oculus - asr

9
OCULUS - ASR MICHIGAN TECHNOLOGICAL UNIVERSITY Andrew Mauragis Joshua Ehlert Lars Ramseyer SHOT II POST-LAUNCH JUNE 13, 2010

Upload: sissy

Post on 24-Feb-2016

73 views

Category:

Documents


0 download

DESCRIPTION

OCULUS - ASR. Andrew Mauragis Joshua Ehlert Lars Ramseyer. M ICHIGAN T ECHNOLOGICAL U NIVERSITY. SHOT II P OST- L AUNCH J UNE 13, 2010. E XPECTED R ESULTS:. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: OCULUS - ASR

OCULUS - ASRMICHIGAN TECHNOLOGICAL

UNIVERSITY

Andrew MauragisJoshua EhlertLars Ramseyer

SHOT II POST-LAUNCHJUNE 13, 2010

Page 2: OCULUS - ASR

EXPECTED RESULTS:

- H-bridge temperature increased rapidly during vacuum tests. This mission will test the thermal properties of the H-bridge in low pressure combined with low temperatures (-80 °C).

18:14

18:17

18:20

18:23

18:26

18:29

18:32

18:35

18:38

18:41

18:44

18:47

18:50

18:53

0

10

20

30

40

50

60

70

80

Magnetic Torquer Vacuum Test

H-Bridge 2H-Bridge 1Torque RodPicaxe 1Resistor 3

Time of Day

Temperature (°C)

Page 3: OCULUS - ASR

ACTUAL RESULTS:

Mean ΔT: 4.75 °C

Page 4: OCULUS - ASR

OUTCOME:

• Partial failure of logging payload• Temperature?• Loose Connection?• Batteries?

• Data acquired does not match expected results• In vacuum chamber, component did not reach a

steady-state ΔT after 30 minutes• In payload, ΔT established almost

instantaneously, at 5 C

Page 5: OCULUS - ASR

ANALYSIS AND CONCLUSION:

• Cause for discrepancy?• Different vessel size (small insulated box vs

open board)• Ambient temperatures vs Box temperature

• Requires additional testing:• Consistent ΔT on SHOT payload, but varying

on initial vacuum test• Short in actual test magtorquer (not in our

simulated one)• Likely heatsink h-bridges to Oculus-ASR

structure

Page 6: OCULUS - ASR
Page 7: OCULUS - ASR
Page 8: OCULUS - ASR
Page 9: OCULUS - ASR