Page 1: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 1

STANDARD COST ROLLUP– A TUTORIAL

Prepared by Oracle Applications Manufacturing BDE

Author: Sanjeev Kale

Creation Date: May 12, 2004

Last Updated: May 24, 2004

Copyright � 2002 Oracle Corporation All Rights Reserved

Page 2: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 2

INTRODUCTION................................................................................................................................................................................... 3 PRACTICE DATA ................................................................................................................................................................................. 4

Items .................................................................................................................................................................................................... 4 Department , Resources and Overheads.............................................................................................................................................. 5 Routings .............................................................................................................................................................................................. 5 Bills of Material .................................................................................................................................................................................. 6

DEFINE ITEMS...................................................................................................................................................................................... 7 COST TYPE.......................................................................................................................................................................................... 10 BASIS TYPE......................................................................................................................................................................................... 11 MATERIAL OVERHEAD ................................................................................................................................................................... 13 PURCHASED ITEMS COST............................................................................................................................................................... 14 DEFINE RESOURCES ........................................................................................................................................................................ 18 OVERHEADS....................................................................................................................................................................................... 20 DEFINE DEPARTMENTS .................................................................................................................................................................. 21 DEFINE ROUTINGS ........................................................................................................................................................................... 26 DEFINE BILL OF MATERIALS (BOM)............................................................................................................................................ 27 ASSEMBLY COST .............................................................................................................................................................................. 29 COST UPDATE.................................................................................................................................................................................... 34 INVENTORY TRANSACTIONS ........................................................................................................................................................ 36 WIP TRANSACTIONS ........................................................................................................................................................................ 38

Page 3: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 3

INTRODUCTION The purpose of the document is to walk you through the set up and understanding of Standard Cost Rollup. I have made certain assumptions while writing this. They are as follows

• You are using 11.5.9 version of Oracle Application. • This data has been tested and works on Vision Database.

This tutorial will also help you understand the following beside the Standard Cost Rollup and Cost update.

• Use of XML in Item Imports • BOM business objects API • Routings API

Page 4: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 4

PRACTICE DATA

Items MASTER ITEMS M1 - ORG ITEMS – COST DETAILS

Item Description Template Type

WIP Supply Type

Build in WIP

Material Cost

Material Overhead Basis

Rate/Amount

xx-MB2XR Xtreme Mountain Bike

Finished Goods

Push Yes

xx-FRAME 6061 Aluminum Frame

Purchased Item

Operation Pull

No 250.00 Total Value

0.05

xx-TIRES Kevlar Tires Purchased Item

Push No 30.00 Total Value

0.05

xx-FORK Front Suspension Fork

Purchased Item

Assembly Pull

No 110.00 Total Value

0.05

xx-BARS Titanium HandleBars

Purchased Item

Push No 40.00 Total Value

0.05

xx-COMP Components Kit Phantom Item

Phantom No

xx-DERAIL Front/Rear Derailleur

Purchased Item

Operation Pull

No 60.00 Total Value

0.05

xx-BRAKES Front/Rear V-brakes

Purchased Item

Operation Pull

No 80.00 Total Value

0.05

xx-SADDLE Padded Gel Seat Purchased Item

Operation Pull

No 45.00 Total Value

0.05

Page 5: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 5

Department , Resources and Overheads Dept Description Resource Resource

DescriptionType Basis UOM Chrg

Type Cst Std

RateRes Unit Cost

Units

xxMFG Manufacturing Department

xxAsmblr Bike Assembler

Person Item HR WIP Move

Y Y 10 8

xxQLTY Quality Department

XxSpec Spec Check Computer

Machine Item HR WIP Move

Y Y 40 8

xxTester Test Rider / Inspector

Person Item HR WIP Move

Y Y 15 8

Overhead Cost

Element Description Absorption

Account Default Basis

xx-BENEFIT Overhead Overhead for Personnel

01-000-1420-0000-000

Resource Value

xx-UTILITY Overhead Overhead for Machine

01-000-1420-0000-000

Resource Value

Routings Routing Description Op

Seq Dept Res.

Seq Resource Usage Standard

Rate Schedule

xx-MB2XR Xtreme Mountain Bike 100 xxMFG 100 xxAsmblr 0.5 Yes Yes 200 xxQLTY 100 xxSpec 0.5 Yes Yes 200 xxTester 1 Yes Yes

Page 6: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 6

Bills of Material Item/Bom Description Item

Seq Op. Seq

Quantity Supply Type

Sub Inventory

Include in Roll up

xx-COMP Components Kit xx-DERAIL Front/Rear Derailleur 10 1 1 Operation

Pull Stores Yes

xx-BRAKES Front/Rear V-brakes 20 1 2 Operation Pull

Stores Yes

xx-SADDLE Padded Gel Seat 30 1 1 Operation Pull

Stores Yes

xx-MB2XR Xtreme Mountain Bike xx-FRAME 6061 Aluminum Frame 10 100 1 Operation

Pull Stores Yes

xx-TIRES Kevlar Tires 20 100 2 Push Stores Yes xx-FORK Front Suspension Fork 30 100 1 Assembly

Pull Stores Yes

xx-BARS Titanium HandleBars 40 100 1 Push Stores Yes xx-COMP Components Kit 50 100 1 Phantom Stores Yes

Page 7: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 7

DEFINE ITEMS

MASTER ITEMS M1 - ORG ITEMS – COST DETAILS

Item Description Template Type

WIP Supply Type

Build in WIP

Material Cost

Material Overhead Basis

Rate/Amount

xx-MB2XR Xtreme Mountain Bike

Finished Goods

Push Yes

xx-FRAME 6061 Aluminum Frame

Purchased Item

Operation Pull

No 250.00 Total Value

0.05

xx-TIRES Kevlar Tires Purchased Item

Push No 30.00 Total Value

0.05

xx-FORK Front Suspension Fork

Purchased Item

Assembly Pull

No 110.00 Total Value

0.05

xx-BARS Titanium HandleBars

Purchased Item

Push No 40.00 Total Value

0.05

xx-COMP Components Kit Phantom Item

Phantom No

xx-DERAIL Front/Rear Derailleur

Purchased Item

Operation Pull

No 60.00 Total Value

0.05

xx-BRAKES Front/Rear V-brakes

Purchased Item

Operation Pull

No 80.00 Total Value

0.05

xx-SADDLE Padded Gel Seat Purchased Item

Operation Pull

No 45.00 Total Value

0.05

1. Open the mfgcst.xml file using the notepad or wordpad and Replace all XX- with your two lettered initials. (in my

case it would be SK)

2. ftp the following files that are available along with this document to the respective directories.

mtiapi.sql to the user home directory.

Page 8: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 8

mfgcst.xml to /usr/tmp directory. (to a directory which is defined by utl_file_dir paramater) 3. Run the following script from the user home directory.

sqlplus appsusername/passowrd @mtiapi.sql You will get the following message Number of records inserted 18

PL/SQL procedure successfully completed. exit Will get you out of the sqlplus session.

4. The Above process would have populated the MTL_SYSTEM_ITEMS_INTERFACE table. 5. Login in the Application can Navigate to Inventory���� Items���� Import ���� Import Items take the default parameters

which are as follows

All Organizations = Yes Validate Items = Yes Process Items = Yes Delete Processed Items = Yes Process Set (Null for all) = Create or Update Items = 1 (Create New Items)

6. Verify Import Items request completes successfully.

7. Naviagate to Inventory ���� Items ���� Master Items click on the flash light and in the Items field in the Find Master Items window enter the following XX-A% XX-Z% and click on find and verify the the items are populated in the V1 and M1 organization with the appropriate item attributes as specified in the above table (Except Cost details which we will later).

Page 9: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 9

You can also verify the results with the following SQL COL DESCRIPTION FORMAT A25 COL SEGMENT1 FORMAT A10 COL MEANING HEADING "WIP_SUPPLY_TPYE" FORMAT A15 SELECT Organization_id ORG, Segment1, MTI.DESCRIPTION, BUILD_IN_WIP_FLAG, MEANING FROM MTL_SYSTEM_ITEMS MTI, MFG_LOOKUPS ML WHERE SEGMENT1 BETWEEN 'SK-A%' AND 'SK-Z%' AND WIP_SUPPLY_TYPE = LOOKUP_CODE AND LOOKUP_TYPE = 'WIP_SUPPLY' ORDER BY 1,2; ORG SEGMENT1 DESCRIPTION B WIP_SUPPLY_TPYE ---------- ---------- ------------------------- - --------------- 204 SK-BARS Titanium Handlebars N Push 204 SK-BRAKES Front-Rear V-Brakes N Operation Pull 204 SK-COMP Components Kit N Phantom 204 SK-DERAIL Front-Rear Derailleurs N Operation Pull 204 SK-FORK Front Suspension Fork N Assembly Pull 204 SK-FRAME 6061 Aluminum Frame N Operation Pull 204 SK-MB2XR Xtreme Mountain Bike Y Push 204 SK-SADDLE Padded Gel Seat N Operation Pull 204 SK-TIRES Kevlar Tires N Push 207 SK-BARS Titanium Handlebars N Push 207 SK-BRAKES Front-Rear V-Brakes N Operation Pull 207 SK-COMP Components Kit N Phantom 207 SK-DERAIL Front-Rear Derailleurs N Operation Pull 207 SK-FORK Front Suspension Fork N Assembly Pull 207 SK-FRAME 6061 Aluminum Frame N Operation Pull 207 SK-MB2XR Xtreme Mountain Bike Y Push 207 SK-SADDLE Padded Gel Seat N Operation Pull 207 SK-TIRES Kevlar Tires N Push

Page 10: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 10

COST TYPE

1. Define the cost type. This will be the cost type where we will collect the costs. (Navigation) Cost ���� Setup ���� Cost Types

Name XX-CSTMTB Description Cost Type for Mountain Bike Accept the form defaults except for the following: Previous Level Rollup Options Enable all of these options with “x”. Make sure that the default cost type is “frozen”.

Save your work Action � Save Close Window.

Page 11: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 11

BASIS TYPE The following table details the basis types available for use with each subelement.

Allocation Charge Methods

SUBELEMENT BASIS TYPE Material Material

Overhead Resource OSP Overhead

Activity X Item X X X X X Lot X X X X X Resource Units X X Resouce Value X X Total Value X

Activity

Use the Activity basis type to assign an acitivity cost to an item. An activity is an action or task that you perform ina business that uses a resouce or incur cost. For material overhead subelements, the cost per item is calculated within each cost type as follows: Cost per item = (Activity occurences / Number of itCost per item = (Activity occurences / Number of itCost per item = (Activity occurences / Number of itCost per item = (Activity occurences / Number of items ) * Activity rateems ) * Activity rateems ) * Activity rateems ) * Activity rate

Item You use the item basis type to assign a fixed cost per item. For material and material ovehead subelements, you define a fixed amount per item For resource, Outside Processing (OSP), and Overhead subelemt, you can define a fixed per item moved through an operation.

Lot You use the lot basis type to assign a lot charge per item or operation. For material and material overhead subelements, the cost per item is calculated within each cost type as follows Cost per item = Rate or aCost per item = Rate or aCost per item = Rate or aCost per item = Rate or amount / Item’s costing lot size.mount / Item’s costing lot size.mount / Item’s costing lot size.mount / Item’s costing lot size.

Page 12: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 12

For resource, Outside Processing, and Overhead subelement, the cost per item is calculated within each cost type as follows Cost per item = Routing usage * Rate or amount * 1 / Item’s costing lot sizeCost per item = Routing usage * Rate or amount * 1 / Item’s costing lot sizeCost per item = Routing usage * Rate or amount * 1 / Item’s costing lot sizeCost per item = Routing usage * Rate or amount * 1 / Item’s costing lot size

Resource Units You use Resource Units basis type to allocate overhead to an item based on the number of resource units. For material overhead and overhead subelements, the cost per item is calculated within each cost type as follows: Cost per item = Overhead rate * No of reCost per item = Overhead rate * No of reCost per item = Overhead rate * No of reCost per item = Overhead rate * No of resource units earned in routing operationsource units earned in routing operationsource units earned in routing operationsource units earned in routing operation

Resource Value You use Resource Value basis type to allocate overhead to an item based on a percentage of the resource value. For material overhead and overhead subelements, the cost per item is calculated within each cost type as follows: Cost per item = Overhead rate * Resource values earned in the routing operationCost per item = Overhead rate * Resource values earned in the routing operationCost per item = Overhead rate * Resource values earned in the routing operationCost per item = Overhead rate * Resource values earned in the routing operation

Total Value You use Total Value basis type to allocate overhead to an item based on a percentage of the total value. For material overhead, the cost per item is calculated within each cost type as follows: Cost per Item = Total cost Cost per Item = Total cost Cost per Item = Total cost Cost per Item = Total cost –––– Material overhead earned at this level * Material overhead rate Material overhead earned at this level * Material overhead rate Material overhead earned at this level * Material overhead rate Material overhead earned at this level * Material overhead rate

Page 13: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 13

MATERIAL OVERHEAD

1. Check to make sure that your sub-element for material is MATERIAL (Navigation) Cost ���� Setup ���� Sub-Elements ���� Material You are checking here to make sure that your sub-element says MATERIAL. Close Window.

2. Now setup sub-element for material overhead. (Navigation) Cost ���� Setup ���� Sub-Elements ���� Overheads

Overhead XX-MTBOH Cost Element Material Overhead Description Material Overhead for Bikes Absoption Account 01-000-1420-0000-000 Default Basis Total Value Default Activity Inactive on

Save your work Action � Save Close Window.

Page 14: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 14

PURCHASED ITEMS COST Now we will define item costs for the purchased Items and the assembled item’s Material Overhead. The buyers have told you the purchased standard costs are as follows

XX-FRAME = $250.00 XX-TIRES = $30.00 XX-FORK = $110.00 XX-BARS = $40.00 XX-DERAIL = $60.00 XX-BRAKES = $80.00 XX-SADDLE = $45.00

1. Enter your Item Costs

(Navigation) Cost ���� Item Costs ���� Item Costs Click on New Item XX-FRAME Cost Type XX-CSTMTB Base on Rollup No (for Purchased items) Click on Costs button Note : Each part must be entered seperately

Page 15: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 15

Cost Element Material Sub-Element MATERIAL Activity Basis Item Rate Amount 250.00 Cost Element Material Overhead Sub-Element XX-MTBOH Activity Basis Total Value Rate Amount 0.05

Save your work Action � Save Close Window. Add a New record Repeat the process for other Purchased Items.

2. Enter Manufacturing Item Cost

Item XX-MB2XR Cost Type XX-CSTMTB Base on Rollup No (for Purchased items)

Save your work Action � Save

Page 16: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 16

Close Window. Add a New record Repeat the process for other Purchased Items.

Verify the costs of your items

XX-FRAME = $262.50 XX-TIRES = $31.50 XX-FORK = $115.50 XX-BARS = $42.00 XX-DERAIL = $63.00 XX-BRAKES = $84.00 XX-SADDLE = $47.25

Page 17: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 17

Page 18: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 18

DEFINE RESOURCES

1. Create resources using the following table Dept Description Resource Resource

DescriptionType Basis UOM Chrg

TypeCst Std

RateRes Unit Cost

Units

xxMFG Manufacturing Department

xxAsmblr Bike Assembler

Person Item HR WIP Move

Y Y 10 8

xxQLTY Quality Department

XxSpec Spec Check Computer

Machine Item HR WIP Move

Y Y 40 8

xxTester Test Rider / Inspector

Person Item HR WIP Move

Y Y 15 8

(Navigation) Bills Of Material ���� Routings ���� Resources

Resource XXAsmblr Description Bike Assembler Type Person UOM HR Charge Type WIP Move Basis Item Costed Yes Standard Yes Absorption Account 01-520-5360-0000-000 Variance Account 01-520-5360-0000-000 Click on the Rates Button Cost Type XX-CSTMTB Resource Unit Cost 10.00 Save your work

Page 19: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 19

Action � Save Add a New record Repeat this for XXSpec and XXTester with the correct Type and Resource Unit cost specified in the above table.

Page 20: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 20

OVERHEADS Enter the overheads that will be recovered by your resources. One of the overheads will be used to absorb any costs associated with payroll costs. The other overhead is used to recover the cost of utilities absorbed by the machines.

1. Setup a sub-element for resource overhead (Navigation) Cost ���� Setup ���� Sub-Elements ���� Overheads

Overhead SK-BENEFIT Cost Element Overhead Description Overhead for Personnel Absorption Account 01-000-1420-0000-000 Default Basis Resource Value Defalut Acitivity Inactive on

Save your work Action � Save Add a New record

Overhead SK-UTILITY Cost Element Overhead Description Overhead for Machine Absorption Account 01-000-1420-0000-000 Default Basis Resource Unit Defalut Acitivity Inactive on

Save your work Action � Save Close Form.

Page 21: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 21

DEFINE DEPARTMENTS 1. Create departments using the following table

Dept Description Resource Resource Description

Type Basis UOM ChrgType

Cst Std Rate

Res Unit Cost

Units

XxMFG Manufacturing Department

xxAsmblr Bike Assembler

Person Item HR WIP Move

Y Y 10 8

XxQLTY Quality Department

XxSpec Spec Check Computer

Machine Item HR WIP Move

Y Y 40 8

xxTester Test Rider / Inspector

Person Item HR WIP Move

Y Y 15 8

(Navigation) Bill of Material ���� Routings ���� Departments

Department XXMfg Description Manufacturing Department Class Click on Resources button Resource XXAsmblr Available 24 Hours Yes (Box checked) Share No Units 8

Save your work Action � Save Close Form.

Click on Rates button Cost Type XX-CSTMTB

Page 22: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 22

Overhead XX-BENEFIT Activity Basis <default> (Resource value) Rate 0.05 Click on the next line below the overhead Overhead XX-UTILITY Activity Basis <default> (Resource Unit) Rate 10

Save your work Action � Save Close Form.

New Record

Department XXQlty Description Quality Department Class

Page 23: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 23

Click on Resources button Resource XXSpec Available 24 Hours Yes (Box checked) Share No Units 8

Click on the next line

Resource XXTester Available 24 Hours Yes (Box checked) Share No Units 8

Save your work Action � Save Close Form.

Click on Rates button Cost Type XX-CSTMTB Overhead XX-BENEFIT Activity Basis <default> (Resource value) Rate 0.05 Click on the next line below the overhead

Page 24: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 24

Overhead XX-UTILITY Activity Basis <default> (Resource Unit) Rate 10

Save your work Action � Save Close Form.

2. Connect the Overheads to the Resources

(Navigation) Bill of Material ���� Routings ���� Resources Click the flashlight on the toolbar. Select your XXAsmblr resource Click the Overheads button

Cost Type XX-CSTMTB Overhead XX-BENEFIT

Save your work Action � Save Close Form.

Page 25: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 25

Click the flashlight on the toolbar. Select your XXSpec resource Click the Overheads button

Cost Type XX-CSTMTB Overhead XX-UTILITY

Save your work Action � Save Close Form. Click the flashlight on the toolbar. Select your XXTester resource Click the Overheads button

Cost Type XX-CSTMTB Overhead XX-BENEFIT

Save your work Action � Save Close Form.

Page 26: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 26

DEFINE ROUTINGS

1. Create a routing for item xx-MB2XR using the following tables

Routing Description Op Seq

Dept Res. Seq

Resource Usage Standard Rate

Schedule

xx-MB2XR Xtreme Mountain Bike 100 xxMFG 100 xxAsmblr 0.5 Yes Yes 200 xxQLTY 100 xxSpec 0.5 Yes Yes 200 xxTester 1 Yes Yes

2 Open the rtglist.txt file using the notepad or wordpad and Replace all XX with your two lettered initials. (in my case

it would be SK) 3 ftp the following files that are available along with this document to the respective directories.

rtgapi.sql to the user home directory. rtglist.txt to /usr/tmp directory. (to a directory which is defined by utl_file_dir paramater)

4 Run the following script from the user home directory. sqlplus appsusername/password @rtgapi.sql You Will get the following message

v_dept_code SKMfg v_OrganizationCode M1 v_ItemName SK-MB2XR v_dept_code SKQlty v_OrganizationCode M1 v_ItemName SK-MB2XR Return Status = S (Return Status S = Successful – Otherwise you will get error message) Message Count = 0 PL/SQL procedure successfully completed.

5 Verify Routings by going to (Navigation) Bill of Material ���� Routings ���� Routings.

Page 27: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 27

DEFINE BILL OF MATERIALS (BOM)

1. Create the Bill of Material using the following table.

Item/Bom Description Item Seq

Op. Seq

Quantity Supply Type

Sub Inventory

Include in Roll up

xx-COMP Components Kit xx-DERAIL Front/Rear Derailleur 10 1 1 Operation

Pull Stores Yes

xx-BRAKES Front/Rear V-brakes 20 1 2 Operation Pull

Stores Yes

xx-SADDLE Padded Gel Seat 30 1 1 Operation Pull

Stores Yes

xx-MB2XR Xtreme Mountain Bike xx-FRAME 6061 Aluminum Frame 10 100 1 Operation

Pull Stores Yes

xx-TIRES Kevlar Tires 20 100 2 Push Stores Yes xx-FORK Front Suspension Fork 30 100 1 Assembly

Pull Stores Yes

xx-BARS Titanium HandleBars 40 100 1 Push Stores Yes xx-COMP Components Kit 50 100 1 Phantom Stores Yes

2 Open the bomlist.txt file using the notepad or wordpad and Replace all XX with your two lettered initials. (in my

case it would be SK) 3 ftp the following files that are available along with this document to the respective directories.

bomapi.sql to the user home directory. bomlist.txt to /usr/tmp directory. (to a directory which is defined by utl_file_dir paramater)

4 Run the following script from the user home directory.

sqlplus appsusername/password @bomapi.sql You Will get the following message

Page 28: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 28

Return Status = S Message Count = 0 Return Status = S Message Count = 0 PL/SQL procedure successfully completed.

1. Verify BOM by going to (Navigation) Bill of Material ���� Bills ���� Bills or Indented Bills

Page 29: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 29

ASSEMBLY COST We have completed the setup and now we want to rollup the costs we have just created for this Bill of Material. Please look at the following table, which will give you a brief understanding as to how the cost roll is calculated. We will verify this with the result we get from the Assembly Cost Rollup program. COST ELEMENTS SUB

ELEMENTS ITEM / RESOURCE BASIS CALCULATION TOTAL

Material Material xxFRAME Item 250 x 1 250.00 xxTIRE Item 30 x 2 60.00 xxFORK Item 110 x 1 110.00 xxBARS Item 40 x 1 40.00 xxDERAIL Item 60 x 2 120.00 xxBRAKE Item 80 x 2 160.00 xxSADDLE Item 45 x 1 45.00 Material OH MTBOH xxFRAME Total Value 5% of 250 12.50 xxTIRE Total Value 5% of 60 3.00 xxFORK Total Value 5% of 110 5.50 xxBARS Total Value 5% of 40 2.00 xxDERAIL Total Value 5% of 120 6.00 xxBRAKE Total Value 5% of 160 8.00 xxSADDLE Total Value 5% of 45 2.25 Resource Asmblr Item .5 hr x $10 5.00 Spec Item .5 hr x $40 20.00 Tester Item 1 hr x $15 15.00 OverHead Benefit Asmblr Resource Value 5% of $5 0.25 Utility Spec Resource Unit $10 x .5 hr 5.00 Benefit Spec Resource Value 5% of $ 15 0.75 TOTAL UNIT COST (Do the cost rollup and compare to this) 870.25

Page 30: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 30

1. (Navigation) ���� Cost ���� Item Costs ���� Assembly Cost Rollup Request Name Cost Rollup – Print Report Cost Type XX-CSTMTB Rollup Option Full Cost Rollup Range Specific Item Report Type Detail Indented Material Detail Yes Material Overhead Detail Yes Routing Detail Yes Report Number of Level 10 Effectivity Date Today’s Date Include Unimplemented ECOs No Alternate Bill Alternate Routing Engineering Bills No Specific Item XX-MB2XR Let the report complete and the report will look as follows

Page 31: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 31

Seattle Manufacturing Report Date: 13-MAY-2004 13:00 Bills of Material Indented Cost Report Page: 1 Cost Type: SK-CSTMTB (USD) Revision Date: 2004/05/13 23:5 Alternate BOM: Alternate Routing: Assembly: SK-MB2XR Xtreme Mountain Bike Category: NEW.MISC UOM: Ea Include in Rollup | Based on Rollup | | Asset/Costed Op Item/ Description/ Last Make | | | Yield/ Quantity/ Shrink/ Extended Qty/ Item Unit Cost/ Level Seq Cost Element Sub-Elem Department Rev Buy | | | Phtm Basis UOM Rate or Amount Basis Factor Rate or Amount Res Unit Cost Extended Cost ----------- ---- --------------- -------------- ---------- ---- ---- ---- ---- ---- ---- ---------- --- -------------- ------------ -------------- ---------------- --------------- 0 SK-MB2XR Xtreme Mountain Bike A Make Yes Yes No Ea 1.00 0.00 1.00 870.25000 100 Resource SKAsmblr SKMfg Yes Item+ HR 0.50 1.00 0.50 10.00000 5.00000 100 Overhead SK-BENEFIT SKMfg Res value USD 0.05 5.00 0.05 0.25000 200 Resource SKSpec SKQlty Yes Item+ HR 0.50 1.00 0.50 40.00000 20.00000 200 Overhead SK-UTILITY SKQlty Res units USD 10.00 0.50 10.00 5.00000 200 Resource SKTester SKQlty Yes Item+ HR 1.00 1.00 1.00 15.00000 15.00000 200 Overhead SK-BENEFIT SKQlty Res value USD 0.05 15.00 0.05 0.75000 .1 100 SK-FRAME 6061 Aluminum Frame A Buy Yes No Yes No 1.00 Ea 1.00 0.00 1.00 262.50000 Material MATERIAL Item+ USD 250.00 1.00 250.00 250.00000 Material Over SK-MTBOH Ttl value USD 0.05 250.00 0.05 12.50000 .1 100 SK-TIRES Kevlar Tires A Buy Yes No Yes No 1.00 Ea 2.00 0.00 2.00 31.50000 Material MATERIAL Item+ USD 30.00 1.00 60.00 60.00000 Material Over SK-MTBOH Ttl value USD 0.05 60.00 0.05 3.00000 .1 100 SK-FORK Front Suspension Fork A Buy Yes No Yes No 1.00 Ea 1.00 0.00 1.00 115.50000 Material MATERIAL Item+ USD 110.00 1.00 110.00 110.00000 Material Over SK-MTBOH Ttl value USD 0.05 110.00 0.05 5.50000 .1 100 SK-BARS Titanium Handlebars A Buy Yes No Yes No 1.00 Ea 1.00 0.00 1.00 42.00000 Material MATERIAL Item+ USD 40.00 1.00 40.00 40.00000 Material Over SK-MTBOH Ttl value USD 0.05 40.00 0.05 2.00000 .1 100 SK-COMP Components Kit A Make Yes Yes Yes Yes 1.00 Ea 1.00 0.00 1.00 341.25000 ..2 1 SK-DERAIL Front-Rear Derailleurs A Buy Yes No Yes No 1.00 Ea 2.00 0.00 2.00 63.00000 Material MATERIAL Item+ USD 60.00 1.00 120.00 120.00000 Material Over SK-MTBOH Ttl value USD 0.05 120.00 0.05 6.00000 ..2 1 SK-BRAKES Front-Rear V-Brakes A Buy Yes No Yes No 1.00 Ea 2.00 0.00 2.00 84.00000 Material MATERIAL Item+ USD 80.00 1.00 160.00 160.00000 Material Over SK-MTBOH Ttl value USD 0.05 160.00 0.05 8.00000 ..2 1 SK-SADDLE Padded Gel Seat A Buy Yes No Yes No 1.00 Ea 1.00 0.00 1.00 47.25000 Material MATERIAL Item+ USD 45.00 1.00 45.00 45.00000 Material Over SK-MTBOH Ttl value USD 0.05 45.00 0.05 2.25000 --------------- 870.25000 ===============

Page 32: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 32

Cost Element Standard Cost Report Value Difference Percent -------------------- ---------------- ---------------- ---------------- ---------- Material 0.00000 785.00000 -785.00000 0.0 Material Overhead 0.00000 39.25000 -39.25000 0.0 Resource 0.00000 40.00000 -40.00000 0.0 Outside Processing 0.00000 0.00000 0.00000 0.0 Overhead 0.00000 6.00000 -6.00000 0.0 ---------------- ---------------- ---------------- ---------- Total 0.00000 870.25000 -870.25000 ================ ================ ================

Page 33: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 33

2. To view the cost (Navigation) ���� Cost ���� Item Costs Item XX-MB2XR Cost Type XX-CSTMTB Click on the Find button

Page 34: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 34

COST UPDATE 1. First let’s examine the Frozen costs.

(Navigation) ���� Cost ���� Item Costs Item XX-MB2XR Cost Type Frozen Click on the Find button Click on the Costs button – In this case there should not be any costs. This is what we will be updating with the cost update.

2. (Navigation) � Cost � Item Costs � Standard Cost Update � Update Costs Request Name Update Standard Costs Cost Type XX-CSTMTB Adjustment Account Std Cost Var (Account alias) Description Update MB2XR Costs Item Range All Items Sort Option <accept default> Update Option Overhead, Resource, Activity, and Item Costs Specific Item tab through (Click Ok) Save Details Yes

3. Verify the Frozen Costs

Page 35: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 35

(Navigation) ���� Cost ���� Item Costs Item XX-MB2XR Cost Type Frozen Click on the Find button Click on the Costs button – In this case there should not be any costs. This is what we are updating with the cost update.

Page 36: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 36

INVENTORY TRANSACTIONS 1. Perform the following miscellaneous transactions

(Navigation) ���� Inventory ���� Transactions ���� Miscellaneous Transactions Date Today’s Date Type Miscellaneous Receipts Source Account 01-000-1110-0000-000 Click the Transaction Lines button

Item Sub Inventory Quantity XX-FRAME Stores 1000 XX-TIRES Stores 1000 XX-FORK Stores 1000 XX-BARS Stores 1000 XX-DERAIL Stores 500 XX-BRAKES Stores 1000 XX-SADDLE Stores 100

Save your work Action � Save

2. Now look up some of the Items in the inventory to make sure that the transaction was processed. (Navigation) ���� Inventory ���� On Hand Availability ���� On Hand Quantity Item XX-TIRES Click the Find button and view the On-hand balances for the tires.

Page 37: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 37

3. View the Material Transaction generated. (Navigation) ���� Inventory ���� Material Transactions Item XX-TIRES Click the Find button and review the Information, Click on the Distribution button. Review the Distribution Information.

Page 38: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 38

WIP TRANSACTIONS 1. Create Job

(Navigation) ���� WIP ���� Discrete ���� Discrete Jobs Job XX-JOB1 Type Standard Assembly XX-MB2XR Description <default> UOM <default> Class Discrete Status Released Quantity 100 MRP Qty <default> Start Date Completion Date 4 weeks from today @ 23:55 Click in the Routing alternative region Completion Sub inventory FGI Save your work Action � Save

2. Review the discrete job for your assembly (Navigation) ���� WIP ���� Discrete ���� Discrete Jobs Job XX-JOB1 Click on the Find button. Click on the Open button.

Page 39: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 39

Review the Job requirements, Operations, resources.

Page 40: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 40

Page 41: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 41

Page 42: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 42

Page 43: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 43

3. Issue the Push Material to the Job

(Navigation) ���� WIP ���� Material Transactions ���� WIP Material Transactions Job XX-JOB1 Click on the Transact button. The push components should appear. Verify the quantities and click on the Done button. The Components should now be issued. Verify that the issues took place by going to View Discrete Jobs forms. In the View Discrete Jobs form, query up the XX-JOB1 and then click on Components button, select the Quantities alternative region.

4. Complete the following Move transaction, Move half of the assemblies from the Queue step of the 1st Operation to the Run step of 1st operation. This also lets the people know the job has started. (Navigation) ���� WIP ���� Move Transactions ���� Move Transactions Job XX-JOB1 Transaction Type Move Seq From 100 Step Queue Seq To 200 Step Run Quantity 100 Click on the Save button. Verify the Move transactions took place by going to View Discrete Jobs forms. In the View Discrete Jobs form, query up the XX-JOB1 and then click on Operations button, select the Quantities alternative region.

5. Complete the assemblies using the easy completion. (Navigation) ���� WIP ���� Move Transactions ���� Move Transactions Job XX-JOB1

Page 44: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 44

Transaction Type Complete Seq From 100 Step Run Seq To 200 Step To Move Quantity 100 Click on Save button. Verify the completions in Inventory by going to (Navigation) ���� Inventory ���� On-Hand, Availability ���� On-Hand Quantity. Query the item XX-MB2XR.

6. Now that 100 quantity of XX-MB2XR’s are complete, close the job so any excess charges can be booked to the variance. Close the Job. (Navigation) ���� WIP ���� Discrete ���� Close Discrete Jobs ���� Close Discrete Jobs (Form) Job XX-JOB1 Click on the Find button. Tools ���� Close 1 click OK. A Close Discrete Jobs request will be submitted. Once the Request is complete, look at the Discrete Job Value Report (summary). It looks likes as follows.

Page 45: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 45

Seattle Manufacturing Report Date: 14-MAY-2004 00:06 Discrete Job Value Report Page: 1 of 1 Summary (USD) Sort by: Job Job: SK-JOB1 Job Desc: Job Type: Standard Status: Closed Assembly: SK-MB2XR Revision: A 09-JUN-04 UOM: Ea Accounting Class: Discrete Start Quantity: 100.00 Start Date: 28-MAY-04 Class Type: Standard Discrete Quantity Completed: 100.00 Date Released: 13-MAY-04 Class Description: Discrete Job Class Quantity Scrapped: 0.00 Scheduled Completion Date: 10-JUN-04 Project: Project Name: Date Closed: 14-MAY-04 Period-To-Date Summary ---------------------- Elemental Single Level Variances Variances Element/Variance Accounts Costs Incurred Costs Relieved Relieved Relieved Period Activity --------------------- ------------------------- ---------------- ---------------- ---------------- ---------------- ---------------- Material 01-000-1410-0000-000 78,500.00 78,500.00 0.00 0.00 Material Overhead 01-000-1420-0000-000 3,925.00 3,925.00 0.00 0.00 Resource 01-000-1440-0000-000 4,000.00 4,000.00 0.00 0.00 Outside Processing 01-000-1450-0000-000 0.00 0.00 0.00 0.00 Overhead 01-000-1430-0000-000 600.00 600.00 0.00 0.00 Material Variance 01-520-5310-0000-000 0.00 Resource Variance 01-520-5312-0000-000 0.00 Outside Process Var 01-520-5370-0000-000 0.00 Overhead Variance 01-520-5330-0000-000 0.00 ---------------- ---------------- ---------------- ---------------- ---------------- Total Costs: 87,025.00 87,025.00 0.00 0.00 0.00 ================ ================ ================ ================ ================ Cumulative-To-Date Summary -------------------------- Elemental Single Level Variances Variances Element/Variance Accounts Costs Incurred Costs Relieved Relieved Relieved Period Activity --------------------- ------------------------- ---------------- ---------------- ---------------- ---------------- ---------------- Material 01-000-1410-0000-000 78,500.00 78,500.00 0.00 0.00 Material Overhead 01-000-1420-0000-000 3,925.00 3,925.00 0.00 0.00 Resource 01-000-1440-0000-000 4,000.00 4,000.00 0.00 0.00 Outside Processing 01-000-1450-0000-000 0.00 0.00 0.00 0.00 Overhead 01-000-1430-0000-000 600.00 600.00 0.00 0.00 Material Variance 01-520-5310-0000-000 0.00 Resource Variance 01-520-5312-0000-000 0.00 Outside Process Var 01-520-5370-0000-000 0.00 Overhead Variance 01-520-5330-0000-000 0.00 ---------------- ---------------- ---------------- ---------------- ---------------- Total Costs: 87,025.00 87,025.00 0.00 0.00 0.00 ================ ================ ================ ================ ================

Page 46: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 46

Review the data in the following forms as well. • View Discrete Jobs forms (look at the resources and material requirements). • (Navigation) ���� WIP ���� Discrete ���� WIP Value Summary (look at the value and account distribution).

Costs Incurred: Costs associated with material issues/returns, resource and overhead transactions of a job or repetitive schedule. Costs Relieved: Standard costs relieved by cost element when assemblies from a job or repetitive schedule are completed or scrapped. Variances Relieved: Variances relieved by cost elements when a job or accounting period is closed, or when a repetitive schedule is cancelled. Net Actitvity: Cost element net activity, the difference between the costs incurred and the costs and variances relieved.

Page 47: Oracle standard rollup

Oracle Cost Management R11i (Release 11.5.9)

Page 47

This Level/Previous Level Elemental Costs: Elemental costs for manufactured items are kept at two levels: this level and previous level.

This level costs are those costs incurred in producing the part at the current bill of material level. This level costs might include labor and overhead supplied to bring an assembly to a certain state of completion. Previous level costs are those incurred at lower levels. Previous level costs might include material and labor, and outside processing costs incurred to bring an item to its current state of completion. Totals costs for an item are calculated by summing the this level and previous level costs as shown in the following table.