new crossovers in bayview to assist the tippler

7
NEW CROSSOVERS IN BAYVIEW TO ASSIST THE TIPPLER EFFICIENCY

Upload: kenneth-williams

Post on 17-Jan-2017

85 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEW CROSSOVERS IN BAYVIEW TO ASSIST THE TIPPLER

NEW CROSSOVERS IN BAYVIEW TO ASSIST THE TIPPLER EFFICIENCY

Page 2: NEW CROSSOVERS IN BAYVIEW TO ASSIST THE TIPPLER

Transnet Freight Rail

2

PREVIOUS SCENARIO TIPPLER ONE AND TWO SHARED THREE OFFLOADING LINES.

YARD PERSONELL COULD NOT PULL EMPTYS WAGONS FROM TIPPLERS DUE TO CONGESTION.

LONG DOWNTIME ON TIPPLERS DUE THE YARDS BEING BLOCKED.

NOT BEING ABLE TO SERVICE THE TIPPLERS ON TIME WAS IMPACTING ON OUR WAGON TURNAROUND TIME,LOCOMOTIVE TURNAROUND TIME ,ON TIME DEPARTURES AND RESERVATIONS.

CURRENTLY TIPPLER TWO HAS ONLY TWO FEEDER LINES FOR THE LOADED SIDE AND THIS MEANS THAT ONLY ONE LOAD CAN BE STAGED AND PREPARED WHILST THE OTHER IS BEING TIPPED

. EMPTY LOADS THAT MUST DEPART ARE PULLED OUT AND PLACED ON OTHER LINES THIS IS

TIME CONSUMING AND WE HAVE TO WAIT FOR SPACE AND TRAINS TO DEPART BEFORE THIS OCCURS.

Page 3: NEW CROSSOVERS IN BAYVIEW TO ASSIST THE TIPPLER

TO BE PLAN

Transnet Freight Rail

3

Page 4: NEW CROSSOVERS IN BAYVIEW TO ASSIST THE TIPPLER

FROM THE MINES TO PORT

Transnet Freight Rail

4

Mar

Page 5: NEW CROSSOVERS IN BAYVIEW TO ASSIST THE TIPPLER

BENEFITS

TIPPLER TWO NOW HAS THREE LINES THAT CAN BE USED FOR OFFLOADING.

AT ANY STAGE WE CAN HAVE TWO EMPTY LOADS FROM TIPPLER TWO READY PLUS THE THIRD LOAD BUSY BEING TIPPED.

WE HAVE A NEW LINE TO STAGE LOADED WAGONS TOWARDS THE TIPPLER.

WE ARE NOW ABLE TO JUST PULL UP THE EMPTYS AND TURN THE POINTS FOR THE NEXT LINE AND ON THE LOADED SIDE WE CAN PUSH UP THE LOADED WAGONS IN WITH EASE DUE TO THE FACT THAT WE HAVE THREE STAGING LINES FOR LOADED WAGONS.

DELAYS WILL BE MINIMISED DUE TO US HAVING THESE DEDICATED LINES.

TAT HAS IMPROVED ON A OVERALL BASIS.

THE MAGNETITE MINES STOCKPILES WILL DECREASE DRASTICALLY.

LESS STOPPAGE TIME FOR TIPPLERS DUE TO THE YARD BEING BLOCKED.

Transnet Freight Rail

5

Page 6: NEW CROSSOVERS IN BAYVIEW TO ASSIST THE TIPPLER

Transnet Freight Rail

6

TIPPLER EFFICIENCY PRE AND POST PROJECT

7,4

776677779

11 DesignActual

Tippler Offloading

(‘Hours)

-34%

Avg Exporte

d

Avg Receive

d

274,750 285,500

Monthly

Budget

416,667+35%

416,667 433,200

Avg Exporte

d

Avg Receive

d

418,800

Monthly

BudgetPrior to Project

(tons)Since Implementation

(tons)

Page 7: NEW CROSSOVERS IN BAYVIEW TO ASSIST THE TIPPLER

THE END

QUESTIONS ?

THANKS KENNETH WILLIAMSRICHARDS BAY

Transnet Freight Rail