open day jic: sme instrument, jordi cusidó roura

11
Winning on Impact: how to make your business case

Upload: jic

Post on 25-Jul-2015

67 views

Category:

Business


0 download

TRANSCRIPT

Winning on Impact: how to make your business case

PhD in Engineering ‘08 UPC

Design Thinking Executive ’12 STANFORD

Ignite Program Postgraduate ‘11 STANFORD

European Patent Law ‘11 CEIPI

Engineering Degree ‘05 UPC

CEO and Co-Founder of SMARTIVE, HealthApp, Ignite & Garage Lab.

European Expert Evaluator for the SME Program

10 years of academic experience at UPC, UVic, EADA

UPC, Best Thesis Award 2010

VALORTEC Award 2011 (Best Business Plan for Start-Up)

Jordi Cusidó Roura

Who am I?1

The SME Program

The Examiner Role

Treat Proposals as an investor.

10 pages are considered as elevator pitch.

• Is there any user need?

• Which will be the impact?

• Which is the actual market opportunity?

• Who are the competitors?

• Which are the barriers of entrance?

• Is there any competitive advantage?

• Who are the early adopters?

Defining Business Opportunity

Useful tools

Provide Clear Information

TSI

Tecnitest

Tecnology

Market

TECNATOM

Use Figures

Forecaste, Price

Turbines

Price SaaS (Euros/month/turbine)

Income Statement Account

Sales Saas

Cost of sales

Assets

Expenses

Personal cost

Project Cost (I+D)

EBIT

PERSONNEL

2015 2016 2017 2018 2019

200 1.056 2.000,0 3.500 4.500

200 € 200 € 200 € 200 € 200 €

480.000 € 2.534.400 € 4.800.000 € 8.400.000 € 10.800.000 €

-48.000 € -253.440 € -480.000 € -2.103.000 € -2.321.000 €

-11.369 € -31.369 € -73.700 € -73.700 € -73.700 €

-159.600 € -915.400 € -2.096.200 € -2.341.460 € -2.575.606 €

-240.309 € -391.888 € -1.073.984 € -1.989.824 € -2.280.324 €

20.722 € 942.303 € 1.076.116 € 1.892.016 € 3.549.370 €

6 10 20 40 50

Reduce wind turbine maintenance cost by 20%: €44 million annually in the Spanishmarket, €190 million per year in Europe and €440 million annually in the world market.

Reduce wind turbine operation cost and component replacement of cost by 20%: astandard park of 50 MW (16 turbines) installation power working 2,100 hours per yearfaces production losses of at least €378,000 annually. Our system enables 20% savings of€75,600 (€4,725 per turbine).

• Unclear or unrealistic statements

“It is expected that the humanity increases the interest to explore the space”

• Non detailed information

“the market is big and grows exponentially”

• Just focus on the Technology or Science behind

Things to avoid

• Treat the proposal as it was for an investor

• Stay focused to provide market evidence

• Use clear figures

• Graphical examples are welcome

• Draft clearly your initial strategy

Recomendations

Jordi Cusidó CEO

Almeria 40, F. 08226. Terrassa

Ignite Technologies

+34 620 602 495

[email protected]

Contact

2

Jordi Cusidó – CEOAlmeria 40, F. 08226. Terrassa

Ignite Technologies

+34 620 602 495

[email protected]