november 2009 0 shipbuilding and ship procurement for the spanish navy briefing for: school of...
TRANSCRIPT
NOVEMBER 2009 1
SHIPBUILDING AND SHIP PROCUREMENTFOR THE SPANISH NAVY
BRIEFING FOR: SCHOOL OF POLICY STUDIES
QUEEN'S UNIVERSITY
BRIEFING FOR: SCHOOL OF POLICY STUDIES
QUEEN'S UNIVERSITY
NOVEMBER 2009 2
SHIPBUILDING PROGRAMSHIPBUILDING PROGRAM
ENTERING THE FINAL STAGE OF ONE OF THE MOST AMBITIOUS SHIPBUILDING PROGRAM OF THE SPANISH NAVY HISTORY
NOVEMBER 2009 3
THE SHIPBUILDING MODEL
THE SHIPBUILDING STRATEGY IS AT THE
CORE OF OUR CAPABILITY TO DESIGN, BUILD,
SUPPORT AND EVOLVE, THROUGH THE LIFE
CYCLE, THE FLEET
NOVEMBER 2009 4
THE SHIPBUILDING MODEL
• THE PILLARS
• A LONG-TERM SHIPBUILDING
STRATEGY
• RULES OF ENGAGEMENT
• THE CHALLENGES
• THE DELIVER RESULTS
NOVEMBER 2009 5
THE SHIPBUILDING MODEL
THE PILLARSTHE PILLARS
NOVEMBER 2009 6
THE PILLARS OF THE MODEL
THEORY
OF NICHES
THEORY
OF NICHES
THE NAVY
A PROACTIVE ROLE
THE NAVY
A PROACTIVE ROLE
NAVANTIA
SOLE SOURCE
SHIPYARD
NAVANTIA
SOLE SOURCE
SHIPYARD
THE INDUSTRIALMODEL
THE INDUSTRIALMODEL
FABA
COMBAT SYSTEMS
FABA
COMBAT SYSTEMS
THE BEST
TECHNOLOGICAL
PARTNER
WE CAN AFFORD
THE BEST
TECHNOLOGICAL
PARTNER
WE CAN AFFORD
NOVEMBER 2009 7
WHY SOLE SOURCE SHIPYARD?
• WE CAN'T AFFORD COMPETITION
• LIMITED NUMBER OF CONTRACTS,
MANY DIFFERENT TYPES OF SHIPS
AND SMALL NUMBER OF SHIPS BY
CLASS ( SOME PROTOTYPES) MAKES
UNREALISTIC DIFFERENT SHIPYARDS
IN COMPETITION
• NAVANTIA IS OUR SOLE SOURCE
SHIPYARD AND A STRATEGIC ASSET
FOR THE NAVY
SOLE SOURCE SHIPYARD
NOVEMBER 2009 9
ENGINEERING & PRODUCTIONCRITICAL MASS
ALFLOT HQ
FERROL
ROTACARTAGENA
FERROL SHIPYARD
SAN FERNANDO
PUERTO REALFABA
ENGINES
NOVEMBER 2009 12
THE ROLE OF THE NAVY
• CLEAR DEFINITION OF OP REQS
• MAINTAIN THE TECHNICAL SPECS CODE
• CONTROL THE SHIPBUILDING PROCESS
• COMPETENCY IN THE :
– DESIGN
– BUILDING
– RISK ASSESSMENT
– COST ESTIMATE & NEGOTIATION
– SYSTEM ENGINEERING
– SHIPYARD BUSINESS
• DRIVER OF TECHNOLOGY
IMPROVEMENTS
THE NAVY IN CONTROL OF
THE ENTIRE
BUILDING PROCESS
NOVEMBER 2009 13
THE SHIPBUILDING MODEL
A LONG-TERMSHIPBUILDING STRATEGY
A LONG-TERMSHIPBUILDING STRATEGY
NOVEMBER 2009 14
A LONG-TERM SHIPBUILDING STRATEGY
XXI CENTURYXXI CENTURYXXXX
OWN DESIGN PHASE
LE
VE
L O
F N
AT
ION
AL
DE
SIG
N
70’s decade 80’s decade 90’s decade
OWN CONSTRUCTION
IMPORTED DESIGN
PHASE
S-70
S-80
F310
F-100
LHD
FFG
LPD
PDA
S-60
DEG
S-70
FUTURE FRIGATE
AUSTRALIAN LHDs
AAW DESTROYER
Corvettes
F-100
NOVEMBER 2009 15
THE SHIPBUILDING MODEL
THE CHALLENGESTHE CHALLENGES
NOVEMBER 2009 16
THE CHALLENGES
THEORY
OF NICHES
THEORY
OF NICHES
THE NAVY IN
CONTROL OF THE
ACQUISITION PROCESS
THE NAVY IN
CONTROL OF THE
ACQUISITION PROCESS
THE BEST
TECHNOLOGICAL
PARTNER
WE CAN AFFORD
THE BEST
TECHNOLOGICAL
PARTNER
WE CAN AFFORD
SOLE SOURCE
SHIPYARD
SOLE SOURCE
SHIPYARD
CONTAIN COST IN ASOLE SOURCE SCENARIO
CONTAIN COST IN ASOLE SOURCE SCENARIO
RELEASABILITY ISSUESRELEASABILITY ISSUES
KEEP KNOW-HOWWITHIN THE NAVY
KEEP KNOW-HOWWITHIN THE NAVY
COMMERCIAL Vs MIL SPCSCOMMERCIAL Vs MIL SPCS
CONTINUOUS&COMPETITIVELONG TERM IMPROVEMENT
CONTINUOUS&COMPETITIVELONG TERM IMPROVEMENT
NOVEMBER 2009 17
THE MODEL
RULES OF ENGAGEMENTRULES OF ENGAGEMENT
NOVEMBER 2009 18
“RULES OF ENGAGEMENT”
• RESTRAIN CHANGES DURING CONSTRUCTION• EMPLOY SAME SYSTEM ENGINEERING AND
MANAGEMENT PROCEDURES ACROSS THE PROGRAM
• DO NOT START CONSTRUCTION UNTIL DESIGN IS MATURE
• SATISFY PERFORMANCE AND SCHEDULE AT ACCEPTABLE RISK AND AFFORDABLE COST
• ALLOW FUTURE GROWTH FOR EMERGING OPERATIONAL REQUIREMENTS
NOVEMBER 2009 19
THE SHIPBUILDING MODEL
THE DELIVER RESULTSTHE DELIVER RESULTS
NOVEMBER 2009 20
F-100 FRIGATE
CONCEPT: FRIGATE FOR AAW SUPERIORITY. A FULL AEGIS IN A 6000 TONS SHIP
ACQUISITION STRATEGY:• NAVANTIA PRIME CONTRACTOR• NATIVE DESIGN FOR THE
PLATFORM• AEGIS FMS & NATIONAL DESIGN
FOR COMBAT SYSTEM• USN SUPPORT KEY FOR
INTEGRATION AND CSSQT
NOVEMBER 2009 21
S-80 A SUBMARINE OF THE NEXT GENERATIOM
THE COMBINATION OF AN AIP SYSTEM AND STRIKE CAPABILITY MAKES THE S-80 A SUBMARINE OF THE NEXT GENERATION
NOVEMBER 2009 22
SUBMARINE S-80
CONCEPT: CONVENTIONAL SUBMARINE COMBINING AIR INDEPENDENT PROPULSION AND STRIKE (TACTOM)
ACQUISITION STRATEGY:• NATIVE DESIGN• PRIME CONTRACTOR NAVANTIA• LOCKHEED MARTIN TECHNOLOGICAL
PARTNER FOR THE COMBAT SYSTEM• UTC TECHNOLOGICAL PARTNER FOR
POWER CELLS
USN KEY FOR ESTABLISHING THE SUBSAFE PROGRAM AND TACTOM INTEGRATION
NOVEMBER 2009 23
S-80 PROGRAM
NOVEMBER 2009 24
S-80 PROGRAM
NOVEMBER 2009 25
LHD
CONCEPT : A FORCE PROJECTION UNIT THAT COMBINES AMPHIBIOUS, HELO & VSTOL CAPABILITIES
ACQUISITION STRATEGY:• NAVANTIA PRIME CONTRACTOR• NATIVE DEVELOPMENT OF
COMBAT SYSTEM AND SENSORS• USN SUPPORT KEY FOR FLIGHT
CERTIFICATION AND JSF INTEGRATION
NOVEMBER 2009 26
PROJECTION CAPABILITY
NOVEMBER 2009 27
PROJECTION CAPABILITY
NOVEMBER 2009 28
BAC
CONCEPT : A FORCE SUPPORT UNIT
ACQUISITION STRATEGY:• NAVANTIA PRIME CONTRACTOR• NATIVE DEVELOPMENT OF
COMBAT SYSTEM AND SENSORS
NOVEMBER 2009 29
CONCLUSIONSCONCLUSIONS
THE SHIPBUILDING MODEL IS OPTIMIZED TO OUR CONSTRAINS AND NEEDS AND HAS PROVEN VERY SUCCESSFUL IN FULFILLING THE MAIN OBJECTIVE OF BUILDING A BALANCED AND MODERN FLEET