Decommissioning Capability & Experience

Upload: worleyparsons

Post on 24-Mar-2016

287 views

Category:

Documents


5 download

DESCRIPTION

WorleyParsons is a global leader in decommissioning, serving key offshoreand onshore energy, resource and complex industries worldwide.

TRANSCRIPT

Page 1: Offshore Decommissioning

Decommissioning Capability & Experience 1

DecommissioningCapability & Experience

Page 2: Offshore Decommissioning

WorleyParsons2

WorleyParsons is a global leader in decommissioning, serving key offshore and onshore energy, resource and complex industries worldwide.

WorleyParsons responds to industry challenges in the emerging decommissioning market:

• Cost efficiency and geographical differentiation

• Equipment availability

• Peer analysis

• Training & retention

Local delivery, global support 40,400 people | 165 offices | 41 countries

Local Office

Global Hub

BlackfaldsSaskatoonLloydminster

EdmontonFort St Johns Cold LakeFort McMurray

KitimatGrande Prairie

St. John's

Philadelphia

Iselin

Oak RidgeChattanooga

Reading

BayportHouston

Dallas

Tulsa

ShenyangBeijingTianjin

NanjingShanghai

Ulaanbaatar

Bintulu

Kota Kinabalu

Miri

Darwin

PerthBunbury Adelaide

FootscrayGeelong

Bell BayMelbourne

WollongongSydneyNewcastle

MalaccaKuantanKerteh

Kuala Lumpur

Chengdu

Lian Yungang

Hong Kong

Namibia Windhoek

KimberleyDurban

PretoriaSecunda

Port Elizabeth

Bloemfontein

Cape Town

Gladstone

AucklandNew Plymouth

MackayTownsville

BrisbaneSingleton

Blenheim

Shenzhen

Indonesia Balikpapan

Indonesia JakartaEast Timor Dili

Iraq BasrahKuwait Ahmadi

Bahrain Manama UAE Dubai

Oman Muscat

Egypt CairoSaudi Arabia Al Khobar

Saudi Arabia YanbuQatar Doha Oman Sohar

India MumbaiIndia Hyderabad

UAE Abu Dhabi

Bulgaria Stara ZagoraBulgaria Sofia

Brazil Belo Horizonte

Brazil Brasilia

Brazil Rio de Janeiro

Colombia Bogota

Port of Spain Trinidad

Peru Lima

Brazil Sao Paulo

Argentina Buenos Aires

Chile Santiago

Gloucester

Las VegasDenver

Idaho FallsBillings Bismarck

Calgary

Fountain ValleyMonrovia

PhoenixArcadia

Sacramento

Richland

VictoriaBurnaby

Vancouver, WA

Ghana Accra Nigeria Lagos

Angola Luanda

Hawkes BayWellington

Christchurch

United Kingdom

Canada

United States Anchorage

United States

Kazakhstan Astana

Kazakhstan AtyrauKazakhstan Almaty

Russia Moscow

Spain Madrid

Leeds

Bristol WokingLondon

Netherlands DelftCzech Republic Plzen

ManchesterTeesside

TivertonMississauga

Sudbury

Sarnia

Nanticoke

Markham

Chicago

China

Malaysia

Thailand Bangkok

Vietnam Ho Chi Minh City

Vietnam Hanoi

Brunei Kuala Belait

Singapore

South Africa

Australia

New Zealand

Kunming

KazakhstanTengiz UzbekistanTashkent

Aberdeen

Chile Los Andes

Chile Rancagua

Boston

Canberra

Kazakhstan Aksai

Concord

Thailand Sriracha

Page 3: Offshore Decommissioning

Decommissioning Capability & Experience 3

Local Office

Global Hub

BlackfaldsSaskatoonLloydminster

EdmontonFort St Johns Cold LakeFort McMurray

KitimatGrande Prairie

St. John's

Philadelphia

Iselin

Oak RidgeChattanooga

Reading

BayportHouston

Dallas

Tulsa

ShenyangBeijingTianjin

NanjingShanghai

Ulaanbaatar

Bintulu

Kota Kinabalu

Miri

Darwin

PerthBunbury Adelaide

FootscrayGeelong

Bell BayMelbourne

WollongongSydneyNewcastle

MalaccaKuantanKerteh

Kuala Lumpur

Chengdu

Lian Yungang

Hong Kong

Namibia Windhoek

KimberleyDurban

PretoriaSecunda

Port Elizabeth

Bloemfontein

Cape Town

Gladstone

AucklandNew Plymouth

MackayTownsville

BrisbaneSingleton

Blenheim

Shenzhen

Indonesia Balikpapan

Indonesia JakartaEast Timor Dili

Iraq BasrahKuwait Ahmadi

Bahrain Manama UAE Dubai

Oman Muscat

Egypt CairoSaudi Arabia Al Khobar

Saudi Arabia YanbuQatar Doha Oman Sohar

India MumbaiIndia Hyderabad

UAE Abu Dhabi

Bulgaria Stara ZagoraBulgaria Sofia

Brazil Belo Horizonte

Brazil Brasilia

Brazil Rio de Janeiro

Colombia Bogota

Port of Spain Trinidad

Peru Lima

Brazil Sao Paulo

Argentina Buenos Aires

Chile Santiago

Gloucester

Las VegasDenver

Idaho FallsBillings Bismarck

Calgary

Fountain ValleyMonrovia

PhoenixArcadia

Sacramento

Richland

VictoriaBurnaby

Vancouver, WA

Ghana Accra Nigeria Lagos

Angola Luanda

Hawkes BayWellington

Christchurch

United Kingdom

Canada

United States Anchorage

United States

Kazakhstan Astana

Kazakhstan AtyrauKazakhstan Almaty

Russia Moscow

Spain Madrid

Leeds

Bristol WokingLondon

Netherlands DelftCzech Republic Plzen

ManchesterTeesside

TivertonMississauga

Sudbury

Sarnia

Nanticoke

Markham

Chicago

China

Malaysia

Thailand Bangkok

Vietnam Ho Chi Minh City

Vietnam Hanoi

Brunei Kuala Belait

Singapore

South Africa

Australia

New Zealand

Kunming

KazakhstanTengiz UzbekistanTashkent

Aberdeen

Chile Los Andes

Chile Rancagua

Boston

Canberra

Kazakhstan Aksai

Concord

Thailand Sriracha

Decision Management

• Decommissioning studies

• Strategy identification & development

• Technical and non-technical risk

• Comparative economic assessment

Project and Engineering

• Project prioritization

• Late field life & abandonment

• Stakeholder interface

• Infrastructure maintenance

Health, Safety and Environment

• Ongoing liabilities

• Remediation strategies

• Restoration techniques

• Waste management

• Environmental research

Our decommissioning expertise

Page 4: Offshore Decommissioning

WorleyParsons4

Complexities of Decommissioning

Module, Process and Utilities Separation

•Safety critical element performance

•Waste management

Engineering Down•Decision support packages•Risk registers•Cleaning •Decommissioning pipelines•De-energizing topsides and

seabed facilities•Spares optimization

Late Life FieldOperations

•Maintenance strategy•Decommissioning

methodology•Cost estimate•Electrical power

distribution•Utilities engineering

Continuing Liability

•Close out documentation•Monitoring program

Disposal

•Load in analysis•Hazardous waste control•Disposal routes

Removal

•Commercial and contracts •Lift and sea fastening

design•Cutting methodology•Planning

Project Management

•Project engineering •Project services•Quality assurance•Safety Management

Systems•Operations support

FEED

•Decommissioning methodology

•Cost estimates•Economic analysis•Quality assurance

Page 5: Offshore Decommissioning

Decommissioning Capability & Experience 5

WorleyParsons understands the complexity of the challenges in decommissioning planning, engineering and execution and responds with cutting-edge technology and cost-effective solutions to meet your needs.

Strategy for re-use of facilities post CoP

Re-engineer existing utilities, process plant and structure

Reduction in modification costs circa US$7.6million (GBP£5M)

Challenge

Solution

Benefit

Minimize decommissioning duration post cessation of production

Decommissioning program with a phased approach

Saving of up to two years in duration of project

Selection of decommissioning methodology

Economic, environmental and cost benefit modeling

Fully evaluated selection with auditable conclusions

Our delivery

value to customer

WorleyParsons’ response

Page 6: Offshore Decommissioning

WorleyParsons6

Strong performanceWorleyParsons has leading decommissioning experience across the world. Our network of over 40,000 professionals delivers global support tailored to our customers’ specific requirements.

WorleyParsons has been providing Apache Energy with award-winning innovative design and engineering solutions for its marginal fields. As part of our Engineering Services Alliance, WorleyParsons annually puts together methodology and a cost estimate for decommissioning 22 offshore assets. The cost estimate also includes decommissioning work for associated pipelines and onshore facilities.

CUStOMER APACHE EnERgy AUStRALiA LOCAtiOn AUStRALiAPHASE

Field Abandonment Study

Page 7: Offshore Decommissioning

Decommissioning Capability & Experience 7

Decommissioning FPSOCUStOMER: COnFiDEntiAL LOCAtiOn: WESt AFRiCA

A decommissioning plan, cost estimate and schedule for an offshore oil platform, removal of remote subsea wells, pipelines and FPSO in deepwater West Africa was developed. The work included a cleaning plan to remove hazardous waste from the facilities and FPSO and the engineering and operations support for decommissioning and demobilization of the FPSO and subsea equipment. WorleyParsons provided engineering and analysis to support the disconnection of the risers, umbilicals and mooring legs from the FPSO during the planning and execution stages. WorleyParsons executed the marine consultancy and offshore operations supervision during the disconnection and demobilization operations offshore.

Key Asset Abandonment StudyCUStOMER: COnFiDEntiAL LOCAtiOn: COnFiDEntiAL

WorleyParsons performed a decommissioning and abandonment plan of offshore assets. The study consisted of a detailed cost estimate that evaluated the removal options, regulatory framework and degrodation issues associated with decommissioning (abandonment and removal) of 3 separate installations. Assets included 13 subsea wells and 6 platform wells, Production Platform, pipelines (10”, 9”, and 12”), umbilicals, manifolds, and an onshore gas processing plant.

Frigg Sealines AbandonmentCUStOMER: tOtAL UKLOCAtiOn: nORtH SEA

As part of the offshore abandonment scope, all sealines within the platform safety zones needed to be removed or otherwise made safe for other users of the sea. Associated rock berms were to be removed or leveled. Final seabed configuration must have been acceptable for interaction with fishing equipment.

INTECSEA’s scope included assessment of pipeline rockberm overtrawlability, risk assessment for abandoned pipeline, pipeline recovery analysis, market survey of rock spreading tools and capability, and recommendations of spreading scope and method.

Page 8: Offshore Decommissioning

Corporate overview

Zero Harm is our corporate vision for health, safety and the environment (HSE).

We are committed to our vision and apply it to all operations, at all times, in all locations, and at all levels of responsibility. We will actively work to align our expectations and behaviors to achieve Zero Harm in our dedication to continuous improvement. These expectations are reflected in our integrity management framework, OneWay™, and linked to our global systems and procedures.

WorleyParsons is a leading global provider of professional services to the resources and energy sectors, and the complex process industries.

We cover the full asset spectrum, both in sise and lifecycle, from the creation of new assets, to services that sustain and improve operating assets.

Our business has been built by working closely with our customers through long-term relationships, anticipating their needs, and delivering inventive solutions through streamlined, proprietary project delivery systems. Strong growth continues to characterize our performance both through organic development and through strategic acquisition as we strive to provide tailored services wherever our customers need us.

EcoNomics™ provides our customers with the systems, technologies and expertise to optimize and balance financial, social, and environmental outcomes, improving sustainability performance while enhancing profit and long-term viability.

WorleyParsons’ vision is to be a leader in sustainability by helping our customers capture new markets and business opportunities created by the new energy economy.

HyDROCARBOnS

POWER

MinERALS, MEtALS & CHEMiCALS

inFRAStRUCtURE & EnViROnMEnt

Page 9: Offshore Decommissioning

Decommissioning Capability & Experience 9

WorleyParsons is fully committed to creating inherently safer workplaces and sustainability in operations - our vision is zero harm to people, assets and the environment. In these regards we aim to be an industry leader.

We have successfully delivered numerous projects and over 2.9 million man-hours of work in 2012, with a Lost Time Injury Frequency (LTIF) of 0.03 and a Total Recordable Injury Frequency (TCRF) of 0.24 (both rates per 200,000 hours).

Focus on occupational health and safety

• Use of leading KPIs e.g. board and executive committee structured HSE site visit program

• Road safety program

• Serious About Zero - behavioral change program

• Optimizing our approach to safety in construction and contractor management

• OneWayTM moments to start each meeting

Focus on process safety

• SEAL - WorleyParsons’ engineering delivery model (Safe & Sustainable Engineering for Asset Lifecycle)

• Hosting major accident hazards technology workshop with the Society of Petroleum Engineers

Focus on the environment

• Environmental risk assessment and management tool

• Annual input to the Carbon Disclosure Program which requires measurement of our environmental impacts.

We recognize success with inititives such as annual Regional Managing Director Europe HSE awards with prizes for team, individual and contractor teams.

For the customer engineering and procurement phase, WorleyParsons will:

• Hold an HSE alignment and planning workshop with customer, WorleyParsons and all contractors

• Identify all potential project HSE risks and hazards

For the customer construction phase, WorleyParsons will implement all elements of the OneWay™ framework to drive safety culture, actions and risk mitigation to achieve our zero harm goals.

Our HSE commitment

Page 10: Offshore Decommissioning

WorleyParsons10

Leading the way

WorleyParsons has a long history of successfully delivering world scale projects in some of the harshest corners of the planet.

Our innovative and cutting–edge solutions are specifically tailored to customers’ needs. We provide an integrated network of expertise from all industries to deliver global best practices. Our decommissioning services improve safety and reduce costs, through strategy selection, methodology screening and economic evaluation.

WorleyParsons is excited to respond to the challenges of our customers’ decommissioning projects. We are confident that we add the most value because:

• we align with customers’ expectations

• our maintenance programs are designed to suit platforms after cessation of production

• we provide early identification of risks and issues

• we develop an integrated team culture

• we provide competitive and consistent pricing, coupled with confidence in our technical and management capabilities

• our expertise is second to none and allows us to assess and execute all aspects

• our proven Workshare methodologies realize the benefits of multi-office execution, delivering the strongest team, best experience and most value to your project

Page 11: Offshore Decommissioning

Our differentiators

Differentiator 3

Economics™ – delivering profitable sustainability

Differentiator 7

Comprehensive geographic

presence

Differentiator 1

Combined empowerment and technically capable people

Differentiator 2

industry leadership in health, safety and environmental performance

Differentiator 4

Outstanding operational and

corporate performance

Differentiator 5

Focus on long term contracts and asset-based

services

Differentiator 6

Success in project delivery

- large and small

Page 12: Offshore Decommissioning

WorleyParsons12

Decommissioning

Capability & Experience

www.worleyparsons.com

For further information:

Alan StokesGlobal Decommissioning [email protected]: +44 (0) 1224 623 876mob: +44 (0) 7879 331 067

graham taylor Lead Decommissioning [email protected] tel: +44 (0) 1224 623 859mob: +44 (0) 7584 670 256