in this table are at the average exchange rate prevailing during the periodcovered.

/I Total labor force; unemployed are allocated to sector of their normal occupation. "Unallocated1' consistsmainly of unemployed workers seeking their first job.

/2 Based on unrevised conventional National Income accounts and the balance of payments data for 1970converted at the then prevailing exchange rate.

13 Latest years for which the reliable National Income Statistics are available.

/4 In the absence of National Income Statistics for 1971 and 1972, fiscal ratios for more recent yearscould not be given.

Not available

Not applicable

Page 17: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

Page 3 of 3 pages

TRADE PAYIENTS AND CAPITAL FLOWS

BALANCE OF PAYMENTS MERCHANDISE EXPORTS (AVERAGE 1970-71)

1969 1970 1971 1922 US $ Mln %(Millions US $)

Cocoa (beans and products) 279 72.4

Exports of Goods, NFS 385 465 419 455 Gold 26 6.8

Imports of Goods, NFS 397 495 538 329 Timber (logs and sawn timber) 34 8.8

Resource Gap (deficit =1-) -12 -11 9 Diamond 13 3.3Manganese 7 1.8

Interest Payments (net) -20 -23 -21 -5 Al-. other comnodities 26 6.8

Workers' Remittances .. .. .. .. Total 3 100.0

Other Factor Payments (net) -17 -12 -18 -17Net Transfers -2 -1 .. 14

Balance on Current Account -51 6 o T

Direct Foreign Investment 11 66 33 12 EXTERNAL DEBT, DECEMBER 31. 1972

Net MLT BorrowingDisbursements 53 48 49 37 US $ Mln

Amortization -12 -10 -12 -8Subtotal 1T T30 159 Public Debt, incl. guaranteed 621

Capital Grants .. Non-Guaranteed Private Debt

Other Capital (net) _5 +15 +61 -44 Total outstanding & Disbursed

Other items n.e.i 1 -44 +22 +4Increase in Reserves (t) 3 +9 -5 119 DEBT SERVICE RATIO for 1972 L 12.6%

Gross Reserves (end year) 90 75 66 121Net Reserves (end year)&Z, 19 28 14 112 Public Debt. incl. guaranteed

Non-Guaranteed Private DebtFuel and Related Materials Total outstanding & Disbursed

Importsof which: Petroleum

Exportsof which: Petroleum IBRD/IDA LENDING, (April 30, 1974) (Million US$3)

RATE OF EXCHANGE IBRD IDA

ThrouohFebruary 11, 1973 Since February 12, 1973 Outstanding & Disbursed 42.6 24.1

US $ 1.00 = edi 1 .28 US $ 1.00 = Cedi 1 .15 Undisbursed 0.0 34.91.00 = US $ 0.78 l.OO = US $ 0.87 Outstanding incl. Undisbursed 42.6 59.0

/1 Based on estimated export of goods and NFS in 1972 and estimates of debt service paymenTswhich assume full implementation of the 1966, 1968 and 1970 debt rescheduling agreements with

participants in the London conference and conclusion of parallel arrangements with others. A

debt service ratio based on actual payments in 1970 or 1971 would have understated the situation

because of non-implementation of previ9us rescheduling agreementa.

/2 Including SDRs but excluding bilateral balances and trade arrears.

(Date)

Page 18: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)
Page 19: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

ANNEX II

Page 2 of 3 pages

B. PROJECTS IN EXECUTION 1/

Credit No. 160-GH - Water Su,ply and Sewerage; US$3.5 millionCredit of August 28, 1969; Closing Date: June 30, 1974

1. Tlis project comprised the extension of water distribution systemin the Accra/Tama metropolitan area and a new sewerage system in centralAccra. These works are complete. The credit also included the improvement ofthe organization and operations of the national authority responsible forGhana's water supply and sewerage sector. The Ghana Water and SewerageCorporation is now functioning with significantly improved management andsatisfactory financial performance. Only retention payments for contractservices remain to be made, for which the original Closing Date of June 30,1973 was extended to June 30, 1974.

Credit No. 163-GH - Fisheries; US$1-3 million Credit ofSeptember 25, 1969; Closing Date: June 30, 1975

2. This project was to have provided for: (a) the construction offorty purse seiners; (b) credits to fishermen for purchasing such vessels;(c) fishing harbor improvement and expansion studies; and (d) the improvementof the Ghana Industrial Holding Corporation's Boatyard Division. Afterprotracted problems over the design and price of the proposed boats, the numberof boats was reduced to 10, the procurement of their equipment is now virtuallyconcluded. All 10 of the boats should have been sold and delivered by now.Delays have also been encountered in the execution of the harbor studies. Fol-lowing the reduction in the objectives of the project, the Government has agreedto cancel the remaining proceeds of the Credit except for those tunds requiredto complete the final procurement and the port studies. Meanwhile, IDA has beendiscussing with the Government a thorough re-examination of the fisheries sectorand identification of further investment needs for a possible second project.The original Closing Date of December 31, 1972 was extended first to December31, 1973 and then to June 30, 1975.

Credit No. 205-GH - Cocoa Rehabilitation; US$8.5 million Creditof. June 26, 1970; Closing Date: December 31, 1979

3. The project, principally involving the rehabilitation and replantingof 87,000 acres of cocoa plantings, is proceeding quite well. During thefirst year of field works, the replanting targets were met with excellentnursery practices. Control of swoilen shoot virus disease is similarly well

1/ These notes are tesigned to inform the Executive Directors regarding theprogress of projects in execution, and in particilar to report anyproblems which are being encountered, and the action being taken to remedythem. They should be read in this sense, and with the understanding thattVey do notpurportto present a balanced evaluation of strengths andw3aknesses in project execution.

Page 20: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

ANW II

Pa ,e 1 of 3 pages

THE STAITUS OF BANK GROUP OPFATIONS IN GHANA

A. STATENE1T OF BANK LOANS AND Im CREDITS(as at April 309 1974)

Loan or US$ million: Amount (less cancela-Credit lation, termtions & reftundings)Number Year Borrower Purpose Bank IDA Undisbursed

Two loans and three credits fully disbursed 53.0 18.4

160-Gil 1969 Republic of 1iter SupplyGhana and Sewerage 3.5 0.2

163-GH 1969 Republic of ?ishe-iesGharAa Ghana 1.3 1.1

205-GH 1970 Republic of CocoaGhana Rehabilitation 8.5 7.2

354-GH 1972 RepublIc of Sugar Rehabili-Ghana tation Project 15.6 13.3

438-GIH 1973 Republic of First HighueyGhana Project 13.0 13.0

T o t a l 53.0 60.3 34.8of which has been repaid 10.. 0.5

Total now outstanding 42.6 59.8

Amount sold 0.2of which has been repaid 0.2 - -

Total now held by Bank and IDA(prior to exchange adjustmnents) 42.6 59.8

Total undisbursed - 34.8 24*8

NOTE: There have been no IFC investments in Ghana

Page 21: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

AU"EX II

Page 3 of 3 pages

ahead of project requirements. However, the Sahelian drought caused areduction in the acreage of the 1972/73 replanting campaign to 5S percentof the target. Lower annual replantings in the future are likely in addition.An extension of the project period by one year on this account is con-templated. The rehabilitation component of the project previously postponedis now underway. With the elimination of this difficulty, project dis-bursements should now proceed on the scheduled basis.

Credit No. 354-GH - Sugar Rehablxlitation; US$15.6 millionCredit of January 29, 973; Closing Dates March 311 1979

4. Work on the project is proceeding satisfactorily. HVA Internationalhas been assisting Ghana Sugar Estates Ltd. in the operation of the twosugar factories and estates, and t.eld plantings with effective results todate. The Sugar Industry Committete has been established and ADB has writtenoff its unrecoverable debts. Field irrigation and drainage systems arebeing rehabilitated and partially replanted. A survey in August 1973 showedthat the total outgrowers cane area covers about 4,000 acres more thanestimated in the Appraisal Report. Both factories have been overhauledand are expected to produce a larger output in the next milling season. Aconsiderable volume of project equipment has been ordered, which should bereflected in sizeable project disbursements in the near future.

Credit No. 438-GH - First Highway; US$13 million Credit ofNovember 21. 1973; Closing Date: December 31, 1977

5. This project comprises rehabilitating and improving 13 sectionsof trunk roads totalling some 345 miles; consultants for supervision ofconstruction, pre-investment studies for further road rehabilitation andpreparation of road maintenance project; and the provision of equipmentfor traffic control and pavement surveys. The project became effective inJanuary 1974. Its implementation is underway, delayed only slightly bythe Government's move to establish an independent highway authority whichshould improve the performance of the previous Government road organization.Rehabilitation and other road improvements are expected to start in November1974., the beginning of the next dry season. A maintenance task force isscheduled to conclude its preliminary report in July 1974.

Page 22: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)
Page 23: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

ANNEX II

Page 1 of 5 pages

G H A N A

Accra/Tema Water Supply Project - Second StageCredit and Project Summary

Borrower; The Republic of Ghana.

Amount: US$10.4 million.

Terms: Standard IDA terms.

Relending Terms: The Borrower would onlend US$10.4 million to GWSCat 7-1/4 percent for a term of 25 years, including6 -1/2years of grace.

Project Description: The Project comprises:

A. Components To Be Assisted By IDA

1. Weija Dam - an earth dam, with a maximum heightof about 55 feet, on the Densu River at Weija,about 14 miles west of Accra, to replace thedam destroyed in 1968. The 25,000 mg reservoirformed by the dam wil1 provide a reliable supplyof 70 mgd.

2. Improvement of the existing treatment plant atWeija to increase capacity of 13 mgd.

3. Revenue meters and spares necessary to provide100 percent metering of all new connections.

4. Waste water meters and other equipment necessaryfor a full scale campaigz to reduce leakage.

5. Extension of rural water supplies in an area ofabout 1,000 square miles immediately to the northof the Accra/Tama Metropolitan Area by laying about110 miles of small diameter mains, constructing sixsmall service reservoirs, and other associated works.

6. Extension of existing secondary and tertiarydistribution systems in Accra/Tema.

7. Consulting services for construction supervisionfor the dam and rural water supplies.

Page 24: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

ANNEX III

Page 2 of 5 pages

ProJect Description: 8. Technical assistance in the commissioning ofthe new sewerage system, staff training, designof sewerage extensions, and related items.

9. Training facilities and programs.

B. Coonents To Be Assisted By AfDB

1. Civil works of water treatment plant and servicereservoir.

2. Supply of tranamission mains connecting the rawwater intake, the treatment plant, the servicereservoir and the existing distribution system,together with various connections to existing mains.

3e Ectension of the existing primary distributionsystem in Accra/Tema.

4. Miscellaneous equipment and technical assistance.

C. Components To Be Assisted Ey CIDA

1. Raw Water PUmps to withdraw raw water from thereservoir.

2. Supply of water treatment plant with a capacityof 20 mgd, designed for staged expansion to anultimate capacity of 60 mgd.

3. Construction supervision of all project elementsnot financed by IDA.

Estimated Cost: The estimated total cost of the project, net of importduties and taxes, is about US$44.7 million equivalent,including a foreign exchange component of US$22.4million. Details are as follows:

Page 25: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

ANNIDC III

Page 3 of 5 pages

-------- US$ Thousand ------------Local Foreign Total %

Weija New Works:

Dam 2,8o6 4,896 7,702 17.2Raw water pumps 252 1.129 1,381 3.1Tre-.tment works and service reservoir 2,705 4,280 6,985 15.6Land and resettlement 1,130 1,130 2.5Transmission mains 1,290 1,551 2,841 6.3Distribution system 3,1478 1,826 5,30o4 11.9Water meters and leakage detection

equipment - 232 232 0.5Improvement of Existing Weija Works 70 170 240 0.5

Sub-total (i) 11,731 14,084 25,815 57.6

Rural 'Water Supply 2,911 477 3,388 7.6

Sub-total (ii) 114,6142 14,561 29,203 65.2

Engineering Services and Tr~aining 1,902 2,687 4,589 10.3

Sub-total (iii) 16,544 17,248 33,792 75.5

Contingencies:

Physical 1,349 1,012 2,361 5-3Price 4,,418 14,167 8,585 19.2

T o t a 1 22,311 22,427 414,73B 100.0

Page 26: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

ANMI. III

Page 4 of 5 pages

Financing Plan: The proposed credit of Us$10.4 million would coverabout 23 percent of total project costs and about46 percent of the foreign exchange component.Remairing co;sts would be covered by AfDB and CIDAcontribution=u, GWSC's internal cash generation,and Governmw.t contribution.

US$ Millions

IDA 10.4Af'DB 4.8CmI.A 7.5G-WSC internal cash generation 14.4Government contributions 7.6

T o t a 1 s$4. 7

(US$ million) CumulativeFiscal Year Yearlg Disbursements Disbursements

1975 5.2 5.21976 2.6 7.81977 09 8.71978 1.7 10.4

Procurement Arrangements:

International competitive bidding, in accordance withIDA guidelines, would be used for all procurementcontracts for major project items financed by IDA. Some minoritems would be procured from selected suppliers tomaintain standardization with existing equipment.Procurement under AfDB and CIDA-assisted project cam-ponents would be in accordance with their respectireguidelines.

Consultants: For IDA-finanoad consultants, arrangements would bemade in accordance with procedures acceptable to IDA.

Page 27: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

ANNEX III

Page 5 of 5 pages

Rate of Return: The eccnomic rate of return on incrementalinvestment in the Project, excluding dutiesand taxes, is estimated at 6 percent. However,this estimate does not take into accountpossible irrigation benefits and non-quantifiablehealth benefits.

Appraisal Report: Report No. 425-GH datedMay 31, 1974.

taps: Attached are maps IBRD 3761-R, 3762-R, and 11032.

Page 28: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)
Page 29: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

< 0 L P P E ER V O '|L T At t T> 5^''' CA i iMOUAGTAOF / :6

-11'~~~~~~~~~~~~~~~~~~~ t> I *_:I R I A V

tt U P P E R SE G I ° 0!4 S-v GGIEt IN At\; as .''\48> p~~~~~~~~~~~~~~y \</ 'a2.H X 1~~~~~~~- -.O'

t 1 a -:-< t % ) i!t GHANA-IG- % < vJ / / f~~~~~~~~~~~~~~~~~~~~ICCRA-TEMA WATER SUPPL PROJC

...... --- ~' > sr Y0 9XISTING -PROPOSED PIPED

_~~~~~~~~~~~~~~~~~~.. ........ WATER SUPPLIES

\ 2 4 ~~~~~~~~N 0 R 7 H E k

tS~~~~~~~~~~~~~~~SUS 5

. / AA/O>I XAO -, OIAGO?

9.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~CG

/ COAST @ ( N9

'~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ST /X AMOSOCoL 0{)AC

A ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~A

+ Su< A , r R E G I O N 0 Spi,g!a/~~~~~$SECND TAG I

03~~~~~~~~~~~~~~~~~~~~

fA~~~~~~~~ tvg< :) X "XSv R '-E; +,"0 o'

/ Goffos Ad AN t .I

SU AN ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ A

C'~~~~~~~~~~~~~~~~

* 1 ~ W

Ok SOSOO ssn t n . -. , . t_

_ T FS , d X k > a | ~~~~~~~~~~~~~~~~~~OPEATSSED F9Y ET G PTOE SO 005L

AC5TU OISTTIATTSLSTATA

I ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Il

F R E 0>et NO F92<EJG v¢ AUT-oliTI-

7be h Ml .l ,z hrr, s/1z 1llfg S1luP Wo / v +y o ,;EKONDI ;47r ° 10 10 C 49 G S LAAL5 i %7~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~DIL)A"

lp~~~~~~~~~.. .cqrlel .a z: eLoe_od v, ,; INT-- A IEL -GUIIID-ES _

Page 30: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)
Page 31: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

I1 D 762R| / ~~~~~~~~~~~~~~~~~~~~A PR IL I9 7o 2000 4000 00oo 0000 4000 FEET

.E.IJ W.TER WOR"S PIPELINES

EXISTING OR UNDER CONSTRUCTIDN

*:<e~ - x ____-- PROPOSED

PUMPING STATIONS:

IS .40 lFRANKADUA fi EXISTING OR UNDER CONSTRUCTION

I, * PROPOISE.

KSIOSOMBO -

PROPOSED WEIA ... -. R ESEV/R'

o ~~~~~~~~~~EXISTING SR UNDER CONSTRUCTION"s' ~~~ IJUMPONU 0 ~~PROPOSES)

*0~-... >\ ATIMPOKO JOMPONGTREATMENT WORKS:

.Uc EARTHY9 ROOERESER-OIR MAIN SERVICE PROPOSES

RESERV IR

KPONG WATER WORKS POPULATION DENSITY:

o I 0 ,OOD IN,iIABITANTS1.00 2,000 so NARITANTS

U 2,000 -5,0001NINHA:ITAN'TS

" ~~~~'IU A~.6 5.000 -iSUOS INHARBTANT"

KOPORIDUA A ASUSE S__ ; 10.000 15,000 INHABITANTS

OVER 100,000 INHABITANTS

......... METROPOLITAN AREA LIMITSASUTSUAR6JI' ROADS

I -.APERE-.--,, .,,, RAILWAYS

NOTE: W0te0 dislwibotjon sPyenR de.oil, in

ACCRA-TEMoA no? Aho.-

AF - - -A -WNTA * - ---

WEIJAWAT WT S Y PS S

\ / , t~ ~ ~~~~~~~~~~~~v GHANA/

GENERAL LAYOUT OF PROJECT

ARo ooo 20000 340000 40000, 500 FEET

Page 32: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)
Page 33: P-1469-GH Public Disclosure Authorizeddocuments.worldbank.org/Curated/En/973071468252899293/Pdf/Multi0page.pdfWhile water borne diseases such as dracontiasis (Guinea worn infection)

0° 25' 0° 20'

GHANA Monhia

ACCRA/TEMA WATER SUPPLY PROJECT- SECOND STAGE f

IRRIGATION COMPONENT j OAfuamon(WEIJA IRRIGATION SCHEME) 0 Donchiro

Project Information in Red t E RESERVOIR\ ' - E-----=--' 7 ~~~WEIJA RESERVOIRY

1I -: . - 1Proposed Irrigated Areas 7300 Acres N

Future Reservoir

Rivers

Rood-.-- International Boundaries

0 2 4 6 4Z

KILOMETERS -- - ---

MILES 4 @ O GboweMILES~~~~~ --=----=----===, PROPOSED WEIJA DAM

0 Weija

VOLTA '2o -- ------- ° IRRIGATIO Nf -- ------------ ~~~~~~~~~~~~' OUTLET go Obrlogo

CL i c( \ f <t 7 t > (Gravity) i _ A_

°)io° \ i PUM ING STATION o p4CCr0

gR -X C i \ \~~( FOR IRRIGATION9 EDR'6 G1K~~~~~~~~~~~~~~~~~~~E

0 Tamale / t- u

.i< j 0\: )

0 LAKnc; E 0 <- -2Bto ~ SOkm

~~ I) VOL~~TA \ o

r

LCA OACAB,h o ,..:.::- /GUlFOF...G H A N A

Xj ~ ~ ~~ Boioo B 1 Tiebu0aisshloltlsmpd o PRkuasi . . ... . n 0O 0 MOM 6

W ineb CC RA Bight of F O H N

20 Sekondi io W-1d d0.-k~ 0 OIIII'~0 20'