nick gougoulias, mcip, rpp. - president trevor mcneil, ols · nick gougoulias, mcip, rpp. -...

1
north LOTS 41 & 42, PLAN 1509, LOT 23, PLAN 58M-79, BLOCK 1, PLAN 58M-80 & BLOCK 1, PLAN 58M-104, CITY OF CAMBRIDGE, REGIONAL MUNICIPALITY OF WATERLOO Saginaw Subdivision 124 Saginaw Parkway Cambridge, Ontario N1T 1Z2 K:\1422A-Nideva-Saginaw-Cambridge\Draft Plan\Draft Plan October 31 2016.dwg Dwg.. Project Legal Description Stamp Owner's Certificate Key Plan Surveyor's Certificate north Subject Site N.T.S. SCALE Date October 31, 2016 File No. 1422A Checked By P.B. 1:1500 Drawn By L.H.B. Plan Scale Other Additional Information Required Under Section 51(17) of the Planning Act R.S.O. 1990, c.P.13 as Amended A. As Shown B. As Shown C. As Shown D. Residential, Park, Open Space, Storm Water Management E. As Shown F. As Shown G. As Shown H. Municipal Water Supply I. Sandy Loam J. As Shown K. All Services As Required L. As Shown SOURCE: REGION OF WATERLOO Units Area (ha) Lots/ Blks Description Area Schedule Residential Park Open Space Roads TOTAL 30T-___________ 1-73 74 77 78 80 144 17 231 0.685 2.031 0.975 3.374 16.336 Units Area (ha) Lots/ Blks Units Area (ha) Lots/ Blks Stage 1 Stage 2 Total 1-62 63,64 65 67,68 72 88 50 138 1.325 1.227 1.341 69 9.257 135 3 2 2 152 232 67 369 2.010 3.258 1.077 4.715 25.593 3 76 Lot Addition 0.034 0.060 0.094 80 66 0.102 4 75 70 1 70 Trevor McNeil, OLS MTE Ontario Land Surveyors Ltd. Nick Gougoulias, MCIP, RPP. - President Saginaw Developments Corp. 79 0.045 Walkway 70-72 2 0.073 3.628 0.028 2.456 1.546 4.002 0.572 0.572 6.164 9.792 Rev. No. By Date Issued / Revision - Topographic information prepared by MTE Engineering. - Contour interval 0.5m. Notes: 1 LHB August 21,2015 Issued for Submission 2 LHB September 8,2015 Edits to Area Schedule 3 LHB May 2,2016 Revisions to Plan per Comments from City Staff and Public Meetings. Revise Area Schedule. 4 LHB July 4,2016 Revisions to Plan per Comments from City Staff and Public Meetings. Revise Area Schedule. 5 LHB August 10,2016 Edits to Area Schedule. Revise Street One Alignment to Green Vista Drive. 6 LHB August 29,2016 Renumber Streets in Stage 2 7 LHB October 12,2016 Revise Stage 2, Block 67 from Park to Open Space. Revise Area Schedule. 8 LHB October 31,2016 Stage 1, Lots 1-8 Revised.

Upload: others

Post on 03-Jan-2020

35 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nick Gougoulias, MCIP, RPP. - President Trevor McNeil, OLS · Nick Gougoulias, MCIP, RPP. - President Saginaw Developments Corp. Walkway 79 0.045 70-72 2 0.073 3.628 0.028 2.456 1.546

nort

h

LOTS 41 & 42, PLAN 1509, LOT 23, PLAN58M-79, BLOCK 1, PLAN 58M-80 &BLOCK 1, PLAN 58M-104,CITY OF CAMBRIDGE,REGIONAL MUNICIPALITY OF WATERLOO

Saginaw Subdivision124 Saginaw Parkway

Cambridge, OntarioN1T 1Z2

K:\1422A-Nideva-Saginaw-Cambridge\Draft Plan\Draft Plan October 31 2016.dwg

Dwg..

Project

Legal Description

Stamp

Owner's Certificate

Key Plan

Surveyor's Certificate

north

Subject Site

N.T.S.SCALE

DateOctober 31, 2016

File No.1422A

Checked ByP.B.

1:1500

Drawn ByL.H.B.

Plan Scale

Other

Additional Information Required Under Section 51(17) of the Planning ActR.S.O. 1990, c.P.13 as AmendedA. As Shown B. As Shown C. As ShownD. Residential, Park, Open Space, Storm Water Management

E. As Shown F. As ShownG. As Shown H. Municipal Water Supply I. Sandy LoamJ. As Shown K. All Services As Required L. As Shown

SOURCE: REGION OF WATERLOO

Units Area(ha)

Lots/Blks

Description

Area Schedule

Residential

Park

Open Space

Roads

TOTAL

30T-___________

1-73

74

77

78

80

144

17

231

0.685

2.031

0.975

3.374

16.336

Units Area(ha)

Lots/Blks Units Area

(ha)Lots/Blks

Stage 1 Stage 2 Total

1-62

63,64

65

67,68

72

88

50

138

1.325

1.227

1.341

69

9.257

135

3

2

2

152

232

67

369

2.010

3.258

1.077

4.715

25.593

3

76

Lot Addition 0.034 0.060 0.09480

66 0.102

4

75 70 1 70

Trevor McNeil, OLSMTE Ontario Land Surveyors Ltd.

Nick Gougoulias, MCIP, RPP. - PresidentSaginaw Developments Corp.

79 0.045Walkway

70-72

2 0.073

3.628

0.028

2.456 1.546 4.002

0.572 0.572

6.164 9.792

Rev. No. ByDate Issued / Revision

- Topographic information prepared by MTE Engineering.- Contour interval 0.5m.

Notes:

1 LHBAugust 21,2015 Issued for Submission2 LHBSeptember 8,2015 Edits to Area Schedule3 LHBMay 2,2016 Revisions to Plan per Comments from City Staff and Public

Meetings. Revise Area Schedule.

4 LHBJuly 4,2016 Revisions to Plan per Comments from City Staff and PublicMeetings. Revise Area Schedule.

5 LHBAugust 10,2016 Edits to Area Schedule. Revise Street One Alignment toGreen Vista Drive.

6 LHBAugust 29,2016 Renumber Streets in Stage 2

7 LHBOctober 12,2016 Revise Stage 2, Block 67 from Park to Open Space.Revise Area Schedule.

8 LHBOctober 31,2016 Stage 1, Lots 1-8 Revised.