NOVA IRON & STEEL LIMITED GOVERNMENT LAND
VILLAGE DAGORI VILLAGE
AMERI AKBARI VILLAGE
SHAKTIGHAT
Khasra No. Khasra No. Khasra No.
244/2 615 01
799.08 885 10
860 886 11
960 894
895
896
PRIVATE LAND
VILLAGE - AMERI AKBARI
Khasra No.
883/1 897/1 422/2 814/2 696/1,2 911/3
883/3 613/2 475 507/2 690/1 911/5
883/2 613/4 476/4 508 804/4 911/2
890 697/3 564/3 866/4 872/2 911/1
889 687/2 696/3 954/2 867/22/K/1 775/3
880/1 817/1 429/1 801/2 866/1 639/3
880/2 898 564/6 784 437/1 757/4
882/2 609/1 595/2 446/2 437/2 758/3MS
881/2 613/1 621/3 446/4 439 551
882/1 903/2 625/2 775/2 459 735/7
884 638 556/1 668 872/1 847/5
888/1 607/1 547 867/14 867/40 847/6
882/3 867/5 538 446 793/1MS 454/2
881/1 867/6 867/2KH 618 793/2 433/1
882/2 867/7 540 636 749/1 751
888/4 867/22K 596/2 664 801/1 756/1
887 867/54 445 384/2 874 405
888/3 891 464 803 536/1 687/1
769 897/4 594/1 780/2 706/1 423
853/3 623/2 954/4 867/38 482 389
314/1 846/3 411/2 688/2 596/1 707/12
506/1 813/1 564/4 867/17 512 386
628 813/2 564/2 867/30 514 804/2
619/2 813/3 801/3 878 603 851
802/2 813/5 835/2 854/1 639/1 707/9MS
867/2 719 835/4MS 790 & 791 492 707/9MS
499 748/1 675/5 709/1 436 795/1
802/1 867/18/4 804/3 834/2 604 404/2
867/2G 867/18/3 846/2 582 703 524
621/1 814/1 758/1 583 390 720/1
- 2 -
502 840/2 629 585 393 722/1
503 622/2 631 586 689 722/2
509/1 608 570 587 834/3 651
574 455 576/1 588/1 675/4 748/3
903/1 867/24 546 589 675/2 753/1
569 867/35 635 867/23 780/1 754/1
573 867/36 867/18/2 536/2 823 754/2
633 867/44 867/51 536/3 824/1 406/3
634 867/46 447/1 536/4 721 418/2
900 867/47 477 675/1 743/1 419
893/1 867/42 867/18/5 553 660 411/1
893/2 855/2 835/4 556/2 406/6 640
893/3 867/43KH 707/1 565/1 748/2 562
607/2 867/41KH 593 597 406/5 563
591 867/43K 620/2 598 560 730/1
616 867/45 835/1 730/2 535 735/1
435 456 544 418/1 867/33 424
460 461 559/1 476/1,2,3 579/2 753/2
588/2 490 675/3 483 844/1 409
873/2 422/1 398 564/1 443 639/2
543 653/3 579/1 734/3 653/1 860
685 843 580 758/4 653/2 835/5
724/1 852/1 858/3 749/2 758/5 682
735/2 852/2 828 758/3 911/4 814/3
745/2 857/1 829 521 699/2 816
759/1 862 830 645 746/2 867/10
759/2 571 866/3 740/1 622/1 683/2
766 659 834/12 858/2 627 623/1
454/1 683/1 867/48 859 729 642
595/1 724/3 407 867/55 690/2 491
621/2 623/3 412/2 853/5 737/2 877/4
625/1 833 578 641 515 688/2K
509/2 867/22/3K 619/1 647 845/2 853/4
561 527 624/1 519 775/1 854/2
717 525 827 530 749/2 855/5
550 528 841 847/7 760/2
813/4 637 845/1 688/4 877/3
PRIVATE LAND
VILLAGE - DAGORI
Khasra No.
871/2 894 868/2 889/1 807/4 831
867/7 818 870/2 889/2 822 841/3
867/11 856/2 807/3 877/2 857/1 826
867/12 867/1 851/2 877/1 857/5 827
867/5 867/2 895/2 877/3 857/2 852/4
- 3 -
867/6 867/9 886/2 824MS 807/2 270/1
874/2 867/10 870/3 893/11 824/1 270/2
861/1 867/4 863/2 893/10 846 287
862/1 867/3 786/2 893/3 868/1 676/2
672/2 867/14 829 842 870/1 938
674/1 867/13 832 886/6 801/1 953
873/1 863/1 895/6 886/1 885/2 954
989/2 1155/1 1018 1150/1MS 857/3
1019 1155/2 1033/1 1155/3 857/4
PRIVATE LAND
VILLAGE - UDANTAL
Khasra No.
145/1 21/18 60/12 126/8 186/2 158/1
126/10 21/1 60/13 143/2 187/2 126/19
21/13 21/6 62/1 126/4 135/3 164/12
60/11 60/8 62/5 145/7 155/2 113/2
62/4 62/8 62/6 21/4 152/4 117/2
163/2 159/1 62/7 126/1 152/3 12/2
21/14 159/5 82/1B 13 11/1 126/3
21/17 163/4 82/2 14/1 11/2 163/3
21\8 124/1 83/1 14/2 138 164/11
168/6 15 83/2 14/3 139/10 117/10
21/9 59/3 88/1 14/4 164/13 126/18
21/16 59/4K 88/2 143/2G 145/4 152/2
60/10 60/1B 43/10 143/2C 145/5 111/1
62/3 27/2 43/7 122 145/6 111/2
7/2 37/5 43/8 51/2 164/9 111/3
6 37/4 51MS 143/2 22/2MS 117/1
9 43/2 88/3 57/8 21/19
27/1 60/6 89 150/1 334/2
21/12 60/9 90 150/2 76
PRIVATE LAND
VILLAGE - SAKTIGHAT
Khasra No.
13/3 13/1 5/2 20/3
3/5 3/9 3/2 17
15 6 19
- 4 -
ANNEXURE - 2
Item No. 1.1 - Land requirement and present landuse Total land required for the 1.5 MTPA integrated steel plant with CPP is about 480 acres. Total land available with NISL is 803.05 acres. The land schedule of the above mentioned land is as mentioned below. - Government Land .. abt. 383.00 acres (154.99 ha)
- Private Land .. abt. 420.05acres(169.99 ha) Total .. abt. 803.05 acres (324.98 ha) ● Land area requirement: - Steel Plant .. abt. 480.0 acres (194.25 ha) - Reserve for Greenbelt development .. abt. 265.0 acres ( 107.24 ha) - Others .. abt. 58.05 acres (23.49 ha) Total for the Plant .. abt.803.05 acres(324.98 ha)
Apart from the above said area NISL possesses about 150 acres of land separately outside the plant for storage and disposal of waste. Plant General Layout
The tentative Plant General Layout is shown in Fig. 1.
- 5 -
ANNEXURE - 3 Item No. 1.13 – Proposed production and manufacturing process under expansion 1. Production
1.1 Intermediate Products (TPA)
DRI .. 660,000
Sinter .. 2,256,700
Hot Metal .. 1,464,300
Pig Iron .. 546,200
Liquid Steel .. 1,631,300
1.2 Finished Products
• Wire Rods .. 500,000
• Medium Section .. 650,000
• Light Section .. 371,300
2. Manufacturing Process
2.1 Process Route
The proposed integrated iron and steel plant will adopt
conventional blast furnace-electric arc furmace-billet/bloom casting (BF-EAF-Caster) route and DRI-Induction furnace-billet caster (DRI-IF-Caster) route. The process of liquid steel making is pyro-metallurgical, having operational temperature 16000C to 17000C.
2.2 Process Description
2.2.1 The process steps for carbon steel products in sequence are as follows:
- Agglomeration of Iron Ore fines by sintering
- Hot Metal making in BF by reduction of sintered, lump iron ore and pellets with coke in presence of additive materials
- DRI making in DR Kiln by direct reduction of Iron Ore pellet with coal
- Oxidation of carbon present in the hot metal by oxygen blowing in presence of lime in BOF for producing liquid steel.
- Refining of liquid carbon steel by addition of micro- alloys to get the desired chemistry of liquid carbon steel for casting
- Continuous casting of refined liquid carbon steel to billets / thin slab.
- 6 -
- Further rolling of thin slab to produce different types of long products and flat products.
2.2.2 The supporting process units as planned would be –
(i) Lime and dolo calcining
(ii) Coal Washery
(iii) Captive Power Plant and
(iv) Water Treatment Plant
3. Main Production Facilities
The following are the main production facilities:
Sl No. Facilities
Existing Plant
Facilities
Proposed Facilities
Plant Configuration at 1.5 MTPA
(i) Coal Washery - 1 x 1.5 MTPA 1 x 1.5 MTPA
(ii) DRI Kiln 1 x 500 TPD 3 x 500 TPD 4 x 500 TPD
(iii) Sinter Plant - 1 x 248 sqm 1 x 248 sqm
(iv) Calcining Plant - 2 x 600 TPD 2 x 600 TPD
(v) Blast Furnace - 1 x 1008 cum 1 x 550 cum
1 x 1008 cum 1 x 550 cum
(vi) EAF - 2 x 90 ton 2 x 90 ton
(vii) LF - 2 x 90 ton 1 x 15 ton
2 x 90 ton 1 x 15 ton
(viii) IF 3 x 15 ton - 3 x 15 ton
(ix) VD/AOD - 2 x 90 ton 2 x 90 ton
(x) HMDP - 1 x 250 ton 1 x 250 ton
(xi) Billet Caster - (1 x 2) Strand (1 x 2) Strand
(xii) Billet cum Bloom Caster - (2 x 4) Strand (2 x 4) Strand
(xiii) Wire Rod Mill - 0.6 MTPA 0.6 MTPA
(xiv) Medium Section Mill - 0.7 MTPA 0.7 MTPA
(xv) Light Section Mill - 0.22 MTPA 0.22 MTPA
(xvi) Captive Power Plant -
260 MW 260 MW
(xvii) Oxygen Plant -
1 x 600 TPD 1 x 600 TPD
- 7 -
ANNEXURE - 4 Item No. 1.14 - Facilities for storage of goods or materials Solid raw materials like iron ore, coke, limestone etc will be stored in open stock pile within the plant boundary. BF gas will be stored in dry type gas holders. Raw water supply from Sheonath River coming through pipeline will be stored in reservoir within the acquired area. The slag and other solid wastes after reuse in the plant will be temporarily dumped in the earmarked area outside the plant boundary for future use.
- 8 -
ANNEXURE - 5 Item No. 1.15 - Facilities for treatment or disposal of solid wastes or liquid effluents Solid wastes disposal
Non-hazardous solid wastes (NHSW)
It is estimated that about 2.21 MTPA (approx 6070 TPD) additional NHSW would be generated by the facilities proposed under the expansion to 1.5 MTPA. The quantity of such NHSW would be as follows:
BF Slag .. 453,900 TPA EAF Slag .. 224,600 TPA IF Slag .. 13,400 TPA LF Slag .. 19,600 TPA Dusts, Millscales, .. 58,100 TPA Sludges Coal Tailings .. 451,500 TPA CPP Ash .. 993,693 TPA
Disposal of NHSW
It is planned to market 100 per cent of BF slag to the ready-mix concrete companies after converting the slag into Ground Granulated Blast furnace Slag (GGBS) and Dry Slag. EAF and IF slag would be used as construction material. 100% of the mill scales would be used in the Sinter Plant. It is also planned that maximum amount of dusts and sludge would be used in the sinter plant.
Hazardous wastes (HW)
The HW would comprise oil sludge, ETP sludge and other combustible wastes. ETP sludge would be disposed through authorised agency for disposal of Hazardous Waste. Liquid effluents
The liquid effluents will be of two types, namely, (i) Mill effluent containing suspended solids, oil and grease, and (ii) Gas Cleaning Plant effluent containing suspended solids. Each production shop generating this type of effluent will be equipped with treatment plant of adequate capacity. Treated effluent will be utilised in slag cooling, dust suppression and other non-production use. The treatment schemes will be suggested in EIA Report.
- 9 -
ANNEXURE - 6
Consent for Water Withdrawal
- 10 -
- 11 -
ANNEXURE - 7 Item No. 2.3 - Minerals For the proposed expansion project up to 1.5 MTPA crude steel, it is estimated that nearly 7.14 MTPA minerals would be required as presented in Material Flow Scheme in Fig. 2. The relative requirements of minerals and mineral based products would be as follows:
Sl No. Raw Material Proposed requirement at 1.5 MTPA
Iron Ore (Fines) 1,653,500
Iron Ore (Pellet) 1,471,600
Purchased DRI 213,500
Purchased Coke 606,200
Raw Coal 1,500,000
Non coking Coal 461,700
PCI Coal 175,700
Boiler Coal 770,900
Raw Limestone 606,900
Purchased Limestone 127,500
Raw Dolomite 114,700
Quartzite 22,000
Pyroxenite 69,100
Fluorspar 4,100
Ferro - Alloys 20,450
- 12 -
Fig. 1 Plant General Layout
- 13 -
Fig. 2 Plant Material Flowsheet