© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 3 March 19, 2015

Upload: others

Post on 07-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

© 2014 HDR, Inc., all rights reserved.

North Country Access Improvements

Stakeholder Advisory Committee

Meeting No. 3

March 19, 2015

Page 2: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Introductions

Tasks Completed Since SAC Meeting No. 2

Technical Memorandum 2: Canton to Potsdam Corridor Existing Conditions (Draft)

NCAI Next Steps

Yes 11 Survey

Open Discussion

Agenda

Page 3: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Completed Draft Technical Memorandum 1 –

Watertown to Plattsburgh Corridor Review

Completed Draft Technical Memorandum 2 –

Existing Conditions: Canton to Potsdam

Corridor

Commenced Technical Memorandum 3 –

Project Scoping Alternatives

Tasks Completed Since SAC Meeting No. 2

Page 4: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Traffic and Safety Operations

Multimodal

Border Crossing Activity

Freight Movement Analysis

Travel Demand Model

Environmental Conditions

Infrastructure

Technical Memorandum 2 – Canton to Potsdam (Draft) Existing Conditions

Page 5: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Automated traffic recorder counts (ATR)

Midblock counts with vehicle classification

Video turning movement counts (TMC) with vehicle classification

Travel time and delay

Intersection inventory

Field signal timing

NYSDOT signal timing

Manual roadside interview survey

Traffic Data Collection

Page 6: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Traffic Data Collection Locations

Data collected in September and October 2014

Page 7: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Speeds

Roadway From To

Minimum

Posted

Speed

(mph)

Maximum

Posted

Speed

(mph)

Average

Posted

Speed

(mph)

Direction

AM Period PM Period

GPS

Measured

Speed

(mph)

VISUM

Average

Modeled

Speed

(mph)

GPS

Measured

Speed

(mph)

VISUM

Average

Modeled

Speed

(mph)

1 Route 420 Route 11 Route 11C 30 45 41 NB 34 37 38 37

SB 34 38 38 38

2 Route 11C Route 11 Route 420 35 55 47 NB 38 43 39 43

SB 39 42 41 41

3 Route 68 Brewer Road 260m N of

Route 11 40 40 40

NB 40 37 40 38

SB 44 39 40 35

4 Route 345 Mechanic

Ave

Crescent

Apartments 30 30 30

NB 21 28 25 26

SB 22 27 22 26

5 Route 72 Wheeler Rd Route 56 40 40 40 NB 35 40 40 40

SB 39 40 40 40

6 Route 11C Route 420 Buck Avenue 30 35 34 NB 32 31 N/A N/A

SB 33 30 N/A N/A

7 Route 11 Mall

Driveway Route 56 30 35 34

EB N/A N/A 32 N/A

WB N/A N/A 41 N/A

*N/A: Not Available

Page 8: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Speeds – Route 11 - PM

GPS speed: 32 mph

Average posted speed: 34 mph

GPS speed: 41 mph

Average posted speed: 34 mph

Page 9: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Highway Capacity Manual 2010, Transportation Research Board

Qualitative measure used to evaluate traffic flow on various transportation facilities

Level of Service

LOS Control Delay (seconds/vehicle)

Signalized Intersection Unsignalized Intersection

A 0-10 0-10

B > 10-20 > 10-15

C > 20-35 > 15-25

D > 35-55 > 25-35

E > 55-80 > 35-50

F > 80 > 50

Source: Highway Capacity Manual 2010

Page 10: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Level of Service (LOS)

LOS Control Delay (seconds/vehicle)

A Exceptionally favorable progression. Most vehicles travel through the

intersection without stopping. Free flow operation.

B Very favorable progression. More vehicles are stopped than LOS A.

C Favorable progression. Individual cycle failures may begin to appear.

Significant number of vehicles stopping, but many will pass through the

intersection without stopping.

D Ineffective progression. Individual cycle failures are noticeable. Many

vehicles stop.

E Unfavorable progression. Individual cycle failures are frequent.

F Poor progression. Most vehicles fail to clear the queue.

Source: Highway Capacity Manual 2010

Page 11: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Vehicle classifications

Speeds

Grade

Signal timings

Roadway geometry

Pedestrian activity

Traffic volumes

Factors Affecting LOS

Page 12: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

*Design Hour Volume

Legend

Traffic flow

Major movements

Segment Volume

Page 13: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Existing Peak Period LOS

B(B) C(C)

B(C)

B(B)

Canton

X(X)

X(X) Signalized intersection LOS

AM (PM)

Unsignalized intersection LOS

AM (PM)

Queue not processed in one cycle

X(X) 2-Lane Highway Analysis

AM (PM)

X(X) LOS A

X(X) LOS B

X(X) LOS C

X(X) LOS D

Page 14: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

*DHV

Legend

Traffic flow

Major movements

Segment Volume

Page 15: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Existing Peak Period LOS

C(C)

C(C)

A(A) C(C)

B(B) B(B)

C(C)

B(C)

Canton

Route 11 LOS between Morgan/Dayton

Rd and Walmart Driveway

o LOS D for WB PM

o LOS C for AM and EB PM

A(B) Walmart

X(X)

X(X) Signalized intersection LOS

AM (PM)

Unsignalized intersection LOS

AM (PM)

Queue not processed in one cycle

X(X) 2-Lane Highway Analysis

AM (PM)

X(X) LOS A

X(X) LOS B

X(X) LOS C

X(X) LOS D

Page 16: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Legend

Heavy movements

Page 17: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Existing Peak Period LOS – Gouverneur and De Kalb De Kalb

C(C)

B(B)

B(B)

X(X)

X(X) Signalized intersection LOS

AM (PM)

Unsignalized intersection LOS

AM (PM)

Queue not processed in one cycle

X(X) 2-Lane Highway Analysis

AM (PM)

X(X) LOS A

X(X) LOS B

X(X) LOS C

X(X) LOS D

Page 18: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Crash Locations – Canton (April 2011 – March 2014)

Legend

0 crashes

1-5 crashes

6-15 crashes

16-25 crashes

26-35 crashes

35+ crashes

HAL

X

X

XX

XX

XX

XX

XX

6 21

16

0

13

Page 19: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Crash Locations – Potsdam (April 2011 – March 2014)

Legend

0 crashes

1-5 crashes

6-15 crashes

16-25 crashes

26-35 crashes

35+ crashes

HAL

X

X

XX

XX

XX

XX

XX

1

10

13

13

14

47 15 8

Page 20: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Crash Locations – Gouverneur/De Kalb (Apr 2011 – Mar 2014)

Legend

0 crashes

1-5 crashes

6-15 crashes

16-25 crashes

26-35 crashes

35+ crashes

HAL

X

X

XX

XX

XX

XX

XX

13

3

0

Page 21: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Multimodal – Pedestrians and Bicyclists

Potsdam

Canton

Minimal activity outside of Potsdam, Canton, and Gouverneur

o Potsdam

• ~20-40 ped/hr at Market/Elm in the AM

• ~80-110 peds/hr at Market/Elm in the PM

• Elm/Main and Pierpont/Lawrence area has has ~20-30

peds and ~10-15 bikes/hr in the PM (minimal in AM)

o Canton

• ~30-60 ped/hr at Main/Park in the AM

• ~60-80 peds/hr at Main/Park in the PM

• Minimal bike activity

o Gouverneur

• ~ 20-30 peds/hr at Main/Clinton

• Minimal bike activity

Page 22: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Railroad Crossings

Canton

Potsdam

Canton Potsdam

Existing Railroad Crossings

Page 23: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Majority of trucks are expected to have an origin or destination within the North Country region

Major freight generators

o Local businesses and retail stores

o Agricultural and timber vendors

o Alcoa aluminum

o Port of Ogdensburg

o Massena rail terminal

NY border crossings – 9.55% of all trucks crossing from Canada to U.S. (inbound)

Most trucks from Massena and Trout River border crossings have NY origin/destination

Alexandria Bay and Champlain border crossings used for transporting goods to other states

Freight Activity

Page 24: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

2,922 surveys completed

o Canton (Westbound) - 1,484 (36% capture rate)

o Potsdam (Eastbound) - 1,438 (50% capture rate)

Route 11 Manual Roadside Interview Survey Results Eastbound Survey

Westbound Survey Majority of

respondents

expressed interest

in using a bypass if

available

Page 25: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

TDM is a systematic process or mathematical representation of the transportation system, with

data on population and economic activity and the principles of supply and demand, to estimate

travel behavior of people in the region.

They simulate the effect on traffic patterns (travel demand) of changes in the road

Estimate the amount of travel on the transportation system

Planning tool

Model users

o County

o Villages and towns

o Developers

o Consultants

o State

Travel Demand Modeling (TDM)

Page 26: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Analyzing general plans

Traffic impacts of development

Corridor studies

Evaluating traffic mitigation

Evaluating emission impacts for transportation conformity

Uses of the Model

Page 27: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Trip generation – How many trips occur in each zone?

Trip distribution – How many trips travel from one zone to any other zone?

Modal split – What travel modes do they use?

Traffic assignment – trips from one zone to another are assigned to travel routes

Four Step Modeling Process

Page 28: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Only as good as the inputs

Cannot predict changes in land use or attitudes

Average weekday model

Travel occurring only on the network – no off road traffic

Limitations of NCAI Travel Demand Model

Page 29: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Travel Demand Model Development Process

Refined Auto O-D

Trip Tables

Refined Truck O-D

Trip Tables

Develop

Roadway

Network

Develop Auto O-D

Trip Tables

Develop Truck O-D

Trip Tables

Traffic Counts

#2 Trip Generation, Distribution, and Externals #3 Trip Assignment

#1 Model Zones and

Network

Feedback Feedback

Roadway

Network Data

Set Study Area &

Traffic Analysis Zones

Census and

Survey

Trip Data

Truck Only

O-D Data

Vehicle

O-D Data

Multi-Class

Highway

Assignments

#4 Calibrate Model

#5 Report 2014 Baseline

Results

Page 30: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

TDM Network by NYSDOT Functional Class

Potsdam

Canton

Gouverneur

Potsdam Canton

Page 31: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

TDM Network Link Capacity

Potsdam

Canton

Gouverneur

Canton Potsdam

Page 32: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Average Daily Auto Traffic Comparison

Calibrated to within 25% of observed volumes

Root mean square error (RMSE) of 14% for autos

Canton Potsdam

Page 33: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Calibrated to within 25% of observed volumes

RMSE of 23% for trucks

Average Daily Truck Traffic Comparison

Canton

Potsdam

Page 34: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Land Use

Public Parks and Recreational Resources

Agricultural Districts

NWI and NYSDEC Wetlands

NYSDEC Classified Streams

Historic Resources

Environmental Justice

Environmental Conditions

Page 35: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Land Use

Page 36: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Public Parks/Recreation Resources

Page 37: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Public Parks and Recreational Resources

Page 38: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

NYS Agricultural Districts

Page 39: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

NWI and NYSDEC Wetlands

Page 40: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

NYSDEC Classified Streams

Page 41: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Historic Resources

Page 42: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Historic Resources

Page 43: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Potential Environmental Justice Areas

Page 44: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

• Design Standards

• Pavement and Shoulder Conditions

• Bridge Conditions

• Non-Standard/No-Conforming Features

• Utilities

• Street Lighting

• Right-of-Way

Infrastructure

Page 45: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Utilized NYSDOT Highway Design Manual Chapter 2

o Standards are Presented for Urban and Rural Arterials

o Within the Village boundaries of Canton and Potsdam, Route 11 is classified as an

Urban Principal Arterial

o Outside the Village boundaries of Canton and Potsdam, Route 11 is classified as a

Rural Arterial

o Existing Highway Section is described from 2 Miles west of Canton to 2 Miles east of

Potsdam

Design Standards

Page 46: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Derived From NYSDOT Region 7 Pavement Data Report (2013)

Project Limits Are Divided Into 15 Reporting Segments

Pavement Condition Varies From A Scale Of 6 To 10 Out Of 10.

o 9–10: Excellent, No significant surface distress

o 7-8: Good, Surface distress beginning to show

o 6: Fair, Surface distress is clearly visible

o 1-5: Poor, Distress is frequent and severe

o U: Under Construction, not rated due to ongoing work

Pavement And Shoulder Conditions

Canton

Potsdam Potsdam

Page 47: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Pavement And Shoulder Conditions

Canton

Potsdam Potsdam

Milepost (Municipality) Milepost (Municipality) Rating

28.03 (Town of Canton) 29.85 (Town of Canton) 8

29.85 (Town of Canton) 29.95 (Town of Canton) 9

29.95 (Town of Canton) 30.04 (Town / Village line) 7

30.04 (Town / Village line) 30.67 (Village of Canton) 6

30.67 (Village of Canton) 31.43 (Village of Canton) 10

31.43 (Village of Canton) 31.48 (Village of Canton) 6

31.48 (Village of Canton) 31.92 (Village of Canton) 9

31.92 (Village of Canton) 32.05 (Village of Canton) 7

32.05 (Village of Canton) 32.83 (Town of Canton) 8

32.83 (Town of Canton) 33.65 (Town of Canton) 7

33.65 (Town of Canton) 35.11 (Town of Potsdam) 9

35.11 (Town of Potsdam) 40.94 (Village of Potsdam) 8

40.94 (Village of Potsdam) 42.19 (Village of Potsdam) 6

42.19 (Village of Potsdam) 43.22 (Town / Village line) 7

43.22 (Town / Village line) 45.20 (Town of Potsdam) 7

Source: NYSDOT Region 7 Pavement Data Report (2013)

Ratings are as follows:

9–10: Excellent, No significant surface distress

7-8: Good, Surface distress beginning to show

6: Fair, Surface distress is clearly visible

1-5: Poor, Distress is frequent and sever

U: Under Construction, not rated due to ongoing work

Page 48: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Documented From Biennial Inspection Reports

Seven Bridges Identified Within The Project Limits

Five Are Owned And Maintained By NYSDOT And Condition Ratings Are Presented.

Two Are Owned By CSX Railroad. Condition Ratings Are Not Available.

Bridge Conditions

Canton

Potsdam Potsdam

NYSDOT Numerical Rating Definitions

1 Totally deteriorated, or in failed condition.

2 Used to shade between ratings of 1 and 3.

3 Serious deterioration, or not functioning as originally designed.

4 Used to shade between ratings of 3 and 5.

5 Minor deterioration, but functioning as originally designed.

6 Used to shade between ratings of 5 and 7.

7 New condition. No deterioration.

NYSDOT Condition Ratings

BIN Feature Carried Rating

1008770 U.S Rt 11 over Grasse River 5.516

1008780 U.S Rt 11 over Grasse River 5.139

1008800 U.S Rt 11 over Trout Brook 6.500

1008810 U.S Rt 11 over CSX Railroad 5.042

1071930 U.S Rt 11 over Raquette River 5.958

7008760 CSX Railroad over U.S Rt 11 Information not available

7008790 CSX Railroad over U.S Rt 11 Information not available

Page 49: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Non-Standard/Non-Conforming Features: Shoulder Width

Canton

Page 50: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Non Standard/Non-Conforming Features: Stopping Sight Distance

Canton

Page 51: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Non Standard/Non-Conforming Features: Maximum Grade and Miscellaneous

Canton

Page 52: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Electrical – National Grid

Telephone – Nicholville Telephone Company (Slic), Verizon

Cable TV – Time Warner Cable

Telecommunications – Development Authority Of The North Country

Gas – St. Lawrence Gas

Water – Town And Village Of Canton, Town And Village Of Potsdam

Sewer – Town And Village Of Canton, Town And Village Of Potsdam

Utilities

Canton

Page 53: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Utilities: Telecommunication Lines in Canton, NY and Potsdam, NY

Page 54: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Utilities: Underground Gas Lines in Canton, NY and Potsdam, NY

Page 55: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Utilities: Water Mains and Sewer Mains in Canton, NY

* Please note: Potsdam water and sewer information was unavailable.

Page 56: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Utilities: Storm Lines in Canton, NY

Page 57: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Street Lighting Exists Only Within The Villages Of Canton And Potsdam

Street Lighting

Canton

Right Of Way Gathered From As-built Record Plans

No Field Verification

Typically 66 Ft Min.

Isolated Areas Where Row Varies Wider Than 66 ft. To As Much As 120 ft.

Right Of Way (ROW)

Page 58: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Finalize Technical Memorandum No. 2 Existing Conditions

Complete Technical Memorandum No. 3 Project Scoping Alternatives

Stakeholder Advisory Committee Meeting No. 4 – early May, 2015

Public Informational Meeting No. 1 – mid-May 2015

Next Steps

Page 59: North Country Access Improvements Stakeholder Advisory ... · 6-15 crashes 16-25 crashes 26-35 crashes 35+ crashes HAL X X XX XX XX XX XX 13 3 0 . ... •Right-of-Way Infrastructure

Open Discussion