newell brown subdivsion

18
NEWELL BROWN SUBDIVSION Draft Plan Approval Planning Advisory Committee Meeting – March 19 th , 2012 Mary C. Joyce-Smith, MCIP, RPP Senior Planner

Upload: synclair-osvaldo

Post on 03-Jan-2016

47 views

Category:

Documents


0 download

DESCRIPTION

NEWELL BROWN SUBDIVSION. Draft Plan Approval Planning Advisory Committee Meeting – March 19 th , 2012 Mary C. Joyce-Smith, MCIP, RPP Senior Planner. SUBDIVISION REVIEW. The City of Cornwall has delegated subdivision approval. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NEWELL BROWN SUBDIVSION

NEWELL BROWN SUBDIVSION

Draft Plan ApprovalPlanning Advisory Committee Meeting – March 19th, 2012Mary C. Joyce-Smith, MCIP, RPPSenior Planner

Page 2: NEWELL BROWN SUBDIVSION

SUBDIVISION REVIEW

The City of Cornwall has delegated subdivision approval.

The Plan has been reviewed in respect of the policies of the Provincial Policy Statement, the Official Plan, existing Zoning on site and current design standards. This plan is the result of comments and input received from various City Departments and outside Agencies.

2

Page 3: NEWELL BROWN SUBDIVSION

CORRESPONDING APPLICATIONS •As well, tonight we are reviewing two

Official Plan Amendments:

a) A change in the Staging of the lands from Stage Three to Stage One Lands

b) A change to Schedule 5 - Transportation to remove the Collector Street Network Study (CSN) requirements and to introduce a Local Road.

3

Page 4: NEWELL BROWN SUBDIVSION

Comments on Staging Changes• The Staging of lands in the City is based on the

speed of development such that the building industry has a healthy inventory of lots.

• The Data Book for 2011 showed development of about 40-50 singles and 10-15 semi lots, with multi lots developing as projects are proposed.

• The Provincial Policy Statement directs the municipality to maintain at least a three year supply of: “residential units available through lands suitably zoned to facilitate residential intensification and redevelopment, and lands in draft approved and registered plans.”

4

Page 5: NEWELL BROWN SUBDIVSION

SCHEDULE 2 STAGING of LANDS

5

Page 6: NEWELL BROWN SUBDIVSION

SCHEDULE 5 TRANSPORTATION

6

Page 7: NEWELL BROWN SUBDIVSION

SUBDIVISION PROPOSAL

•Review of a Draft Plan of Subdivision and Draft Plan Conditions:

▫24 single family units▫22 small lot singles ▫23 semi detached lots ▫4 blocks for multi-units

7

Page 8: NEWELL BROWN SUBDIVSION

8

Page 9: NEWELL BROWN SUBDIVSION

SUBDIVISION PROCESS

•Once a plan receives Draft Plan Approval, there are set predetermined conditions that are associated with the plan. These conditions need to be met in order to obtain final approval and registration. PAC will note that the completion of the adjacent subdivision is key to the finalization of this plan as detailed in Condition 5.

9

Page 10: NEWELL BROWN SUBDIVSION

Exit 789Exit 789Exit 789Exit 789Exit 789G

RACE S

TG

RACE S

TG

RACE S

TG

RACE S

TG

RACE S

TPATRICK STPATRICK STPATRICK STPATRICK STPATRICK ST

Limit of services

Limit of services

10

Page 11: NEWELL BROWN SUBDIVSION

• These Draft Plan Conditions also detail provisions for the two adjacent properties along Cornwall Centre, 550 and 520 Cornwall Centre Road. Planning staff have met with each of these property owners to understand their concerns. The issue of screening fences will be key given the proximity of the road to 550, as well a driveway at the rear is proposed and the service(s) being brought to the property line.

• The property at 520 will also have screening fencing around its perimeter and services brought to this property.

DRAFT PLAN CONDITIONS DEALING WITH CONCERNS OF ADJACENT PROPERTIES

11

Page 12: NEWELL BROWN SUBDIVSION

500500500500500

31243124312431243124

31283128312831283128

31323132313231323132

31363136313631363136

550550550550550

520520520520520

32273227322732273227

32213221322132213221

32313231323132313231

32293229322932293229

32483248324832483248

32443244324432443244

32403240324032403240

32363236323632363236

32323232323232323232

32243224322432243224

32283228322832283228

3218321832183218321832163216321632163216

32083208320832083208

32123212321232123212

3135313531353135313555555

999991313131313

3232323232

2828282828

2424242424

2020202020

16161616161212121212

66666 888881010101010

312531253125312531253123312331233123312331213121312131213121311931193119311931193117311731173117311731153115311531153115

529529529529529

33013301330133013301

3310331033103310331033083308330833083308

3212321232123212321232143214321432143214

3218321832183218321832203220322032203220

3314331433143314331433163316331633163316

3224322432243224322432263226322632263226

3235323532353235323532333233323332333233

BR

OO

KD

ALE

AV

BR

OO

KD

ALE

AV

BR

OO

KD

ALE

AV

BR

OO

KD

ALE

AV

BR

OO

KD

ALE

AV

CORNWALL CENTRE RD

CORNWALL CENTRE RD

CORNWALL CENTRE RD

CORNWALL CENTRE RD

CORNWALL CENTRE RD

ESDALE CT

ESDALE CT

ESDALE CT

ESDALE CT

ESDALE CT

FORESTDALE CR

FORESTDALE CR

FORESTDALE CR

FORESTDALE CR

FORESTDALE CR

JOH

NS

TO

N A

V

JOH

NS

TO

N A

V

JOH

NS

TO

N A

V

JOH

NS

TO

N A

V

JOH

NS

TO

N A

V

NO

RTH

DA

LE D

R

NO

RTH

DA

LE D

R

NO

RTH

DA

LE D

R

NO

RTH

DA

LE D

R

NO

RTH

DA

LE D

R

MA

CK

ST

MA

CK

ST

MA

CK

ST

MA

CK

ST

MA

CK

ST

CH (H)CH (H)CH (H)CH (H)CH (H)

CHCHCHCHCH

RES 20RES 20RES 20RES 20RES 20

12

Page 13: NEWELL BROWN SUBDIVSION

Looking Southerly on to subject property - also 550 Cornwall Centre

13

Page 14: NEWELL BROWN SUBDIVSION

Looking South towards Mr. & Mrs. Bedard’s property - 520 Cornwall Centre

14

Page 15: NEWELL BROWN SUBDIVSION

Looking Easterly along Cornwall Centre Road

15

Page 16: NEWELL BROWN SUBDIVSION

West along Cornwall Centre Road

16

Page 17: NEWELL BROWN SUBDIVSION

SUBDIVISION REVIEW 1.Concurrent with this Draft Plan Approval

application, the Developer is also involved in the First Application process under Land Titles (formerly known as the Certification of Title) which is distinct and separate from the Draft Plan process. This is done in conjunction with the Subdivider’s Agreement and at that point the Developer can move to full Registration of the plan.

17

Page 18: NEWELL BROWN SUBDIVSION

Concluding comments

•Planning Division staff would comment that this Draft Plan is completing the neighbourhood.

•The Draft Plan is meeting the criteria of maintain an inventory of Draft Approved lots as directed in the PPS.

•The timing of the registration of this plan is dependent on the speed of development which appears to be positive at this time.

18