orkun beydagi ws

14
Individuals AT HOME little effect over the boundary more effect over the boundary with social interaction OUTSIDE body gestures clothes ... digital personal background + building ground level underground three of these conditions defines what kind of activity will be held in the area. They are the physical boundaries that form with human activities and define them. in between - no program for meetings - games - ... public space people come together in city in different patterns, which is changing upon time people always get together for activities - however - as location based social networks arise, the chance of getting together for activities with the people we don’t know yet, becomes an important point city turns into a big scene of unintended activities worldtransformsitself what would be the new typology and (topology) of public space in the time of location based social networks deforming city fabric sections in different states different states checkin data shorter buildings - scattered layout taller buildings - denser population - gathered layout shorter buildings - larger streets - pointed layout two instances of the density of people P 1

Upload: orkunbeydagi

Post on 01-Nov-2014

236 views

Category:

Design


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Orkun Beydagi WS

IndividualsAT HOMElittle e�ect over the boundary more e�ect over the boundary

with social interaction

OUTSIDE

body gesturesclothes...

digital personal background

+

building

ground level

underground

three of these conditions de�nes what kind of activity will be held in the area. They are the physical boundaries that form with human activities and de�ne them.

in between - no programfor meetings - games - ...public space

people come together in city in di�erent patterns, which is changing upon time

people always get together for activities - however - as location based social networks arise, the chance of getting together for activities with the

people we don’t know yet, becomes an important point

city turns into a big scene of unintended activities

worldtransformsitselfwhat would be the new typology and (topology) of public

space in the time of location based social networks

deforming city fabric

sections in di�erent states

di�erent states checkin data

shorter buildings - scattered layout

taller buildings - denser population - gathered layout

shorter buildings - larger streets - pointed layout

two instances of the density of people

P 1

Page 2: Orkun Beydagi WS

possible other designes from di�erent particle clouds

the instantenously created space will stay after the activity has been changed. almost like for a week period space will remain and the other activities will join and make the space grow through those new activities

growing space

Page 3: Orkun Beydagi WS

distributed art institutionthere will be no information storage that we learn about things, but only a constant experience that produces new information each time

i m dealing with interactivity - try to create a new communication method between people through geometries

related to that interactive performance, I shaped this sculpture as a solid form of the di�erent states changed in the transformation

this changing shape on the facade seems interesting

�oor / ceiling interaction is what I intented to show for negotiation of boundary between neighbours

particles invisible visible

particlespolarized

- +- - + +

+

+ - -- -

--

----

-

-+

+

++

++

+

+

+

charge

charge

charge

attractors

attractors

attractors

notr

notr

notr

notrnotr

-

-

-

-

+

+

+

+

+

there are n points

when a user charge a surface in city and particles start to accumulate over that surface

--

-------- --------- ---------- --------

- -

-2+1

-2+1

-2+1

-2+1

the bond are formed between two sets of particles

depending on the distance between particles the radius of the particles

changes and the strength of the bond

bonds

n/2 n/2

1 3 5 7 ---- 2 4 6 8 ----*particle number

P 2

Page 4: Orkun Beydagi WS

polarized

soundsample generation

manipulationtransmission

wind

external sound

receiver

vibration

vibration

bacteriasde�ning pH degree

paintingcolor receiving

gradientcolor fog

Page 5: Orkun Beydagi WS

water - culture institution in meatpackingP 3

Page 6: Orkun Beydagi WS

digital fabrication - exhibition wallP 4

Parameter A: manipulation of the two surfaces

Parameter B: determination of the layers in Z-axis

The parametric exhibition wall, change it’s shape accordingly to the manipulation of two surfaces, in direct relation.

surface A

surface B

Assembly method

Page 7: Orkun Beydagi WS

fibrous structuresP 5

Page 8: Orkun Beydagi WS

P 6life proposal in kadikoy

Page 9: Orkun Beydagi WS

Boğaziçi University Life Sciences BuildingŞANAL architecture - planning

My role is to get involved into the design and developing BIM system for the design process of the Science and Technology Center building.A campus to inspire the scienti�c mind set in the natural ecology of the Bophorus.Context of multi-disciplinary research and innovation for the 21st Century: RASATHANE SCIENCE & TECHNOLOGY CAMPUS is envisioned as a mix of university long-term research and advancement of knowledge application to end-users. This new campus plan in the Üsküdar Rasathane peak unites the ongoing pursuits and goals of BOGAZICI UNIVERSITY and Istanbul Greater Municipality’s aspiration to revitalize the urban cores. The master plan for the 300,000+ m2 campus calls for a multiple phased full build-out of 30,000 m2 of project based research, laboratories, learning areas, communi-cation areas, social life, visitor areas, cultural activities and open space. The plan for BUKK combines an intricate play between urban design, architecture and complex programmatic requirements of specialized advanced research and social-life. The designing a new advanced science center hub along the Bosphorus in Istanbul meant a precise notion for the facilities of a global research hub that could simultaneously work as a dynamic urban design concept and become an inspiring architectural expression.

Page 10: Orkun Beydagi WS

project team:Alexis SanalMurat SanalMerve Akdağ ÖnerOrkun BeydağıHazar Arasan

Page 11: Orkun Beydagi WS

RAP-PAR: augmenting spatiality

The ambient qualities of urban ecologies as we as civilizations create them in speci�c geographic locations are coming to the forefront of cultural production. With the advent of digital media and environmental consciousness more than any other point in human history we are able to access the formal qualities of the ambient environment in terms of the built, social and natural environ-ments. Through sensors, databases and visualization we can collect information on the ambient dynamics of cities, sound, light, air quality, acoustics, human movement, ecological dimensions, social preferences and their multiplicity of interactions. And while social media and global commerce has transcended the con�nes of place, its impact on culture has made place-centric experiences and spatial awareness more important not less.

RAP PAR, a team from Istanbul, Turkey, proposes a sound and light installation, namely Augment-ing Spatiality for Abercrombie Lane. The installation’s premise is to reveal speci�c ambient qualities of Sydney and Istanbul as distinct urban ecologies, but also like a cultural exchange, put their sampled qualities into a dialogue that responds to one another. The dialogue will be framed on a spatial narrative referring to ‘equal’ volumes of spaces to create sequence, compression, gateway, perception and extension in the formal geometry of the space. Abercrombie Lane was speci�cally selected as it is the only site that is common to many of the urban spaces in Istanbul, but also as it does not receive direct sun to the ground which creates a very suitable environment for light installation. RAP PAR is taking Beyoğlu-Karaköy axis as its main spatial center to collect sound, and speci�cally İstiklal Street as the ‘main spine’ (with particular resemblances with the George Street, including current urban transformation urgencies) to form the background sound vocabulary of ‘equal’ volumes that are connected to this main axis. Project Team: Artist-Re�k Anadol, Curator-Pelin Dervis, Architect-Alexis Sanal, Orkun Beydagi, Media Designer-Sebastian Neitsch, Music-Kerim Karaoglu

installation

Page 12: Orkun Beydagi WS

ŞANAL architecture - planning

Şişhane Park

My role is to test the di�cult construction solutions in BIM environment and construction site coordination

Providing over 800+ cars, public gathering for 1,000+, and four open park landscapes for engaging the city.

Where else in Istanbul to have snow gardens, a spring blossom park, sunset decks, a level sloped path to walk, lots of easy to navigate parking, bi-modal transit access, a market place for specialty goods, the outdoor theater of urban life, a public venue for cultural events…then the precipice of the PERA / GALATA / SIŞHANE / TÜNEL districts of BEYOĞLU, Istanbul

Page 13: Orkun Beydagi WS

project team:Alexis SanalMurat SanalBegüm ÖnerOrkun BeydağıCibeles Sanchez

handrail manufacturing detailconcrete construction plan

BIM site diagram

3929

3751

3896

3679

3861

3611

3401

3401

3401

31833236

3316

3401

3876

3720

3495

3329

3461

3790

4000

3980

3800

3830

3960

3411

3890

3925

4050

34613491

3400

3611

3653

3671

3581

4070

39613961

3792

3959

4070

4050

3600

3791

3800

3690

3500

3465

3800

3460

3635

3450

3400

3350

3300

3250

3200

90°

KAYNAKHİZASI

KAYNAKHİZASI

METAL PROFIL

AHSAP KUPESTE

AHSAP KUPESTE

5° MAKSİMUMKATLAMA AÇISI

MİNİMUMKATLAMA AÇISI

DIŞİÇ

GÖRÜNÜŞ

PASLANMAZ ÇELİK DİKME

KÜPEŞTEBAĞLANTIELEMANI

METAL PROFIL

ZEMİN BAĞLANTIELEMANI DETAYI

20°KATLANMAHİZASI

KAYNAKHİZASI

KAYNAKHİZASI

20°KATLANMAHİZASI

KAYNAKHİZASI

KAYNAKHİZASI

AÇILMIŞ GÖRÜNÜŞ

ZEMİN BAĞLANTI ELEMANI DETAYI

BIM stair construction diagram

4900

34.00

34.90

36.10 37.30

34.00

31.60

32.40

34.10

33.00

34.00

34.00

37.0035.80

34.6534.00

33.20

39.00

40.40

40.30

34.50 34.50

34.50

34.50

35.35

36.10

36.10

35.15

34.70

34.45

37.90

38.75

39.35

39.75

39.90

33.40

Hmin=230cm

Hmin=300cm

Hmin=300cm

34.30

34.70

37.00

34.30

34.65 36.35

34.45

35.00

36.80

36.80

39.10

39.50

38.68

38.35

34.00

33.00

29.40

34.00

34.00

35.00

34.00

PEN KONUMU- RAMPA HKOORDİNASYONU

PEN KONUMU- RAMPA HKOORDİNASYONU

82508250

Page 14: Orkun Beydagi WS

SALT research libraryŞANAL architecture - planning