NOISE AND VIBRATION MANAGEMENT PLAN Project Details Project Name: Chau Chak Wing Museum Project Number: 250048 Project Location: Camperdown Campus, University of Sydney Client: University of Sydney Project Manager: Senior Project Manager: Branko Mihaljevic Date work is to commence (approx.) 15/04/2018 Estimated duration of work: 23 months Name of principal contractor: FDC Construction (NSW) Pty Ltd Company address: 22 - 24 Junction Street Forest Lodge NSW 2037 ABN: 72 608 609 427 Approvals Project Manager: Signature: Date: Senior Project Manager: Signature: Date: Project Director Signature: Date: General Manager: Signature: Date: Divisional IMS Manager: Signature: Date: Distribution: Client, Project Manager, Site Manager, Subcontractors Management Plan Revision: C

Upload: others

Post on 14-Jun-2020

42 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

NOISE AND VIBRATION MANAGEMENT PLAN

Project Details

Project Name: Chau Chak Wing Museum

Project Number: 250048

Project Location: Camperdown Campus, University of Sydney

Client: University of Sydney

Project Manager:

Senior Project Manager: Branko Mihaljevic

Date work is to commence (approx.) 15/04/2018

Estimated duration of work: 23 months

Name of principal contractor: FDC Construction (NSW) Pty Ltd

Company address: 22 - 24 Junction Street Forest Lodge NSW 2037

ABN: 72 608 609 427

Approvals

Project Manager: Signature: Date:

Senior Project Manager: Signature: Date:

Project Director Signature: Date:

General Manager: Signature: Date:

Divisional IMS Manager: Signature: Date:

Distribution: Client, Project Manager, Site Manager, Subcontractors

Management Plan Revision: C

Page 2: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Project: Chau Chak Wing Museum 250048 Revision Date: 09/04/2018 Revised 09/04/2017 Page 2 of 14

Rev Date REVISION DESCRIPTION

PM‘s INITIALS

(acceptance of changes)

17/05/2018 A – For Approval

21/05/2018 B – Update as per Group DLA comments

10/07/2018 C – Update as per environmental audit comments

Page 3: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

CONSTRUCTION NOISE AND VIBRATION MANAGEMENT PLAN

PROPOSED CHAU CHAK WING MUSEUM PART OF THE UNIVERSITY OF SYDNEY

CAMPERDOWN NSW 2050

FDC Construction (NSW) Pty Ltd

22-24 Junction Street, Forest Lodge NSW 2037

MONITORING PERIOD 01st – 07th May 2018

CONTRACT NO. C18 7845 REPORT NO. EMS18 5803 R2

Page 4: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 2 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

TABLE OF CONTENTS

1 INTRODUCTION ........................................................................................................................................ 4

1.1 Project Description .............................................................................................................................................................. 4

1.2 Site Location and Noise Receivers ........................................................................................................................................ 4

2 NOISE MONITORING ................................................................................................................................ 6

2.1 Background Noise Measurement ......................................................................................................................................... 6

3 MONITORING RESULTS ............................................................................................................................ 6

3.1 Background Noise Results .................................................................................................................................................... 6

4 RELEVANT CRITERIA ................................................................................................................................. 7

4.1 Noise Criteria ....................................................................................................................................................................... 7

4.2 Vibration Criteria ............................................................................................................................................................... 10

i) Structural Damage Criteria................................................................................................................................................. 10

ii) Human Comfort Criteria..................................................................................................................................................... 11

5 PREDICTED NOISE LEVELS .......................................................................................................................12

5.1 Construction Noise Sources ............................................................................................................................................... 12

5.2 Construction Noise Impact Prediction ................................................................................................................................ 14

6 NOISE CONTROL ......................................................................................................................................19

6.1 Construction Hours ............................................................................................................................................................ 19

6.2 Best Management Practice (BMP) Noise Control ............................................................................................................... 19

6.3 Best Available Technology Economically Achievable (BATEA) Noise Control ...................................................................... 20

6.4 Acoustic Screens ................................................................................................................................................................ 20

6.5 Vibration Mitigation Control .............................................................................................................................................. 21

6.6 Noise and Vibration Monitoring......................................................................................................................................... 22

6.7 Noise Monitoring Report ................................................................................................................................................... 22

6.8 Complaint Management .................................................................................................................................................... 23

7 CONCLUSIONS .........................................................................................................................................25

Page 5: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 3 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

PREPARED FOR: PREPARED BY:

FDC Construction (NSW) Pty Ltd Environmental Monitoring Services Pty Ltd

22-24 Junction Street Forest Lodge NSW 2037

First Floor, 935 Botany Road Mascot NSW 2020

Name: Tom Barwise ABN 13 050 039 177

Phone: 0412 169 708 Phone No: (02) 9317 0100

Email: [email protected] Fax No: (02) 9317 0122

AUTHOR:

Sean Hook MSc (Audio and Acoustics)

Acoustic Consultant

Date: 02.07.2018

CHECKED BY: Edward Krasilovsky BEng (Mechanical)

Engineer

Date: 03.07.2018

APPROVED FOR RELEASE BY:

Mark Wagner Director

Date: 03.07.2018

DISCLAIMER

This report is valid only in its entire form. Unauthorised reproduction or copying is strictly prohibited. Environmental Monitoring Services have prepared this document and information herein specifically for the purposes of the client in accordance with general professional consulting standards. The findings of this document apply specifically to this project only and are based partially on advice provided by the client. The scope of works was conducted in accordance with the scope of the project brief only. The document may not contain sufficient information other than for the purposes of the client, and no other warranty is made as to the professional advice in this report.

DOCUMENT CONTROL COPY No: 1 REVISION HISTORY

Revision No Date Issued Reason/ Comments

2 03.07.2018 Noise monitoring management strategy description added.

DISTRIBUTION

Copy No Revision No Destination

1 2 FDC Construction (NSW) Pty Ltd

1 2 Environmental Monitoring Services Pty Ltd

Page 6: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 4 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

1 Introduction 1.1 Project Description EMS was commissioned by FDC Construction (NSW) Pty Ltd to provide a Construction Noise and Vibration Management Plan prior to the project development works at the University of Sydney, Camperdown NSW (the site). The project comprises the demolition of the existing tennis courts and the construction of a museum building equivalent to three levels above ground and four basement levels. The purpose of this plan is to provide procedures to prevent excessive noise and vibration being emitted from onsite demolition, excavation and construction works which may cause unreasonable loss of amenity to nearby receivers. This report will include noise impact predictions based on the sound power level of the proposed onsite equipment for the project and their distance to nearby noise receivers. The purpose of these predictions is to serve as a guideline in preparing the suitable noise and vibration controls needed for the project. The Noise criteria will be established under the guidance of the EPA’s publication ‘Interim Construction Noise guideline’ and the vibration criteria will be adopted from the EPA’s publication ‘Assessing Vibration: a technical guideline’. Other relevant noise and vibration standards will also be presented in this report. 1.2 Site Location and Noise Receivers The site is located within the grounds of the University of Sydney around the area of tennis courts formerly known as the Women’s Tennis Courts. The rectangular shaped site is bounded by University Avenue to the east and south, Parramatta Road to the north and University Place to the west The site has (UoS) educational receivers to the south and west. South east of the site is the recreational receiver Victoria Park Pool. To the north of the site, across Parramatta Road, along Arundel Street are residential receivers generally 1 to 2 storeys high and the Urban Nest accommodation being 3 storeys high. To the north-east of the site is the educational receiver Glebe Public School, a religious receiver and mixed-use developments, many having a commercial ground floor with residential above.

Receiver Address Description

University of Sydney Library – Fisher Library

City Road, Camperdown Victoria Park Pool – Recreational Centre

3 Arundel Street, Glebe Two storey residential dwelling

295 Broadway, Glebe Religious receiver

9-25 Derwent St, Glebe Glebe Public School

285 Broadway, Glebe Multi-storey mixed-use receiver- ground

floor commercial and upper levels residential

Figure 1.1 on the following page outlines the site’s location and the nearby noise receivers.

Page 7: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 5 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Figure 1.1 – Map

Map Source: SIX Maps

Legends Proposed Site (Chau Chak Wing Museum) Noise Monitor Location

… Noise Receiver Locations

Educational Receivers Recreational Receiver Residential Receivers Religious Receiver Mixed Use Receivers

Site Address: Part of The University of Sydney, Camperdown NSW Contract No.: C18 7845 Report No.: EMS18 5803 R2

3

Page 8: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 6 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

2 Noise Monitoring

2.1 Background Noise Measurement Unattended noise monitoring was conducted between the 1st of 7th of May 2018, using the ARL EL-215 Noise Logger, to establish the Rating Background Level (RBL) for the immediate area surrounding the site. The unit was field calibrated prior to and after monitoring, and no significant drift was found. The noise logger was set to record ‘A’ weighted statistical sound pressure levels (SPL) with 15-minute intervals using a ‘fast response’. The noise logger was installed at a residential address on the front porch facing and Arundel Street and Parramatta Road with the noise logger’s microphone approximately 1.3 metres from the porch. The LA90 15 minute will be used to determine the Rating Background Level for the site and for the establishment of a relevant noise criterion. This statistical measurement LA90 is the sound pressure level measurement that is exceeded for 90% of the measurement period. The noise logger also collected the LAeq; this represents the level of noise equivalent to the energy average of noise levels occurring over a measurement period. The LA10 was also obtained; this is the sound pressure level that is exceeded for 10% of the measurement period.

3 Monitoring Results 3.1 Background Noise Results Table 3.1 outlines the LA90 background noise measurement results collected from the front porch of 3 Arundel St. No rainfall fell during the monitoring period as determined by Bureau of Meteorology (BOM) – Observatory Hill weather station. Table 3.1 – LA90 Background Noise Measurement and Rating Background Level – Part of The University of Sydney

01 May

02 May

03 May

04 May

05 May

06 May

07 May RBL

Day LA90

- 54.5 54.5 55.7 54 52.5 54.5 55

Evening LA90

52.5 53 52.5 54 53.5 52.3 52.3 53

Night LA90

41.8 42.8 42.3 47.5 46 40.3 42.8 43

Page 9: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 7 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

4 Relevant Criteria 4.1 Noise Criteria

The Development Consent (Application No. SSD 7894) gives the following construction noise criteria:

Page 10: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 8 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

EPA’s Interim Construction Noise Guideline The Noise Criteria will be in compliance with the EPA’s Interim Construction Noise Guideline, regulated by the OEH and is aimed to manage noise from construction work. The main objectives of the guidelines are:

• To protect the majority of residences and other sensitive land uses from noise pollution most of the time;

• Identify and minimise noise from construction works;

• Applying ‘feasible’ and ‘reasonable’ work practices to minimise construction noise; and

• Encouraging construction to be undertaken only during least sensitive noise periods.

Table 4.1 outlines the internal and external noise criteria for sensitive land use properties. Table 4.2 on the following page outlines the noise criteria for commercial and industrial premises. Table 4.3, further down, outlines the external Noise Criteria for the residential properties near the construction site. This information is applied to the Rating Background Level gathered during the noise monitoring period. Table 4.1 – Noise Criteria at Sensitive Land Use

Land Use Noise Management Level

LAeq(15 minute)

Classrooms at schools and other educational institutions Internal Noise Level 45 dB(A)

External Noise Level 65 dB(A)*

Hospital wards and operating theatres Internal Noise Level 45 dB(A)

External Noise Level 65 dB(A)*

Place of Worship Internal Noise Level 45 dB(A)

External Noise Level 65 dB(A)*

Active recreation areas (characterised by sporting activities which generate their own noise or focus for participants, making them less sensitive to external noise intrusion)

External Noise Level 65dB (A)

Passive recreation area (characterised by contemplative activities that generate little noise and where benefits are compromised by external noise intrusion, for example, reading, meditation etc.)

External Noise Level 60dB (A)

* EMS assumes a noise reduction of 20 dB(A) across the closed façade for educational institutions, hospitals and religious receivers.

Commercial and industrial premises Due to the broad range of sensitivities that commercial or industrial land can have to noise from construction, the process of defining management levels is separated into three categories. The external noise levels should be assessed at the most-affected occupied point of the premises: Table 4.2 – Noise Criteria at Commercial Premises

Land Use Noise Management Level LAeq(15 minute)

Industrial premises External Noise Level 75dB (A)

Offices, retail outlets External Noise Level 70dB (A)

Other businesses that may be very sensitive to noise. Where the noise level is project specific the proponent should undertake a special investigation to determine suitable noise levels on a project-by-project basis; the recommended ‘maximum’ internal noise levels in AS 2107 Acoustics – Recommended design sound levels and reverberation times for building interiors may assist in determining relevant noise levels.

Page 11: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 9 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Table 4.3 – Applicable Noise Criteria – Residents surrounding work site

Residential Premises

Time of Day Management Level LAeq, 15 mins

How to Apply

Recommended Standard Hours:

Monday to Friday 7:00 am to 6:00 pm

Saturday 7:30 am to 3:30 pm

No work on Sundays or public holidays

Noise Affected

RBL + 10 dB

Based on monitored levels, project specific management level is

Day: 07:00 – 18:00

65 dB(A)

The noise affected level represents the point above which there may be some community reaction to noise.

1. Where the predicted or measured LAeq (15 min) is greater than the noise affected level, the proponent should apply all feasible and reasonable work practices to meet the noise affected level.

2. The proponent should also inform all potentially impacted residents of the nature of works to be carried out, the expected noise levels and duration, as well as contact details.

Highly Noise Affected

75 dB(A)

The highly noise affected level represents the point above which there may be strong community reaction to noise.

Where noise is above this level, the relevant authority (consent, determining or regulatory) may require respite periods by restricting the hours that the very noisy activities can occur, taking into account:

1. Times identified by the community when they are less sensitive to noise (such as before and after school for works near schools, or mid-morning or mid-afternoon for works near residences

2. If the community is prepared to accept a longer period of construction in exchange for restrictions on construction times.

Outside recommended

standard hours:

Noise Affected RBL + 5dB

Evening: 18:00 – 22:00 58 dB(A)

Night: 22:00 – 07:00

48 dB(A)

• A strong justification would typically be required for works outside the recommended standard hours

• The proponent should apply all feasible and reasonable work practices to meet the noise affected level.

• Where all feasible and reasonable practices have been applied and noise is more than 5dB (A) above the noise affected level, the proponent should negotiate with the community.

Page 12: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 10 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

4.2 Vibration Criteria

The effects of vibration can be divided into concerns over structural damage and human annoyance. This section will outline the relevant vibration criteria for the two concerns as requested in the Development Consent (Application No. SSD 7894), below:

i) Structural Damage Criteria

A Geotechnical Investigation report was prepared for the site in October 2016 by Douglas Partners. The Geotechnical Investigation report (ref: 85385.01) states “Normally, it is suggested that vibrations be provisionally limited to a peak particle velocity (PPV) of 8 mm/s at the foundation level of the buildings to protect the architectural features of the building and to reduce discomfort for the occupants. As there are no significant buildings nearby, vibration control for buildings is not expected to be an issue for the site.” In accordance with the Development Consent, EMS implements the structural damage criteria as outlined in the German Standard DIN 4150-3 (Structural Vibration: Effects of Vibration on Structures) for the both the nearest residential receivers across Parramatta Road and for the surrounding on-campus buildings, namely the heritage-listed Quadrangle and Fisher Library. Table 4.4 below gives a guideline value for short term vibration velocity at the foundation. Short term vibration is classified as vibrations which do not occur often enough to cause structural fatigue.

Table 4.4 - Structural Damage – Short Term Vibration (mm/s)

Type of Structure Velocity values in mm/s at the foundation at a frequency of

Plane of floor of uppermost

storey

Less than 10Hz 10-50Hz 50-100Hz All frequencies

Building use for commercial purposes, industrial buildings and

buildings of similar design 20 20-40 40-50 40

Dwelling and buildings of similar design and/or occupancy

5 5-15 15-20 15

Structures that because of their particular sensitivity to vibration

and are of great intrinsic value (e.g. heritage listed structures )

3 3-8 8-10 8

Page 13: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 11 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Figure 4.1

ii) Human Comfort Criteria The human annoyance vibration assessment should be undertaken using the EPA’s publication ‘Assessing Vibration: a technical Guideline’, based on the BS 6472 Standard. This Guideline covers the appropriate methods and criteria for the assessment of the intrusive vibration on living and working space. The guideline describes the following:

• The characteristics of vibration and associated effects that can cause community disturbance and concern to people, in particular the occupants of buildings.

• Criteria defining values of vibration to protect amenity.

• Procedures for the measurement and evaluation of vibration values and other associated emissions. A summary of the VDV criteria for human comfort limits are adopted from the EPA’s publication ‘Assessing Vibration: a technical Guideline and are presented in Table 4.5 below.

0

10

20

30

40

50

60

0 10 20 30 40 50 60 70 80 90 100

Co

pm

po

nen

t P

eak

Vel

oci

ty, m

m/s

Frequency, in Hz

Based on the German Standard DIN 4150-3

Heritage

Residential

Commercial

Page 14: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 12 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Table 4.5 - Acceptable vibration dose values for intermittent vibration (m/s1.75)

Location

Daytime Night Time

Preferred Value

Maximum Value Preferred Value Maximum Value

Critical Areas 0.10 0.20 0.10 0.20

Residents 0.20 0.40 0.13 0.26

Offices, Schools, Educational, institutions

and places of worship 0.40 0.80 0.40 0.80

Workshops 0.80 1.60 0.80 1.60

5 Predicted Noise Levels 5.1 Construction Noise Sources This section will outline the proposed noise sources found in each phase of works on site and outlines the sound power level from each noise source. The Sound Power levels for each noise source were adopted from the Australian Standard 2436-2050 (R2016) – Guide to Noise Control on Construction, maintenance and Demolition sites, British Standard BS 5228.1 – Code of Practice for noise and vibration control on construction and open sites – Part 1: Noise or EMS collection of sound power levels (all in dB(A) re: 10-12 W). The construction phases and works on site are shown below.

Excavation

The noisy equipment used during this stage of works is expected to be:

• Rock Saw

• 30 Tonne Excavator w/Hammer

• 50 Tonne Excavator

• Dump Truck

Piling

The noisy equipment used during this stage of works is expected to be:

• Auger Piling Rig

• Trucks

Page 15: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 13 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Substructure

The noisy equipment used during these stages of works is expected to be:

• Angle Grinders

• Concrete Pump Truck

• Electric/Battery Hand Tools

• Trowel (Helicopter)

• Trucks

Structure

The noisy equipment used during these stages of works is expected to be:

• Angle Grinders

• Drop Saw

• Circular Saw

• Hammer Drills

• Concrete Pump Truck

• Trucks

Façade and Roofing

The noisy equipment used during this stage of works is expected to be:

• Electric/Battery Hand Tools

• Angle Grinders

• Drop Saw

• Trucks

Landscaping

The noisy equipment used during this stage of works is expected to be:

• Electric/Battery Hand Tools

• 8 Tonne Excavator

• 13 Tonne Excavator

• Vehicle (light commercial e.g. 4WD)

Page 16: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 14 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Table 5.1 – Typical Noise Sources and their Sound Power Levels

Construction Equipment List

Noise Source Sound Power Level dB(A)

Vehicle (light commercial e.g. 4WD) 106

Auger Piling Rig 111

Rock Saw 100

5T Excavator 97

13T Excavator 104

30T Excavator 110

50T Excavator 117

Excavator w/Hammer 118

Circular Saw 104

Mitre (Drop) Saw 111

Concrete Trucks 109

Trowel (Helicopter) 105

Concrete Pump Truck 108

Dump Truck 117

Trucks (>20 tonne) 107

Angle Grinder 101

Electric/battery hand tools 102

Jack hammer 115

Hammer drill 110

5.2 Construction Noise Impact Prediction

These impact noise predictions are all conducted on the “worst case” assumption with all the noise sources from each construction phase occurring simultaneously over a 15-minute period and with the majority of source operating continuously over the 15-minute period (except for the dump truck noise emissions). The noise calculations were carried out in the Acoustic Software SoundPLAN (version 8.0) with the noise sources placed towards the centre of the site, except for the landscaping construction stage. As some of the site phases may overlap, there may be slightly elevated levels should the most intense works occur simultaneously. EMS notes that the average LAeq noise level, averaged over a standard construction day, would likely be lower than the levels seen in Tables 5.2 – 5.6 as works would not likely be continuous throughout the day. A façade correction of 2.5 dB(A) was applied to the residential receiver R3. An absorptive ground surface was applied for the surroundings of noise receivers R1 and R2 and a reflective ground surface was applied to the surroundings of the receivers R3 – R6.

Page 17: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 15 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

The residential properties, across Parramatta Road, to the north of the site are likely to be affected by noise levels that are, at times, above the Noise Management Level of 65 dB(A) during the excavation stage and structure stage, as seen in Table 5.4 below. The construction phase with the highest noise prediction is the excavation stage with the assumption that excavator hammering will be undertaken. The noise predictions also showed exceedances during the excavation stage at the UoS Fisher Library educational receiver. In order to lower the site’s noise emissions, particularly during excavation and structure phases, an acoustic barrier may be installed along the northern and southern borders of the site. However, a barrier will only reduce the predicted noise levels at receiver locations where the barrier blocks the line of site between the noise source and receiver. Due to the height of the proposed development and the height of the southern Fisher Library noise receivers, a noise barrier won’t be feasible for all the surrounding receivers as it would have to be significantly tall to provide a significant insertion loss. Section 6.4 describes the noise reduction that can be expected by acoustic barriers. Mounds of earth can also work as a barrier when plant items are located directly behind them. Due to the different phases of works and the proximity of the site to the surrounding residential receivers, the high intensity work phases (excavation and structure) are expected at times to generate noise levels that exceed the Noise Management Level of 65 dB(A) for northern residential premises and further mitigation measures would need to be explored and employed if complaints arise. Therefore, it is recommended that noise controls be implemented, especially for the residential and educational (University of Sydney) receivers surrounding the site work area. Tables 5.2 to 5.7 outline the noise impact prediction corresponding to the measured distance of the nearby receiver locations as displayed in Figure 1.1. Section 6 provides noise mitigation strategies for this project.

Page 18: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 16 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Table 5.2 – Predicted Noise Level at the Educational Receiver (UoS - Fisher Library) Location

Construction Stage

Predicted Noise Level dB

LAeq(15minute)

(Worst-case)

Noise Management

Level dB

LAeq(15minute)

Comments

Excavation 69.1

65

Some reaction may be expected during the

excavation stage. Implement feasible

and reasonable noise

control measures.

Piling 61

Substructure 61.5

Structure 64.6

Façade and Roofing 62

Landscaping 56.2

Table 5.3 – Predicted Noise Level at the Recreational Receivers (Victoria Park Pool) Location

Construction Stage

Predicted Noise Level dB

LAeq(15minute)

(Worst-case)

Noise Management

Level dB

LAeq(15minute)

Comments

Excavation 64.8

65 Compliant with the

noise criteria for recreational receivers

Piling 57.1

Substructure 57.3

Structure 59.8

Façade and Roofing 58.4

Landscaping 54.3

Page 19: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 17 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Table 5.4 – Predicted Noise Level at the Residential Receivers (3 Arundel St, Glebe) Location

Construction Stage

Predicted Noise Level dB

LAeq(15minute)

(Worst-case)

Noise Management

Level dB

LAeq(15minute)

Comments

Excavation 73.3

65

Some community reaction may be

expected during the stages when the Noise Management Level is

exceeded. Implement feasible and

reasonable noise

control measures.

Piling 64.7

Substructure 65

Structure 67.9

Façade and Roofing 65.2

Landscaping 59.4

Table 5.5 – Predicted Noise Level at the Religious Receiver (295 Broadway, Glebe) Location

Construction Stage

Predicted Noise Level dB

LAeq(15minute)

(Worst-case)

Noise Management

Level dB

LAeq(15minute)

Comments

Excavation 64.1

65 Compliant with the

noise criteria for religious receivers

Piling 56.5

Substructure 56.8

Structure 59.6

Façade and Roofing 58.2

Landscaping 53.8

Page 20: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 18 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Table 5.6 – Predicted Noise Level at the Educational Receiver (Glebe Public School) Location

Construction Stage

Predicted Noise Level dB

LAeq(15minute)

(Worst-case)

Noise Management

Level dB

LAeq(15minute)

Comments

Excavation 64

65 Compliant with the

noise criteria for educational buildings

Piling 54.3

Substructure 54.6

Structure 59

Façade and Roofing 53.2

Landscaping 44.3

Table 5.7 – Predicted Noise Level at the Mixed-Use Receiver (285 Broadway, Glebe) Location

Construction Stage

Predicted Noise Level dB

LAeq(15minute)

(Worst-case)

Noise Management

Level dB

LAeq(15minute)

Comments

Excavation 62

70 (for commercial)

65 (for residential)

Compliant with the commercial and residential noise

criteria

Piling 54.6

Substructure 54.6

Structure 57.4

Façade and Roofing 55.7

Landscaping 51.2

Page 21: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 19 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

6 Noise Control The following noise mitigation plan outlined in Sections 6.1 to 6.7 shall be implemented to reduce noise levels from the project.

6.1 Construction Hours

The construction hours outlined in the Development Consent (Application No. SSD 7894) are outline below:

6.2 Best Management Practice (BMP) Noise Control Best Management Practice (BMP) is the adoption of particular operational procedures that minimise noise while retaining productive efficiency. The majority of the proposed noise mitigation recommendations will be adopted from the Interim Construction Noise Guideline and the Australian Standard AS 2436:2010 - Guide to Noise Control on Construction, Maintenance and Demolition Sites. The excavation and the construction phase of work should implement the following noise mitigation strategies:

• Implementing quiet work practices – Using equipment in ways to minimise noise, this includes reducing throttle setting and turning off equipment when not being used, i.e. trucks and saws.

• Distance – Provide as much distance from the noise source to the receivers as possible. Stationary machinery, especially, should be located at the south-eastern border of the site.

• Maintain equipment – Regularly inspect and maintain equipment to ensure it is in good working order. Also check the conditions of mufflers and keep the cutting saw sharp.

Page 22: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 20 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

• Scheduling – Sensitive residential and educational receivers surround the site, therefore further time restrictions for intense work such as the rock breaking, drop sawing and hammer drilling works etc. could be utilised. See Section 6.1 for the scheduling given by City of Sydney for noisy activities.

• Limiting – Reduce the amount of machines or tools operating simultaneously near the receivers’ location.

6.3 Best Available Technology Economically Achievable (BATEA) Noise Control BATEA is a noise mitigation strategy based on equipment, plant and machinery modification to minimise noise output. The following BATEA strategies are to be implemented:

• Substituting quieter equipment – examining different types of machinery that perform the same function and compare the noise level data to select the least noisy machine, examination includes tyre noise, exhaust and compressor/fan noise. For example, rubber wheeled tractors can be less noisy than steel tracked tractors.

• Adjusting reversing alarms on heavy equipment to make them ‘smarter’ by limiting the acoustic range to the immediate danger area or a broadband style alarm sometimes referred to as a ‘quacker’ alarm (See C10. from the Development Consent (Application No. SSD 7894)) .

• High Performance Exhaust Mufflers could be fitted to the 30 and 50-tonne excavators working within the site. Silencers/mufflers are likely to reduce noise emission from 5 to 15dB.

• Pneumatic equipment is traditionally a problem – select silenced damped bits where possible.

6.4 Acoustic Screens

Acoustic screens or barriers can be an effective way to reduce noise emissions from the site. Barriers can be installed at either the location of the noise source or the location of the noise receiver. The reduction provided by the acoustic screen is determined by how much of the line of sight between the source and receiver is blocked. If the noise source is fully shielded a noise reduction of up to 15 dB(A) can be achieved. When the line of sight is only partially blocked the noise reduction can be up to 5-8 dB(A). Acoustic screens are more effective for stationary plant. EMS recommends material such as plywood (radiata plywood) of thickness 10mm or 15mm

The barrier should have the following properties:

• Material having at least 10 kg/m2 surface density.

• There should be no gaps or openings at joints in the barrier material.

Page 23: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 21 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

6.5 Vibration Mitigation Control

Works that are anticipated to cause elevated vibration levels are hydraulic hammering from the excavator and a small amount of compaction rolling. However, vibrations generated from the site will experience significant attenuation due to the distance between the site and nearest receiver buildings. Vibration controls will not be an issue concerning the structural damage to the Sydney University buildings to the south and west of the site and the residential buildings across Parramatta Road. It should be noted that vibrations that are below threshold levels for structural damage may be experienced by pedestrians walking nearby, causing annoyance. When the phases of works which cause higher vibration levels are underway, further mitigation measures may need to be explored and employed should levels increase to such a point that complaints arise due to annoyance. The following practices should be implemented to reduce any potential vibrations affecting the surrounding structures:

• Place as much distance as possible between the excavation work and the surrounding pedestrians/properties. Distance is one of the most effective mitigation measures against vibration.

• Organise high impacting operations so as not to occur in the same time period.

• Conduct lower impact methods wherever possible, including the following:

• Orientation of the rock hammer away from property boundaries and into open excavation; and

• Operate excavator hammering in short bursts only, to reduce amplification of vibrations and the rise of noise.

Table 6.1 below shows safe working distances for the onsite plant.

Table 6.1 - Recommended Safe Working Distances for Vibration Intensive Plant

Plant Item Rating Description

Safe working Distances

Cosmetic Damage

(BS7385)

Human Response

(EPA Vibration Guideline)

Vibratory Roller

< 50 kN (Typically 1-2T) 5m 15-20

< 100 kN (Typically 2-4T) 6m 20

< 200 kN (Typically 4-6T) 12m 40

< 300 kN (Typically 7-13T) 15m 100

> 300 kN (Typically 13-18T) 20m 100

> 300 kN (> 18T) 25m 100

Small Hydraulic Hammer 300kg – 5 to 12T Excavator 2 m 7 m

Medium Hydraulic Hammer 900kg – 12 to 18T Excavator 7 m 23 m

Large Hydraulic Hammer 1600kg – 18 to 34T Excavator 22 m 73 m

Pile Boring ≤ 800mm 2m N/A

Page 24: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 22 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

6.6 Noise and Vibration Monitoring Due to the nearby residential noise sensitive receivers, we recommend unattended noise monitoring be undertaken at a nearby residential receiver either continuously throughout the project or during the first week of the excavation, substructure and structure stages to ensure noise levels are not excessive. Attended short term noise measurements may also be taken during the various stages, to ensure noise levels are complying with the noise criterion. Noise monitoring during high construction activities and/or after a complaint should be undertaken to monitor the noise impact at the affected receiver. Vibration monitoring is not required at the University of Sydney buildings surrounding the site nor the residential buildings across Parramatta Road due to the distance between site and the aforementioned buildings. Vibration monitoring should be undertaken adjacent to the pedestrian walkways surrounding the site should complaints arise. 6.7 Noise Monitoring Report The noise monitoring report will state the methodology of monitoring and display the established noise criteria. The noise monitoring results will show the measured daily average and peak construction noise levels (LAeq) in table form. In the Appendix there will be a noise graph displaying the 15-minute LAeq noise measurements over the entire monitoring period and all of these will be compared against the noise criterion. The table and graph of the noise results will be similar to that shown below and the report will contain a discussion of the results.

Table 6.2 – Sample Noise levels from noise monitoring.

Date Extrapolated

Average Noise Level (LAeq, daytime)

Peak Noise Level (LAeq, 15 minute)

Noise Criteria

(LAeq, 15 minute)

14/06/2018 68.7 71.5 65 dB

15/06/2018 68.0 70.5 65 dB

16/06/2018 68.1 77.5 65 dB

17/06/2018 65.1 69.0 65 dB

18/06/2018 69.1 72.0 65 dB

19/06/2018 69.9 71.5 65 dB

20/06/2018 68.4 72.0 65 dB

Page 25: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 23 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Figure 6.1 – Sample Noise Graph (24 hour LAeq measurement at 15 minute intervals)

6.8 Complaint Management It is also important to interact with the nearby receivers and the community to ensure a good working relationship between the proponent and the community receive feedback on the project’s performance and work cooperatively towards the outcomes of benefit to the project. Table 6.2 gives a guideline approach to community consultation, notification and complaint handling. This guide is adopted from the Interim Construction Noise guideline and only some items are suitable for this project and provide measures such as letter box drops, project specific respite offer, phone calls and specific notification. Communication shall be upheld between the surrounding residential receivers, particularly the immediate northern, southern and western properties.

Page 26: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 24 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Table 6.2 – Standard consultation and notification guideline adopted from the Interim Construction Noise Guideline

Consultation and Notification Notification before and during construction

• Provide, reasonably ahead of time, information such as total building time, what works are expected to be noisy, their duration, what is being done to minimise noise and when respite periods will occur. For works outside standard hours, inform affected residents and other sensitive land use occupants between five and 14 days before commencement.

• Provide information to neighbours before and during construction through media such as letterbox drops, meetings or individual contact. In some areas, the proponent will need to provide notification in languages other than English. A website could also be established for the project to provide information.

• Use a site information board at the front of the site with the name of the organisation responsible for the site and their contact details, hours of operation and regular information updates. This signage shall be clearly visible from the outside and include afterhours emergency contact details.

• Maintain good communication between the community and project staff.

• Appoint a community liaison officer where required.

• For larger projects consider a regular newsletter with site news, significant project events and timing of different activities.

• Provide a toll free contact phone number for enquiries during the works.

• Facilitate contact with people to ensure that everyone can see that the Site Manager understands potential issues, that a planned approach is in place and that there is an ongoing commitment to minimise noise.

Complaints handling

• Provide a readily accessible contact point, for example through 24 hour toll free information and complaint’s line.

• Give complaints a fair hearing.

• Have a documented complaints process, including an escalation procedure so that if a complainant is not satisfied there is a clear path to follow.

• Call back as soon as possible to keep people informed of action to be taken to address noise problems. Call back at night time only if requested by the complainant to avoid further disturbance.

• Provide a quick response to complaints, with complaints handling staff having both a good knowledge of the project and ready access to information.

• Keep a register of any complaints, including details such as date, time, person receiving complaint, complainant’s phone number, person referred to, description of the complaint, work area (for larger projects), time of verbal response and timeframe for written response where appropriate

Page 27: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 25 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

7 Conclusions A Construction Noise and Vibration Management Plan was prepared to satisfy the relevant standards for the proposed excavation and construction works to occur at the University of Sydney, Camperdown – The Chau Chak Wing Museum. The purpose of this assessment is to provide methods to prevent noise and vibration from the construction site causing unreasonable loss of amenity to nearby receivers and prevent vibration emissions disturbing or damaging nearby structures. The report has been prepared in accordance with and satisfies DA Condition B20 from the Development Consent (Application No. SSD 7894). The construction noise predictions from the site are provided in Section 5 of the report and outline that the noise levels will at times likely be exceeding the relevant management levels at the residential (across Paramatta Rd) receivers and at the University of Sydney educational receivers during the project. Section 6 outlines noise and vibration mitigation controls to be implemented on site. Appendix A provides for a Noise/Vibration Complaint Form template which can be used as seen fit. Appendix B provides the background noise measurement results graphs from the 1st – 7th of May 2018.

References Australian Standard AS 2436-2050 (R2016) – Guide to Noise Control on Construction, Maintenance and Demolition Sites Australian Standard 2107-2000 – Recommended design sound levels and reverberation times for building interiors. British Standard BS 5228.1 – Code of Practice for noise and vibration control on construction and open sites – Part 1: Noise EPA’s Interim Construction Noise Guideline

Page 28: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 26 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Appendix A

Complaint Form Content Template

Complainant to Detail:

Date: ____________________

Complainant’s Name: ________________________________________________________________

Complainant’s Address: ______________________________________________________________

Complainant’s Contact Details: ________________________________________________________

Describe when the noise/vibration problem began, what equipment caused the complaint (if seen/known), which location is the problem noticeable/audible etc:

__________________________________________________________________________________

__________________________________________________________________________________

__________________________________________________________________________________

__________________________________________________________________________________

__________________________________________________________________________________

FDC Construction (NSW) Pty Ltd to Detail:

Complaint Received by: ______________________________________________________________

Determination of what equipment was used on site and what methods were employed at time of complaint:

__________________________________________________________________________________

__________________________________________________________________________________

__________________________________________________________________________________

Option to contact Acoustic Consultants to provide attended monitoring or week unattended monitoring at complainants address.

Page 29: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

Construction Noise & Vibration Management Plan Page 27 of 32 Contract No C18 7845 FDC Construction (NSW) Pty Ltd Report No EMS18 5803 R2 Chau Chak Wing Museum

Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery Noise

First Floor, 935 Botany Road, Mascot NSW 2020 Telephone: (02) 9317 0100 Facsimile: (02) 9317 0122 ABN 13 050 039 177

Appendix B

• Background Noise Measurement

Page 30: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

20

30

40

50

60

70

80

0:0

0

1:0

0

2:0

0

3:0

0

4:0

0

5:0

0

6:0

0

7:0

0

8:0

0

9:0

0

10

:00

11

:00

12

:00

13

:00

14

:00

15

:00

16

:00

17

:00

18

:00

19

:00

20

:00

21

:00

22

:00

23

:00

A-w

eig

hte

d N

ois

e L

eve

l dB

Time

Noise Level MeasurementsMonitor Location: 3 Arundel St, Glebe

Date: 01-May-2018

Rainfall

Leq (A)

L10 (A)

L90 (A)

Page 31: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

20

30

40

50

60

70

80

0:0

0

1:0

0

2:0

0

3:0

0

4:0

0

5:0

0

6:0

0

7:0

0

8:0

0

9:0

0

10

:00

11

:00

12

:00

13

:00

14

:00

15

:00

16

:00

17

:00

18

:00

19

:00

20

:00

21

:00

22

:00

23

:00

A-w

eig

hte

d N

ois

e L

eve

l dB

Time

Noise Level MeasurementsMonitor Location: 3 Arundel St, Glebe

Date: 02-May-2018

Rainfall

Leq (A)

L10 (A)

L90 (A)

Page 32: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

20

30

40

50

60

70

80

0:0

0

1:0

0

2:0

0

3:0

0

4:0

0

5:0

0

6:0

0

7:0

0

8:0

0

9:0

0

10

:00

11

:00

12

:00

13

:00

14

:00

15

:00

16

:00

17

:00

18

:00

19

:00

20

:00

21

:00

22

:00

23

:00

A-w

eig

hte

d N

ois

e L

eve

l dB

Time

Noise Level MeasurementsMonitor Location: 3 Arundel St, Glebe

Date: 03-May-2018

Rainfall

Leq (A)

L10 (A)

L90 (A)

Page 33: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

20

30

40

50

60

70

80

0:0

0

1:0

0

2:0

0

3:0

0

4:0

0

5:0

0

6:0

0

7:0

0

8:0

0

9:0

0

10

:00

11

:00

12

:00

13

:00

14

:00

15

:00

16

:00

17

:00

18

:00

19

:00

20

:00

21

:00

22

:00

23

:00

A-w

eig

hte

d N

ois

e L

eve

l dB

Time

Noise Level MeasurementsMonitor Location: 3 Arundel St, Glebe

Date: 04-May-2018

Rainfall

Leq (A)

L10 (A)

L90 (A)

Page 34: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

20

30

40

50

60

70

80

0:0

0

1:0

0

2:0

0

3:0

0

4:0

0

5:0

0

6:0

0

7:0

0

8:0

0

9:0

0

10

:00

11

:00

12

:00

13

:00

14

:00

15

:00

16

:00

17

:00

18

:00

19

:00

20

:00

21

:00

22

:00

23

:00

A-w

eig

hte

d N

ois

e L

eve

l dB

Time

Noise Level MeasurementsMonitor Location: 3 Arundel St, Glebe

Date: 05-May-2018

Rainfall

Leq (A)

L10 (A)

L90 (A)

Page 35: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

20

30

40

50

60

70

80

0:0

0

1:0

0

2:0

0

3:0

0

4:0

0

5:0

0

6:0

0

7:0

0

8:0

0

9:0

0

10

:00

11

:00

12

:00

13

:00

14

:00

15

:00

16

:00

17

:00

18

:00

19

:00

20

:00

21

:00

22

:00

23

:00

A-w

eig

hte

d N

ois

e L

eve

l dB

Time

Noise Level MeasurementsMonitor Location: 3 Arundel St, Glebe

Date: 06-May-2018

Rainfall

Leq (A)

L10 (A)

L90 (A)

Page 36: NOISE AND VIBRATION MANAGEMENT PLAN Construction/CCW… · Noise and Vibration Consulting and Monitoring Building Acoustics Noise Impact Statements Aircraft, Traffic and Machinery

20

30

40

50

60

70

80

0:0

0

1:0

0

2:0

0

3:0

0

4:0

0

5:0

0

6:0

0

7:0

0

8:0

0

9:0

0

10

:00

11

:00

12

:00

13

:00

14

:00

15

:00

16

:00

17

:00

18

:00

19

:00

20

:00

21

:00

22

:00

23

:00

A-w

eig

hte

d N

ois

e L

eve

l dB

Time

Noise Level MeasurementsMonitor Location: 3 Arundel St, Glebe

Date: 07-May-2018

Rainfall

Leq (A)

L10 (A)

L90 (A)