nordex - mvdpanelmvdpanel.net/adjuntostextos/cz47hroew7iqkp/688/marcoscardaci.pdf · 1 2.5 mw...
TRANSCRIPT
MONTEVIDEOJUN 2013
NORDEXAUDEE 2013 COMPANY PRESENTATION
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 2
4
3
Availability Track Record
The Nordex Efficiency Class
5
2 Financials and Bankability of Nordex WTG
Projects & Service, Training
1 Activities: Global / Americas
AGENDA
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 3
ACTIVITIES: GLOBAL / AMERICASNORDEX GROUP
INSTALLED BASE
By segment
MW Class (1.5-2.5 MW)
78%
Mid Size (0.75-1.49 MW)
12%
Small (< 0.75 MW)
10%
NORDEX GROUP: KEY FACTS
� Global manufacturer of wind energy turbines
with a focus on 2.5 MW class
� 28 years experience
� Global headquarters in Hamburg, Germany,
listed on the Frankfurt Stock Exchange
� Main production sites in Germany (Rostock),
USA (Jonesboro, AR)
� Extensive use of platform technology (same or
similar components across all WTG types)
� Variants for different wind and climate
conditions
� 2,536 employees as of 31 Dec 2012
� Total installations
in 39 countries
as of 15 Apr 2013
8,776 MW /
5,397 WTG
By region
Germany25%
Other EU56%
Asia11%
Americas7%
Africa1%
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 4
ACTIVITIES: GLOBAL / AMERICAS NORDEX LOCATIONS WORLDWIDE
GLOBAL PRODUCTION, SALES AND SERVICE NETWORK
Manchester
Chicago HamburgKolding, Uppsala
Rostock
Headquarters Production Sites Subsidiaries Countries with Nordex WTG installed
Barcelona, Porto
WarsawIstanbulRomaParis
Jonesboro Beijing
Manchester Dublin
Chicago HamburgKoldingUppsala
Rostock
Headquarters Production Sites Subsidiaries
Barcelona Porto
WarsawIstanbulRomeParis
Beijing
Jonesboro
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 5
ACTIVITIES: GLOBAL / AMERICAS TARGET MARKETS IN THE AMERICAS
Target Markets
� Participation at AWEA, Chilean + Uruguayan wind conferences
� Create service organization near contracted projects
� Contract local suppliers of installation, domestic transportation, and maintenance services
� First installation in target markets outside the US beginning in 2013 (Uruguay)
MW
Installed 1
MW under Construction 1
673 MW
26 MW
19.5 MW
Canada
Honduras
USA
Columbia
MW under Development 1
1,500 MW
Target Market Plans
Target Market Presence and Activity
Canada
Mexico
U.S.A.
Honduras
ChileUruguay
Puerto Rico
Costa Rica
Peru
Ecuador
Columbia
NX Americas Headquarters
NX Nacelle Assembly Plant
Potential
U.S.A.
Target 300 MW
1 as of Apr 2013
Uruguay 117 MW
Chile 70 MW
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 6
AGENDA
4
3
Availability Track Record
The Nordex Efficiency Class
5
2 Financials and Bankability of Nordex WTG
Projects & Service, Training
1 Activities: Global / Americas
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 7
24.99%
75.01%
Skion/momentum capital Free float
on the basis of 73,529,499 shares, as of 1 Sept 2011
FINANCIALS AND BANKABILITY OF NORDEX WTGNORDEX SE: SHAREHOLDER STRUCTURE
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 8
FINANCIALS AND BANKABILITY OF NORDEX WTGMANY OF THE LEADING COMPANIES CHOSE NORDEX …
Customer Country Selected Projects # WTG WTG Type MW
Netherlands Nerefco 9 N80/2500 23
USA Cedar Creek II 60 N90/2500 150
USA Highland I 25 N90/2500 62.5
USA Highland North 30 N100/2500 75
USA Roth Rock 20 N90/2500 50
USA Shirley 8 N100/2500 20
USA Elk 17 N100/2500 42.5
USA Hawkeye 20 N100/2500 50
USA Rippey 15 N100/2500 37.5
USA Beebe 34 N117/2400 81.6
USA Power County 18 N100/2500 45
France Boulay 12 N90/2500 30
France Erize Saint-Dizier 5 N90/2300 11.5
France Amélécourt 5 N90/2300 11.5
France St. Aubin II 5 N90/2300 11.5
France Courcelles 5 N90/2300 11.5
Romania Chirnogeni 32 N90/2500 80
France Germinon 30 N100/2500 75
United Kingdom Slieve Divena 12 N80/2500 30
United Kingdom Gruig 10 N80/2500 25
United Kingdom Bow Beat 24 N60/1300 31.2
Germany Ketzin 8 N90/2300 18.4
Germany Schortewitz 6 N90/2500 15
Germany Hoppenrade 5 N90/2500 12.5
Poland Lebcz 4 N80/2500 10
Poland Dolice 21 N90/2500 52.5
Ireland Kings Mountain 10 N80/2500 25
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 9
FINANCIALS AND BANKABILITY OF NORDEX WTG… AND CONTINUE TO DO SO
Customer Country Selected Projects # WTG WTG Type MW
Italy Minervino Murge 26 N90/2300 59.8
United Kingdom Kilbraur 19 N90/2500 47.5
United Kingdom Millennium 20 N90/2500 50
United Kingdom Earlsburn 15 N80/2500 37.5
Italy Fossa de Lupo 36 N90/2500 90
Italy Vicari 18 N90/2500 45
United Kingdom Little Cheyne Court 26 N90/2300 59.8
United Kingdom Bilbster 3 N60/1300 3.9
Italy Grighine 43 N90/2300 98.9
Italy Messina 21 N90/2300 48.3
Italy Energia Alternativa 25 S77/1500 37.5
Italy Cadau 14 S77/1500 21
Portugal Carreco 9 N90/2300 21
Portugal Vergao 10 N60/1300 13
Portugal Chamine 3 N90/2300 7
Norway Havoygavlen 15 N80/2500 37.5
Germany Niederrhein 8 S77/1500 12
Germany Roth 15 S77/1500 22.5
France Brachy 5 N90/2500 11.5
Canada Pincher Creek 20 N60/1300 26
South Africa Dorper 40 N100/2500 100
United Kingdom Crystal Rig 25 N80/2500 62.5
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 10
AGENDA
4
3
Availability Track Record
The Nordex Efficiency Class
5
2 Financials and Bankability of Nordex WTG
Projects & Service, Training
1 Activities: Global / Americas
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 11
THE NORDEX EFFICIENCY CLASSPRODUCT PORTFOLIO BUILT ON MORE THAN 8.7 GW OF INSTALLATIONS
Type MW IEC Wind Sound
Class* dB(A) 6.5 7.0 7.5 8.0 8.5 9.0 9.5 10.0
N80/2500 2.5 Ia 103.0 35.7 39.5 43.0 46.3
N90/2500 2.5 I & II 105.5 38.1 42.2 46.0 49.4 52.6
N100/2500 2.5 II & III 106.0 33.3 37.9 42.3 46.3 49.9 53.3
N117/2400 2.4 III 105.0 35.7 40.7 45.3 49.4 53.0
N100/3300 3.3 I 105.5 39.1 42.9 46.4 49.7
N117/3000 3.0 II 106.0 40.0 44.3 48.2 51.8 55.0
Net Capacity Factor** (%)
* IEC I: strong wind; IEC II: moderate wind; IEC III: light wind
** Assuming net losses of 13% (wake, electrical, icing, technical availability), standard air density of 1.225 kg/m3 and Weibul k=2.5; average wind speed at hub height
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 12
THE NORDEX EFFICIENCY CLASS FROM GENERATION GAMMA TO GENERATION DELTA
CURRENT
FUTURE
� High tower solutions of up to 141 meters: +50 meter tower height = +20.5% AEP
� Nordex “Anti-Icing System”: up to 25% increase in AEP achieved
By July 2014 By July 2014
CURRENT
2014
Current Product Portfolio 2012/2013
Portfolio Additions from 2014
22%
AEP
22%
AEP
N100/3300 N117/3000
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 13
N117/2400:annual energy yield
+16%
+ 21%Higher yield due to greater hub heights
Topographical obstacles, such as trees, may
result in lower yields. At higher hub heights,
the wind quality is better.
91m (6.5m/s)
120m (7.16m/s)
141m (7.41m/s)
THE NORDEX EFFICIENCY CLASS FLEXIBLE TOWER HEIGHTS ARE KEY TO SUCCESS
Tubular Steel Tower
Steel Tower
Hybrid Tower
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 14
AGENDA
4
3
Availability Track Record
The Nordex Efficiency Class
5
2 Financials and Bankability of Nordex WTG
Projects & Service, Training
1 Activities: Global / Americas
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 15
1 2.5 MW installations globally with Nordex Availability Warranty; total installed base comprises 2,022 WTG as of 31 Dec 2012
2.5 MW GLOBAL AVAILABILITY
2.5 MW US AVAILABILITY
1 Jan 2010 - 31 Dec 2010 # all WTG: 25 Ø Availability: 97.09%
1 Jul 2010 - 30 Jun 2011 # all WTG: 1,340 Ø Availability: 97.33%
1 Jul 2010 - 30 Jun 2011 # all WTG: 33 Ø Availability: 97.03%
1 Jan 2011 - 31 Dec 2011 # all WTG: 113 Ø Availability: 97.75%
1 Jan 2011 - 31 Dec 2011 # all WTG: 1,447 Ø Availability: 97.54%
1 Jul 2011 - 30 Jun 2012 # all WTG: 1,746 Ø Availability: 97.70%
1 Jul 2011 - 30 Jun 2012 # all WTG: 178 Ø Availability: 98.44%
AVAILABILITY TRACK RECORDWORLDWIDE AND USA AVAILABILITY
1 Jan 2012 - 31 Dec 2012 # all WTG1: 1,868 Ø Availability: 98.09%
1 Jan 2012 - 31 Dec 2012 # all WTG2: 225 Ø Availability: 98.56%
2 total installed base in the United States comprises 270 WTG as of 31 Dec 2012
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 16
AGENDA
4
3
Availability Track Record
The Nordex Efficiency Class
5
2 Financials and Bankability of Nordex WTG
Projects, Service & Training
1 Activities: Global / Americas
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 17
PROJECTS, SERVICE & TRAININGSERVICE CONTRACT OPTIONS AT A GLANCE
Full service scope and repair contracts are available for 3, 5, 10 years or even longer terms.
Services* Contract PackagesPremium Extended Basic
Consulting & Support by Nordex Field Operations + Account Manager
24-hour Remote Monitoring including 24-hour Access and Remote Diagnostics
Scheduled Maintenance & Inspection including Consumables and Reporting
Unscheduled Maintenance Interventions at the Site (upon WTG controller alarms, etc.)
Availability Warranty including Reporting
Repair Work (labor) including fault diagnosis, excluding major WTG components (if removal for repair required)
Repair Work (labor) for major component repairs, if removal for repairs required
Spare Parts Supply excluding major components
Spare Parts Supply for major components of WTG
Condition Monitoring including Analysis and Reporting
Inspection of Protective Equipment (PSE & WTG safety equipment)
Individual Training for operators, operations managers & technicians
Modernization & Upgrades (individual modifications, large-scale modernization measures & upgrade packages for component retrofitting)
*The services in each service package can also be ordered individually, outside the contract packages.
Contracted Service Scope
Optional Contracted Service Scope
Additional Service Scope (separate order)
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 18
PROJECTS, SERVICE & TRAININGMATERIALS MANAGEMENT & PARTS LOGISTICS
� Central depot for turbine components including large-scale items for all turbine types in Jonesboro, Arkansas and Rostock, Germany
� Electronic, web-based information system ensures spare parts are in stock
� Worldwide dispatch of spare parts 365 days/year
� Delivery to project site of most parts within 24 h
MATERIALS MANAGEMENT & PARTS LOGISTICS
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 19
PROJECTS, SERVICE & TRAININGTRAINING FACILITIES AND SCOPE
� State-of-the-art equipment and training
resources
� Various Nordex-specific WTG components for
hands-on maintenance and troubleshooting
for field technicians
� Complete set of required training tools
� High tower rescue training with platform
available in workshop area
� Wind Technician I Program: 3-week program
to provide technicians with necessary skills
for turbine maintenance
� Wind Technician II Program: 5-week program
to provide technicians with necessary skills to
assist in WTG commissioning process
TRAINING FACILITIES AND SCOPE
Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 20
NORDEX SALES CONTACTS
Americas
Nordex USA, Inc.300 South Wacker Drive, Suite 1500Chicago, Illinois 60606, USA
phone: +1 (312) 386-4100fax: +1 (312) 386-4101email: [email protected]
EMEA
Nordex Energy GmbHLangenhorner Chaussee 60022419 Hamburg, Germany
phone: +49 (40) 30030-1100fax: +49 (40) 30030-1101email: [email protected]
Asia-Pacific
Nordex (Beijing) WP Co. Ltd.First Shanghai Center39, Liangmaqiao Road, Chaoyang District100016 Beijing, P. R. China
phone: +86 (10) 84535188fax: +86 (10) 84535158email: [email protected]