NSR OPERATIONSNew rules and possibilities
Speaker: Vladimir VasilyevCNIIMF Ltd. (NSRA data included)
NEW NSR BORDERS – AREAL DEFENITION
2
RE-ESTABLISHED NSR ADMINISTRATION
3
BASIC FUNCTIONS
Applications: apply – consider - issue
Monitoring: hydrometeorology, ice, navigation
ATONs, hydrographic survey – approval
Information support service: organisation, safety requirements, hydrographicsupport, icebreaking assistance
Recommendations: routing, icebreaking support
SAR operations: organisation and assistance
Ice pilotage: certification of pilots
Assistance: spill/garbage combat
4
HOW : Algorithm for permission
Apply early 120 days¥latest 15 working days before entry date
Official website:Publication of
application10 days consideration
Information on acceptance¥refusal – official site
Accepted Declined
5
Application statistics.
2013 ships
- applications - 718;
- permission granted - 635,
Foreign flag - 127 (20 %);
- Declined initially - 83 ,
Finally declined - 18 (3,5 %) Permission granted Declined
Typical ice prediction for 3 days of September 2014 (AARI)
6
Восточно-Сибирскоеморе
Actual ice conditions – September, 2 20147
8
May 2014. Kandalsksha – Isl. Kotelny supply voyage.Cargo Ivan Papanin M/V, support Vaigach Icebreaker
Laptev seaKara sea
East-Siberiansea
Barentz sea
Temp
Kandalaksha
TiksiPevek
Dikson
Sabetta
9
31 May 2014. Fast ice offloading.
10
Ice cutter for channel borders.
11
Sabetta
Dikson
Tanalau
Novy port
Dudinka
Kara Sea activities
«West Alpha»Universitetskaya -1
12
Double action vessel in Dudinka port, winter navigation.
13
Sabetta port construction, CNIIMFRoutes and dredging.
14
Sabetta port construction, CNIIMFVTS, AIS & GMDSS.
15
JGC, in consortium with Technip,awarded the Yamal LNG project in Russia
本プロジェクトは、ロシアの独立系ガス会社であるノバテクが中心となり、ロシア国ヤマル・ネネツ自治区サベタで年産1,650万トンのLNGプラントを新設する計画です。
本プロジェクトにおいて当社は、テクニップとジョイントベンチャーを組み(テクニップがリーダー)、まず最初のフェーズとして、年産1,650万トン (550万トン×3系列)のLNGプラントに係る有償見積り、詳細設計および一部長納期機器の調達役務を遂行します。
16
Winter 2014. Sabetta port construction, cargo vessel leaving port with icebreaker assistance.
17
July 2014. Port Sabetta – constructing of berths.
18
Port of Sabetta and NSR cargo offloading ( 1000 tons).
01. 10. 2013 01. 10. 2014
Dry 309,2 721,8
Liquid 7,3 30,7
All for Sabetta 316,5 752,5 (+436)
All NSR region 2 252,6 2 758,8 (+506)
19
Aigust 2014, Sabetta port.Bulk carrier broken stone offloading.
AARI prognosis for total ice area
г о д ы
тыс. кв. км
20
21
Хатанга
Minimal ice – September 2012
Murmansk
Kara sea Tiksi
Pevek
Sabetta
Laptev sea
East-Siberian sea
Chukchi sea
Dikson
22
Хатанга
Ice for 12 May 2014
Murmansk
Tiksi
Pevek
Sabetta Dikson
23
July 2014. East Siberian Sea. Indiga M/V stuck in ice channel.
24
05.07.2014
14.07.2014
29.06.2014 1300 NM - 6 days
300 NM9 days
July 2014 Indiga voyage (Vaigach support).
Polar Code northern area
26
Not contradicting any UNCLOS articles, including 234 ;Based on SOLAS and MARPOL & includes AFS, BWM and STCW rquerements;Introduces “Polar Classes” system only dealing with ice strengthening not referring to ME power and hull shape;For new and existing vessels survey is needed to issue required certificate, manual and update ship documents;Multiply definitions (e.g. scope of application for ships of certain types & tonnage, international voyage for Antarctic region ) and statements need further clarifications except for the geographical area.
Polar Code – some conclusions
27