NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary

Upload: howell

Post on 23-Feb-2016

43 views

Category:

Documents


3 download

DESCRIPTION

Comprehensive Facilities Master Plan – Progress Report Summary. NEW PALTZ CENTRAL SCHOOL DISTRICT. Purpose of 2013 Study. To update 2010 Building Condition Survey and Formulate a Long Range Facilities Plan. Options. A1 - Infrastructure Only + Partial Air Conditioning - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NEW PALTZ CENTRAL SCHOOL DISTRICT

NEW PALTZ CENTRAL SCHOOL DISTRICTComprehensive Facilities Master Plan – Progress Report Summary

Page 2: NEW PALTZ CENTRAL SCHOOL DISTRICT

Purpose of 2013 StudyTo update 2010 Building Condition Survey

and

Formulate a Long Range Facilities Plan

Page 3: NEW PALTZ CENTRAL SCHOOL DISTRICT

OptionsA1 - Infrastructure Only + Partial Air Conditioning-----------------------------------------------------------------------Upgrade for 21st Century Educational Model

B1 – “Good” Option • Containing all “must haves”

B2 – “Better” Option • Also containing all “should haves”• Upgrading to Full Building Air Conditioning

Page 4: NEW PALTZ CENTRAL SCHOOL DISTRICT

Must Have Should Have Like to Have

Duzine Improved Security Library Updated New toilets near cafeteria Dedicated Multi-Purpose Room Storage

Expand Cafeteria Serving Area Update Nurse’s Office

Middle School

Grade Level Clusters & Commons Relocate Locker Rooms near Gym Relocate Band Room Provide Chorus Space Improve Home & Careers Space Update 1 Science Lab. Update and Expand Library Renovate and update Nurse’s suite Dedicated Guidance suite Larger Central Kitchen Improve parent pick up and drop off

configuration Storage

Expand Cafeteria Reconfigure Nurse’s Office

More Playing Fields Adequate Locker Space

for all students.

High School 5 Additional Classrooms Renovate Boy’s Locker Rooms Improve Security at Main Office Relocate Guidance suite Storage

Upgrade & Enlarge Media Center

Upgrade & Reconfigure Home & Careers Room

Upgrade Life Skills Room

More Playing Fields

Lenape Update Nurse’s Office Storage

New and larger Band Room Modify Stage Area

District-wide Central Receiving Vehicle Storage

New Paltz Central School DistrictBoard of Education Meeting – 10/29/13Facilities Master Plan – Priorities based on discussions w/ Admin. & BOE

Page 5: NEW PALTZ CENTRAL SCHOOL DISTRICT

Benefits of Option B1 – Duzine - Good

Must Have

Duzine Improved Security Library Updated New toilets near

cafeteria Dedicated Multi-

Purpose Room Storage

Page 6: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at Duzine – Opt B1 - Good

Page 7: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at Duzine – Opt B1 - Good

Page 8: NEW PALTZ CENTRAL SCHOOL DISTRICT

Benefits of Option B2 – Duzine - Better

Must Have Should Have Like to Have

Duzine Improved Security Library Updated New toilets near

cafeteria Dedicated Multi-

Purpose Room Storage

Expand Cafeteria Serving Area

Update Nurse’s Office

Page 9: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at Duzine – Opt B2 - Better

Page 10: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at Duzine – Opt B2 - Better

Page 11: NEW PALTZ CENTRAL SCHOOL DISTRICT

Benefits of Option B1 – Lenape - Good

Must Have

Lenape Update Nurse’s Office

Storage

Page 12: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at Lenape – OPT B1 - Good

Page 13: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at Lenape – OPT B1 - Good

Page 14: NEW PALTZ CENTRAL SCHOOL DISTRICT

Benefits of Option B2 – Lenape - Better

Must Have Should Have Like to Have

Lenape Update Nurse’s Office

Storage

New and larger Band Room

Modify Stage Area

Page 15: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at Lenape – OPT B2 - Better

Page 16: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at Lenape – OPT B2 - Better

Page 17: NEW PALTZ CENTRAL SCHOOL DISTRICT

Benefits of Option B1 – MS – Good

Must Have

Middle School

Grade Level Clusters & Commons

Relocate Locker Rooms near Gym

Relocate Band Room Provide Chorus Space Improve Home & Careers

Space Update 1 Science Lab Update and Expand Library Renovate and update

Nurse’s suite Dedicated Guidance suite Larger Central Kitchen Improve parent pick up and

drop off configuration Storage

Page 18: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at MS – Opt B1 - Good

Page 19: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at MS – Opt B1 - Good

Page 20: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at MS – Opt B1 - Good

Page 21: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at MS – Opt B1 - Good

Page 22: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at MS – Opt B1 - Good

Page 23: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at MS – Opt B1 - Good

Page 24: NEW PALTZ CENTRAL SCHOOL DISTRICT

Benefits of Option B2 – MS – Better Must Have Should Have Like to Have

Middle School

Grade Level Clusters & Commons

Relocate Locker Rooms near Gym

Relocate Band Room Provide Chorus Space Improve Home & Careers

Space Update 1 Science Lab Update and Expand Library Renovate and update

Nurse’s suite Dedicated Guidance suite Larger Central Kitchen Improve parent pick up and

drop off configuration Storage

Expand Cafeteria Reconfigure Nurse’s

Office

More Playing Fields Adequate Locker

Space for all students

Page 25: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at MS – Opt B2 - Better

Page 26: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at MS – Opt B2 - Better

Page 27: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at MS – Opt B2 - Better

Page 28: NEW PALTZ CENTRAL SCHOOL DISTRICT

Benefits of Option B1 – HS – Good

Must Have

High School

5 Additional Classrooms Renovate Boy’s Locker

Rooms Improve Security at

Main Office Relocate Guidance suite Storage

Page 29: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at HS – Opt B1 - Good

Page 30: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at HS – Opt B1 - Good

Page 31: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at HS – Opt B1 - Good

Page 32: NEW PALTZ CENTRAL SCHOOL DISTRICT

Benefits of Option B2 – HS – Better

Must Have Should Have Like to Have

High School

5 Additional Classrooms Renovate Boy’s Locker

Rooms Improve Security at

Main Office Relocate Guidance suite Storage

Upgrade & Enlarge Media Center

Upgrade & Reconfigure Home & Careers Room

Upgrade Life Skills Room

More Playing Fields

Page 33: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at HS – Opt B2 - Better

Page 34: NEW PALTZ CENTRAL SCHOOL DISTRICT

Renovations at HS – Opt B2 - Better

Page 35: NEW PALTZ CENTRAL SCHOOL DISTRICT

OptionsA1 - Infrastructure Only + Partial Air Conditioning-----------------------------------------------------------------------Upgrade for 21st Century Educational Model

B1 – “Good” Option • Containing all “must haves”

B2 – “Better” Option • Also containing all “should haves”• Upgrading to Full Building Air Conditioning

Page 36: NEW PALTZ CENTRAL SCHOOL DISTRICT

Financial Summary

OPTION A1…………$30.5

OPTION B1…………$70.4

OPTION B2…………$84.5

Page 37: NEW PALTZ CENTRAL SCHOOL DISTRICT

Financial Summary: Details

OPTION A1 (infrastructure + partial air conditioning)Duzine………....$4.6Lenape………...$4.1Middle School...$12.3High School…...$9.5

TOTAL…………$30.5Expected Aid….$18.3Net Cost……….$12.2

*Note “partial a/c” = upper floor + gym, aud., & library

Page 38: NEW PALTZ CENTRAL SCHOOL DISTRICT

OPTION B1 (“good” / “must haves”, partial a/c)Duzine………....$7.0Lenape………...$7.2Middle School...$38.9High School…...$17.3

TOTAL…………$70.4Expected Aid….$39.1Net Cost……….$31.3

*Note “partial a/c” = upper floor + gym, aud., & library

Financial Summary: Details

Page 39: NEW PALTZ CENTRAL SCHOOL DISTRICT

OPTION B2 (“better” / “+ should haves”, + full a/c)Duzine………....$8.4Lenape………...$9.0Middle School...$43.8High School…...$23.3

TOTAL…………$84.5Expected Aid….$46.4Net Cost……….$38.1

Financial Summary: Details

Page 40: NEW PALTZ CENTRAL SCHOOL DISTRICT

Air Conditioning SummaryMethod 1 (Unit Ventilator)Duzine a. full building…$1.8 *only a 1-story buildingLenape a. partial……….$1.5 b. full………......$2.7Middle School (method 1 not cost effective)High School a. partial……....$1.7 b. full …............$4.2

*Note “partial” = upper floor + gym, aud., & library

Page 41: NEW PALTZ CENTRAL SCHOOL DISTRICT

Air Conditioning SummaryMethod 2 (Central HVAC w/ Energy Recovery )Duzine a. full building…$2.6 *only a 1-story buildingLenape a. partial……….$2.2 b. full………......$3.0Middle School a. partial……….$1.1 b. full………......$4.7High School a. partial……....$2.5 b. full …............$6.1*Note “partial” = upper floor + gym, aud., & library

Page 42: NEW PALTZ CENTRAL SCHOOL DISTRICT