nashik municipal corporation, nashik management, operation … · 2019-11-21 · nashik municipal...

30
Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital, Nashik Road under Public Private Partnership (PPP) 1. INTRODUCTION Nashik Municipal Corporation has 4 major hospital, 5 Maternity homes and 25 UPHC all over Nashik considering the workload of current Bytco Hospital which is 200 beded started in 1981. It was the need of time and people to have bigger & sophisticated hospital in Nashik Road. Considering the parameters of big hospital with keeping in mind to start Medical or Post graduate college new building is built up. NMC Invites Expression of Interest (EOI) from resourceful and willing Institutions / individuals for Management, Operation and Maintenance of J.D.C Bytco Hospital, Nashik Road under Public Private Partnership (PPP) to start super specialty hospital. 2. ABOUT THE HOSPITAL Detailed specifications of the building Total Area : 26100 Sqmt Constructed Area : 18712 Sqmt (2 Basement + G+3) Parking Area : 2 Basements Doctors Chambers / Consultation Rooms : 12 Wards : Total 15 wards and 85 Private rooms. Medicine - Male, Female separate Surgery - Male, Female separate Ortho - Male, Female Pediatric separate ENT Urology Dialysis & Day Care Family Planning Gynecology Maternity Post Natal Pediatric Ward Pediatric Intensive Care Unit Neonatal Intensive Care Unit ICU - 20 beded O.T. Complex 6 Major OT with 2 recovery rooms + 2 Gynaec OT Diagnostic : X-ray, Pathology, Ultrasound, Radiology, CT Scan, MRI Scan Facilities : Canteen, Fire Fighting system with pump house, DG set room. Other Facilities : Area for chemist shop Other : Administrative wing, Store Rooms, Record Room, Cash Room, RNTCP room, Billing Section, Admission & OPD registration Section. Post Martum room, Laundry section Bidders are requested to visit the site to appraise them about the infrastructure available.

Upload: others

Post on 19-Apr-2020

36 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

Nashik Municipal Corporation, Nashik

Management, Operation and Maintenance of New J.D.C Bytco Hospital, Nashik Road under Public Private Partnership (PPP)

1. INTRODUCTION

Nashik Municipal Corporation has 4 major hospital, 5 Maternity homes and 25 UPHC all over

Nashik considering the workload of current Bytco Hospital which is 200 beded started in 1981. It

was the need of time and people to have bigger & sophisticated hospital in Nashik Road.

Considering the parameters of big hospital with keeping in mind to start Medical or Post

graduate college new building is built up. NMC Invites Expression of Interest (EOI) from

resourceful and willing Institutions / individuals for Management, Operation and Maintenance of

J.D.C Bytco Hospital, Nashik Road under Public Private Partnership (PPP) to start super specialty

hospital.

2. ABOUT THE HOSPITAL

Detailed specifications of the building

Total Area : 26100 Sqmt

Constructed Area : 18712 Sqmt (2 Basement + G+3)

Parking Area : 2 Basements

Doctors Chambers / Consultation Rooms

: 12

Wards : Total 15 wards and 85 Private rooms. Medicine - Male, Female separate Surgery - Male, Female separate Ortho - Male, Female Pediatric separate ENT Urology Dialysis & Day Care Family Planning Gynecology Maternity Post Natal Pediatric Ward Pediatric Intensive Care Unit Neonatal Intensive Care Unit ICU - 20 beded

O.T. Complex 6 Major OT with 2 recovery rooms + 2 Gynaec OT

Diagnostic : X-ray, Pathology, Ultrasound, Radiology, CT Scan, MRI Scan

Facilities : Canteen, Fire Fighting system with pump house, DG set room.

Other Facilities : Area for chemist shop

Other : Administrative wing, Store Rooms, Record Room, Cash Room, RNTCP room, Billing Section, Admission & OPD registration Section. Post Martum room, Laundry section

Bidders are requested to visit the site to appraise them about the infrastructure available.

Page 2: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

3. PPP FRAMEWORK

PPP Model Management Contract

Concessions a. Land, Building and infrastructure on “as-is-where-is basis” shall be provided by the Board. b. Concessionaire shall procure plant and machinery and equipments to meet the project objectives of setting up 300 bed hospital. c. Concessionaire shall operate and manage the hospital. d. Private Player shall form Special Purpose Vehicle (SPV) for execution of project. e. Concession Period shall be 3 years, renewable upto 5 years. f. Concessionaire shall: Reserve 20 % of total capacity of IPD and 20% of total capacity of OPD for BPL patients and employees of the NMC to be treated free/concessional rates (as per guidelines framed by The Board) from time to time. h. Shall be free to charge other patients at CGHS / Govt Approved rates after informing NMC in this regard.

Concessioning Authority Nashik Municipal Corporation

Confirming Party Preferred Bidder

Concession period Three (03) years renewable up to five (05) years.

Land, Building, fixed and movable assets as handover by the NMC to the concessionaire be transferred to NMC after the end of concession period.

4. REVENUE POTENTIAL

The hospital will have various revenue earning options. Selected bidder shall prepare a business

model and submit to the Board for approval. Some of these could be:

Primary Services (medical in nature): Rentals and fees from IPD patients

Fees from surgeries/ medical procedures

Rental from OPD slots

Diagnostic Services

Rental from pharmacy/ chemist shop

Auxiliary Services (non-medical): Ambulance Charges

Canteen/ Café

Parking

Page 3: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

5. MONITORING MECHANISM

To ensure that the project is being developed and run in accordance with the Concession Agreement between NMC & Concessionaire, a Governing Council shall be constituted by the NMC to administer the functioning of the Hospital.

6. OBJECTIVE AND SCOPE OF WORK

Objective To provide healthcare services at Nashik Municipal Corporation Area, by equipping, financing, running and maintenance of a Hospital on Public Private Partnership (PPP) Mode.

Project Name Management, Operation and Maintenance of New JDC Bytco Hospital, Nashik Road under Public Private Partnership (PPP)

Proposed Facilities 300 beds New JDC Bytco Hospital, Nashik Road complying norms laid under Bureau of Indian Standards (BIS)/ Indian Public Health Standards (IPHS) / NABH (National Accreditation Board for Hospitals) besides applicable Guidelines/Policies of State and Central Government. The hospital should have following fully equipped departments/wings: OPD IPD Cardiology Nephrology Urosurgery Cardiothoracic Surgery Pediatric Surgery Gastroenterology Endocrinology IVF Center General Surgery Medicine Orthopedic Gynecology Pediatric Ophthalmic Dental ENT Dermatology, Psychiatry Physiotherapy Emergency/ICU Urology Dialysis & Day Care DOT centre and designated microscopy centre X Ray/CT Scan/MRI Scan/ Sonography /Diagnostic/

Pathology The above list is indicative and the Concessionaire shall however be free to add / delete services with the approval of the Board.

Page 4: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

Proposed Ancillary Services and Amenities

Ambulance Services Dietary Services Laundry and Linen Services Waste Management Including Biomedical Waste Nursing Services Parking Pharmacy/ Chemist Shop ATM/Canteen/Coffee Shop STD/Fax/Internet The above list is indicative and the Concessionaire shall however be free to add / delete services with the approval of the Board.

Page 5: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

Expression of Interest :

Nashik Municipal Corporation

Public Health Department

Nashik Municipal Corporation invites expression of Interest from various

Organizations, Doctor/Registered group of doctors, Corporate group of Hospitals for 300

bed New Bytco Hospital equipped with CT Scan, MRI Scan for Public Private Partnership.

Proposals are invited for Operation; Maintenance and Management of 300 bed

new Bytco Hospital appropriate for medical college or post graduate institute. You are

requested to see details of hospital building plan etc. on the website of Nashik Municipal

Corporation www.nashikcorporation.com. You can also contact Public Health

Department, Rajiv Gandhi Bhavan or Nashik Road PWD Office if you desire to visit the

site of new Bycto Hospital and then submit appropriate proposal. Details available at

Public Health Department, 3rd floor, Rajiv Gandhi Bhavan, Nashik.

Medical Officer of Health Commissioner Nashik Municipal Corporation, Nashik Nashik Municipal Corporation, Nashik

Page 6: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

0.60

1.85

0.75

0.75

0.27

0.68

2.25

1.14

0.65

0.49

1.59

0.72

0.91

1.36

0.57

2.86

1.71

1.16

0.74

0.75

1.09

0.75

2.31

1.95

2.95

0.75

1.04

0.75

0.41

0.75

1.32

0.75

1.70

1.90

0.491.24

1.24

0.75

1.70

0.94 1.46

1.12

1.75

2.40

1.95 0.60

0.49 0.75 1.20 0.75 1.20 0.75 0.76

0.49 0.75 1.20 0.75 1.20 0.75 1.01

1.95

1.11

0.78

1.02

1.32

0.941.01 0.82 1.10

1.15

1.40

1.98

0.85

0.82 1.10

1.62

0.88 1.07

1.62

1.081.83

0.87

0.75

0.95

0.75

0.92

0.75

0.71

1.08

0.75

0.87

0.75

0.95

0.75

2.38

2.20

0.74

1.19

0.75

2.67

0.76

1.08

1.17

1

.6

5

0

.7

5

1

.3

2

0

.7

5

0

.7

5

1

.9

7

0

.7

5

1

.2

2

0

.7

5

1

.2

2

0

.7

5

1

.2

2

0

.7

5

1

.1

6

1

.1

6

1

.9

1

1

.2

2

0

.7

5

1

.2

2

0

.7

5

1

.2

2

0

.7

5

2

.1

5

3

.6

5

3

.2

3

3

.1

9

2

.6

4

2

.7

5

4.4

7

1.01

0.75

0.95

0.75

1.29

0.75

1.13

0.75

0.75

1.70

0.75

1.16

0.75

3.02

1.41

0.99

1.72

1.09 0.62 1.28

0.99

1.45

1.07

0.75

1.17

0

.7

5

1

.1

5

0

.7

5

1

.1

5

0

.7

5

1

.1

5

0

.7

5

1

.1

5

0

.7

5

0

.8

8

1.13

0

.7

5

1

.0

8

0

.7

5

0

.8

8

0

.7

5

3.90

0.75

1.35

0.75

0

.7

5

1

.1

1

0

.7

5

1

.0

1

0

.7

5

1

.0

6

0

.7

5

1

.9

5

1

.1

0

1

.6

2

1

.3

1

1

.1

2

1.401.53

1.591.47

1.69

1.72

1.70

1.70

0.75 2.57 0.75 1.34

0.752.500.752.150.75 2.10 0.75 1.37

1.95

1.10

1.95

3.00

1.95

0.750.75 1.38

0.75 2.44 0.75 0.89

1.35 2.49

1.29 1.21

1.22

1.90

1.19

1.40

0.75

1.85

1.74 1.51 2.03

0.75 2.03

1.20

2.46

3.34

0.81 1.16

1.18 1.38

1.14

1.600.95

0.49

0.75

1.22

0.75

2.16

0.75

1.95

0.75

1.57

1.00

2.78

2.78

0.70

2.35

2.10

1.12 0.68

0.55

1.05

2.55

0.57

1.44

1.24

1.68

1.00

1.29

1.35

0.47

2.75

3.79

2.83

2.05

2.23

1.30

1.05

2.47

0.60

0.60

1.04

1.65

2.95

1.71

0.75

0.44

0.751.65 0.75 1.70

0.74 0.75 1.78 0.75 0.98

3.44

0.94 0.75 1.13 0.72 1.46

2.25

1.37

1.500.75 0.75

1.12 0.75 1.09 0.75 1.31

0.75

1.20

0.75 1.52 0.75 1.26 0.75

2.45

0.75

1.70

1.33 2.19

1.51

1.21

2.80

2.11

2.22

FIRST FLOOR PLAN

DIALYSIS

D

A

Y

C

A

R

E

T - 300 mm

R - 150 mm

T - 300 mm

R - 150 mm

T - 3

00

m

m

R - 1

50

m

m

T - 300 mm

R - 150 mm

R

- 1

5

0

m

m

GLAZING

GLAZING

GLAZING

GL

AZ

IN

G

+3.90 M.

W2

W2

W2

W2

W

2

W

2

W2

W2

WET

AREA

WET

AREA

WET

AREA

WET

AREA

W2

URINALS

tile drop tile drop tile drop tile drop tile drop tile drop

HC

WC

WC

WC BATH

100MM THICK

BRICK WALL

100MM THICK

BRICK WALL

WC WC WC HC

BATH

tile drop tile drop tile drop tile drop tile drop

GENERAL LADIES TOILET

8.22 X4.03M

GENERAL GENTS TOILET

8.22 X4.03 M

SHAFT FOR FIRE

SPRINKLER

RISER FOR

FIRE HYDRANT

ELECTRICAL

RISER

RISER FOR LV

SYSTEM

SH

AF

T F

OR

FIR

E

SP

RIN

KL

ER

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

EL

EC

TR

IC

AL

RIS

ER

RIS

ER

F

OR

L

V

SY

ST

EM

SH

AF

T F

OR

FIR

E

SP

RIN

KL

ER

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

EL

EC

TR

IC

AL

RIS

ER

RIS

ER

F

OR

L

V

SY

ST

EM

S

H

A

F

T

F

O

R

F

I

R

E

S

P

R

I

N

K

L

E

R

R

I

S

E

R

F

O

R

F

I

R

E

H

Y

D

R

A

N

T

E

L

E

C

T

R

I

C

A

L

R

I

S

E

R

R

I

S

E

R

F

O

R

L

V

S

Y

S

T

E

M

WC

WC

tile drop

HER

HIS

tile drop

PLATFORM

URINALS

WC

HIS

HER

WC

WC

WC

tile drop

tile drop

P

L

A

T

F

O

R

M

U

R

IN

A

L

S

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

1.00 0.95 0.95 0.95

eq.

eq.

COUNSELLING

SISTERS ROOM

WC

DRAWING TITLE:-

THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR

WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH

WAS COMMISSIONED.

ACCEPTS NO RESPONSIBILITY FOR THIS

DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.

1. DRAWINGS SHALL BE READ AND NOT TO SCALED.

2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE

REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.

3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES

DRAWINGS.

KK ASSOCIATEELECTRICAL CONSULTANTS

EPICONS CONSULTANTS

STRUCTURAL CONSULTANTS

PROJECT TITLE :-

NASHIK MUNICIPAL

CORPORATION.

NMC BYTCO HOSPITAL

BUILDING IN S.NO.240(P) &

241(P) AT.VILLAGE DEOLALI

NASHIK,MAHARASTRA

ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]

DATE SCALE

DRWG NO:- LB-FP

1:100

REVISIONR-2

FIRST FLOOR PLAN

2 wash basins added

2 wash basins added

2 wash basins

addedAluminum partition

wall demolish for dooropening

tile drop

Toilet tobe ADD

Wash basinsadded

ALUMINUMDOOR

2 wash basins added

toilet tobe ADD

2 wash basins added2 wash basins added2 wash basins added

collapsible gate

2 wash basins added

WALLS TO BE REMOVED

WALLS TO BE ADDED

15 -WASH BASINS ADDED

2.22

W2

W2

W2

W2

W

2

W

2

W2

W2

W2

tile drop tile drop tile drop tile drop tile drop tile drop

100MM THICK

BRICK WALL

100MM THICK

BRICK WALL

tile drop tile drop tile drop tile drop tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

1.00 0.95 0.95 0.95

eq.

eq.

CLIENT :-

tile drop

NEW ADDED A.C

wall to beconstruct

wall to beconstruct

Aluminum partition

4 NO TOILET ADDED

4-WB WITH PLATFORM IN TOILET

Page 7: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

3

.4

3

0.42

0.75 1.90 0.75

1.72

2.19

0.60

2.12

1.05

1.95

2.19

2.08

3.31

2.84

2.96

0.75

2.18

0.75

1.13

0.67

0.75

1.95

0.75

0.38

0.34

0.75

2.09

0.75

0.75

0.75

0.75

1.40

1.30

1.61

0.99

2.01

0.59

1.15

1.990.59

1.35

0.71

0.75

1.06

0.74

1.12

1.35

0.96

0.79

2.20

0.75 1.79 0.75 1.51 0.75

0.60

2.41

0.75

1.42

0.75

2.72

1.19

0.75

1.33

0.75

1.36

0.75

2.23

0.75

1.73

2.01

0

.7

5

1

.0

9

0

.7

5

1

.2

0

0

.7

5

0

.7

5

1

.9

5

0

.8

2

1

.5

1

0

.8

6

0

.7

5

1

.4

0

0

.7

5

1

.0

1

0

.9

0

1

.5

6

1

.4

2

1

.1

1

0

.7

6

0

.7

5

0

.7

5

0

.9

8

0

.7

5

0

.4

9

1

.0

0

1

.3

0

1

.3

8

2.66

0.50

3.07

0.75

2.06

0.75

1.12

0.75

2.50

2.00

1.73

0.75

1.30

2.05

0.75

1.15

0.75

1.31

0.75

1.15

0.74

0.75

1.30

0.75

1.30

0.75

1.33

0.75

1.30

0.75

1.30

0.75

1.81

1.81

0.75

1.30

0.75

1.30

0.75

1.33

0.75

1.30

0.75

1.30

0.75

0.74

0.75

1.30

0.75

1.30

0.75

1.06

0.75

2.22

0.75

3.20

1.09

0.75

1.09

0.75

1.09

0.75

1.07

0.75

3.84

0.01

0.570.751.570.753.62

0.90

0.60

0.60

0.90

0.60

1.20

0.60

1.20

0.60

1.20

0.60

1.20

0.60

1.20

0.60

1.20

0.60

0.75 1.23 0.75 0.92

0.75 1.48 0.75 1.74

3.97

2.32

3.10

1.68

1

.1

4

1

.4

1

1

.0

7

1

.1

0

1

.1

4

0

.4

9

1

.

0

0

2.94

0.751.170.742.44

0.75

1.18

0.75

1.37

0.75

6.38

0.75 1.37 0.75 2.41

0.98

0.97

0.75 1.37 0.75 2.41

0.75

3.67

1.76

1.26

1

.3

2

0

.7

5

1

.6

5

0

.7

5

1

.5

0

1.45

0.75

2.07

0.75

1.10

0.75

2.22

0.75

3.43

1.43

0.75

2.07

0.75

1.10

0.74

2.23

0.75

0.80

0.75

1.13

0.75

1.95

0.75

3.62

0.56

1.38

V5

LAB MEDICINE

SECOND FLOOR PLAN

T - 300 mm

R - 150 mm

T - 300 mm

R - 150 mm

T - 300 m

m

R - 150 m

m

R

- 1

5

0

m

m

W3

W3

W3

GLAZING

GLAZING

W1W1

W1 W1 W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W3

W3W3

W3 W3

W3

W3W3 W3

W3

W3

W3

W4 W4

W3

GLAZING

+ 7.80 M.

W2

W2

W2

W2

W

2

W

2

W2

W2 W3W3W3W3W3W3W3

W3

W1

W3

W3

W3

W3

W3

W3

W4

W3

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

WET

AREA

WET

AREA

W6

WET

AREA

W5

W6

W6

W6

W6

V4

V4

V4

V4

V4

V4

V4

V4 V4 V4

V4

SH

AF

T F

OR

FIR

E

SP

RIN

KL

ER

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

EL

EC

TR

IC

AL

RIS

ER

RIS

ER

F

OR

L

V

SY

ST

EM

SH

AF

T F

OR

FIR

E

SP

RIN

KL

ER

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

EL

EC

TR

IC

AL

RIS

ER

RIS

ER

F

OR

L

V

SY

ST

EM

SHAFT FOR FIRE

SPRINKLER

RISER FOR

FIRE HYDRANT

ELECTRICAL

RISER

RISER FOR LV

SYSTEM

S

H

A

F

T

F

O

R

F

I

R

E

S

P

R

I

N

K

L

E

R

R

I

S

E

R

F

O

R

F

I

R

E

H

Y

D

R

A

N

T

E

L

E

C

T

R

I

C

A

L

R

I

S

E

R

R

I

S

E

R

F

O

R

L

V

S

Y

S

T

E

M

W3

V4

V4

V4V4

V4

V4

W1 W1 W1 W1W1 W1 W1 W1 W1

V5

W1

V

5

W1 W1

W1

W3

V5

V5

V

5

V

5

V4

/S

T

O

R

E

/STORE

URINALS

tile drop

tile drop tile drop tile drop tile drop tile drop tile drop

HC

WC WC WC WCBATH

100MM THICK

BRICK WALL

100MM THICK

BRICK WALL

WC WC WC HC

BATH

tile drop tile drop tile drop tile drop tile drop

tile drop

GENERAL LADIES TOILET

8.22 X4.03M

GENERAL GENTS TOILET

8.22 X4.03 M

V V V V V

VV V V V

V

V

5

V

WC

HER

V

V

V

V

HIS

HER

WC

WC

WC

tile drop

tile drop

P

L

A

T

F

O

R

M

U

R

IN

A

L

S

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

V

2

V5

V4 V4

V4

V4

PEDIATRIC WARD

W3

D1

D1

D1

DD

tile drop

tile drop

DRAWING TITLE:-

THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR

WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH

WAS COMMISSIONED.

ACCEPTS NO RESPONSIBILITY FOR THIS

DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.

1. DRAWINGS SHALL BE READ AND NOT TO SCALED.

2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE

REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.

3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES

DRAWINGS.

CLIENT :-

KK ASSOCIATEELECTRICAL CONSULTANTS

EPICONS CONSULTANTS

STRUCTURAL CONSULTANTS

PROJECT TITLE :-

NASHIK MUNICIPAL

CORPORATION.

NMC BYTCO HOSPITAL

BUILDING IN S.NO.240(P) &

241(P) AT.VILLAGE DEOLALI

NASHIK,MAHARASTRA

ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]

DATE SCALE

DRWG NO:- LB-FP

1:100

REVISION

SECOND FLOOR PLANWALLS TO BE REMOVED

WALLS TO BE ADDED

8-WASH BASINS ADDED

NEW ADDED TOILETS

TOILET TOBE ADD

4' HEIGHT WALLAND GLASSWINDOWABOVE

wall to beconstruct

toilet tobe ADD

WALL TOBE ADD

ANDREMOVE

toilet tobe ADD

PLATFORMSWITHWASH

BASINSADDED

Toilet tobe ADD

LOWHEIGHT

PARTITION

WALL TOBE ADDto close

door

Wall to beadd toclosedoor

Wall to beremove tofor door

Newtoiletadded

partitionTO BEADD

window tobe closed

srcub sinkadded

2-SCRUB BASINS

ALUMINUMPARTITION

brick wall+slidingwindow

tile drop

tile drop tile drop tile drop tile drop tile drop tile drop

100MM THICK

BRICK WALL

100MM THICK

BRICK WALL

tile drop tile drop tile drop tile drop tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

D1

D1

D1

DD

tile drop

tile drop

NEW ADDED A.C

wall to beconstruct

wall to beconstruct

granite platform withwash basin

Wall to beremove to

8 NO TOILET ADDED

sink

sink

2-SINK ADDED

9-WB WITH PLATFORM IN TOILET

1.49

1.39

1.98

0.70

1.50

2.19

5.54

1.49

0.96

2.46

2.19

2.19

2.19

0.70

2.19

2.19

0.88

W3

W3

W3W3

W6

V

V

WC

tile drop

HIS

tile drop

PLATFORM

URINALS

WC

tile drop

tile drop

0.24

Page 8: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

1.98

0.9

01

.9

70

.9

01

.0

70

.9

01

.0

70

.9

01

.0

70

.9

0

0.90

0.9

0

2.3

5

2.6

2

3.6

10

.9

01

.5

3

1.0

70

.9

01

.0

70

.9

01

.0

70

.9

01

.0

70

.9

0

0.4

5

1.0

0

0.4

5

1.0

0

0.4

5

1.0

0

0.4

5

1.0

0

0.4

5

1.0

0

0.4

5

1.0

0

2.3

5

0.60

2.3

5

0.60

1.98

0.9

01

.0

70

.9

01

.0

70

.9

01

.0

70

.9

01

.0

70

.9

0

1.9

8

0.90

0.9

0

1.9

8

0.90

1.0

70

.9

01

.0

70

.9

01

.0

70

.9

01

.0

70

.9

0

0.9

00

.9

0

2.2

71

.9

0

1.79

1.9

01

.9

01

.9

0

1.562.971.75

2.00

1.98

1.98

1.98

1.98

1.98

1.98

THIRD FLOOR PLAN

CHANGING

2.86X4.29

C

H

A

N

G

IN

G

2

.5

0

X

3

.2

0

C

H

A

N

G

IN

G

3

.0

8

X

4

.2

9

(

A

P

P

R

O

X

)

4.15 X 3.554.08 X 3.55INFECTIOUS O.T

RECOVERY (A.C.)8.30 X 6.07

RECOVERY (A.C.)8.30 X 6.33

RECOVERY (A.C.)8.30 X 4.95

RECOVERY (A.C.)8.22 X 7.53

OPERATION THEATRE 48.38 X 7.53

(A.C.)

OPERATION THEATRE 3

9.95 X 3.98(A.C.)

OPERATION THEATRE 2

8.30 X 6.38

(A.C.)

OPERATION THEATRE 1

8.30 X 5.09

(A.C.)

T - 300 mm

R - 150 mm

T - 300 mm

R - 150 mm

T - 3

00

m

m

R - 1

50

m

m

T

- 3

0

0

m

m

R

- 1

5

0

m

m

W3W3

W3

W3

GLAZING

GLAZING

W3 W3

W1W1

W1

W1

W1

W3

W3

W4

W4

W4

W4

GLAZING

+11.70M.

W2

W2

W2

W2

W

2

W

2

W2

W2

W3

W3

W1

W1

W3W3W3W3

W3 W3 W3 W3 W3W3

W3

W3

W3

W4

W3

W3

W1

WET

AREA

WET

AREA

WET

AREA

WET

AREA

W5

W6

W6

W6

W6

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

URINALS

tile drop

tile drop tile drop tile drop tile drop tile drop tile drop

HC

WC WC WC WC BATH

100MM THICK

BRICK WALL

100MM THICK

BRICK WALL

WC WC WC HC

BATH

tile drop tile drop tile drop tile drop tile drop

tile drop

GENERAL LADIES TOILET

8.22 X4.03M

GENERAL GENTS TOILET

8.22 X4.03 M

V V V V V

VV V V V V

V

V

V

V

HIS

HER

WC

WC

WC

tile drop

tile drop

P

L

A

T

F

O

R

M

U

R

IN

A

L

S

tile drop

tile drop

tile drop

W7

V4V4

V4

V4

V4

V4

W1

W1

W1

W1 W1

V4

V4

V4 V4 V4

V4

V4V4

V4 V4

V4 V4

W1 W1 W1W1

W1 W1 W1 W1 W1 W1

V5

W1

V5

W1

W1

V5

V5

V2

SH

AF

T F

OR

FIR

E

SP

RIN

KL

ER

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

EL

EC

TR

IC

AL

RIS

ER

RIS

ER

F

OR

L

V

SY

ST

EM

SH

AF

T F

OR

FIR

E

SP

RIN

KL

ER

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

EL

EC

TR

IC

AL

RIS

ER

RIS

ER

F

OR

L

V

SY

ST

EM

SHAFT FOR FIRE

SPRINKLER

RISER FOR

FIRE HYDRANT

ELECTRICAL

RISER

RISER FOR LV

SYSTEM

S

H

A

F

T

F

O

R

F

I

R

E

S

P

R

I

N

K

L

E

R

R

I

S

E

R

F

O

R

F

I

R

E

H

Y

D

R

A

N

T

E

L

E

C

T

R

I

C

A

L

R

I

S

E

R

R

I

S

E

R

F

O

R

L

V

S

Y

S

T

E

M

W1W1

V5

V4

V4

V4 V4

OPERATION THEATRE 58.38 X 3.90(A.C.)

OPERATION THEATRE 68.38 X 3.90(A.C.)

WALLS TO BE REMOVED

WALLS TO BE ADDED

4.41 x 3.58

DRAWING TITLE:-

THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR

WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH

WAS COMMISSIONED.

ACCEPTS NO RESPONSIBILITY FOR THIS

DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.

1. DRAWINGS SHALL BE READ AND NOT TO SCALED.

2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE

REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.

3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES

DRAWINGS.

CLIENT :-

KK ASSOCIATEELECTRICAL CONSULTANTS

EPICONS CONSULTANTS

STRUCTURAL CONSULTANTS

PROJECT TITLE :-

NASHIK MUNICIPAL

CORPORATION.

NMC BYTCO HOSPITAL

BUILDING IN S.NO.240(P) &

241(P) AT.VILLAGE DEOLALI

NASHIK,MAHARASTRA

ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]

DATE SCALE

DRWG NO:- LB-FP

1:100

REVISIONR-2

THIRD FLOOR PLAN

4-WASH BASINS ADDED

srcub sinkadded

opening is to bemade 3 x 1.2

sill at 1m

gran

ite p

latf

orm

gran

ite p

latf

orm

gran

ite p

latf

orm

RECOVERY

RECOVERY

RECOVERYRECOVERY

toilet added

5-SCRUB BASINS

FULL HEIGHTALUMINUM

PARTITION WITHGLASS WINDOW

ABOVE 3'

DUCT OPENINGTO BE CLOSE

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop tile drop tile drop tile drop tile drop tile drop

100MM THICK

BRICK WALL

100MM THICK

BRICK WALL

tile drop tile drop tile drop tile drop tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

tile drop

NEW ADDED A.C

wall to beconstruct

wall to beconstruct

sink

1 -KITCHEN SINK

2-WB WITH PLATFORM IN TOILET

Page 9: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

water cooler

water cooler

water cooler

water

cooler

CASULTY WARD

GROUND FLOOR PLAN

D D

V V V V V

V

V

VVV V

W1 W1 W1 W1

W1

W1

W3

W3

W3

W3

W3

W3

W3

W3

W3

W3

W3

W3

W3

W3W3

W4

V

V

V

V1

T - 300 mm

R - 150 mm

T - 300 mm

R - 150 mm

T - 300 m

m

R - 150 m

m

T - 300 mm

R - 150 mm

W3

RAMP SLOPE 1: 10

W3

LVL +0.00 M

-

GLAZING

W1

W4

W1

W3W3W3

W1

W1

W1

W3

W2

W2

W2

W

2

W2

PLINTH LEVEL

4.50

WET

AREA

WET

AREA

WET

AREA

W5

W6

W6

W6

W6

W6

52.2713

95.45

95.45

1

0

1

.

2

5

W1 W1

V2

V2

V2

W1

W7

W3

W7

W7

W3

W1

W3

V2

W3

W1 W1W1

V

W1 W1

W1 W1 W1 W1 W1

V

V

V

V

HIS

HER

WC

WC

WC

tile drop

tile drop

P

L

A

T

F

O

R

M

U

R

IN

A

L

S

tile drop

tile drop

tile drop

V

V

V

WC

WC

tile drop

HER

HIS

tile drop

PLATFORM

URINALS

WC

URINALS

tile drop

tile drop tile drop tile drop tile drop tile drop tile drop

HC

WC WC WC WC BATH

100MM THICK

BRICK WALL

100MM THICK

BRICK WALL

WC WC WC HC

BATH

tile drop tile drop tile drop tile drop tile drop

tile drop

GENERAL LADIES TOILET

8.22 X4.03M

GENERAL GENTS TOILET

8.22 X4.03 M

SHAFT FOR FIRE

SPRINKLER

RISER FOR

FIRE HYDRANT

ELECTRICAL

RISER

RISER FOR LV

SYSTEM

W9

V4

V4 V4V4 V4 V4

V4

V4V4

V4V4 V4 V4 V4

V4

V4

V4

V4

V4

V4

V4V4

V4

V4

V4

W3

SH

AF

T F

OR

FIR

E

SP

RIN

KL

ER

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

EL

EC

TR

IC

AL

RIS

ER

RIS

ER

F

OR

L

V

SY

ST

EM

SH

AF

T F

OR

FIR

E

SP

RIN

KLE

R

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

ELE

CT

RIC

AL

RIS

ER

RIS

ER

F

OR

LV

SY

ST

EM

S

H

A

F

T

F

O

R

F

I

R

E

S

P

R

I

N

K

L

E

R

R

I

S

E

R

F

O

R

F

I

R

E

H

Y

D

R

A

N

T

E

L

E

C

T

R

I

C

A

L

R

I

S

E

R

R

I

S

E

R

F

O

R

L

V

S

Y

S

T

E

M

V4

V4

V4

V4

W1

V5

V5

V5

V5

V5

W9

W9

W1

V5 V5 V5

PORCH

RADIAL RIBS

FRAMING FOR

DOME

EMERGENCY ENTRY

HELP DESK

DISPLAY BOARD

DISPLAY BOARD

WALLS TO BE REMOVED

WALLS TO BE ADDED

DRAWING TITLE:-

THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR

WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH

WAS COMMISSIONED.

ACCEPTS NO RESPONSIBILITY FOR THIS

DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.

1. DRAWINGS SHALL BE READ AND NOT TO SCALED.

2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE

REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.

3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES

DRAWINGS.

GROUND FLOOR PLANS

CLIENT :-

KK ASSOCIATEELECTRICAL CONSULTANTS

EPICONS CONSULTANTS

STRUCTURAL CONSULTANTS

PROJECT TITLE :-

NASHIK MUNICIPAL

CORPORATION.

NMC BYTCO HOSPITAL

BUILDING IN S.NO.240(P) &

241(P) AT.VILLAGE DEOLALI

NASHIK,MAHARASTRA

ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]

DATE SCALE

DRWG NO:- G-FP

1:100

REVISION ALL EXTERNAL WALLS 230MM THICK.

ALL INTERNAL WALLS 150MM THICK.

CASUALTY

BED

Registration

granite platform

granite platform

tile drop

tile drop

CASUALTY

MEDICAL

OFFICER

granite platformgranite platform granite platform

HIV CONSULTING

ROOM

granite platform

COLLECTION

ROOM

granite platform

granite platform

COLLECTION

ROOM

COLLECTION

ROOM

HISTOPATH

HISTOPATH

HISTOPATH

W3

granite platform

Aluminumpartition

wall demolish forwindow opening

wall demolishfor dooropening

wall demolish forwindow opening

polycarbonatesheet above

gran

ite p

latf

orm

glass openingprovided

glass openingprovided

granite platformwith wash basin

provided

wall to beconstruct

toilet to beconstruct

aluminum door

collapsible gate

wall to bedemolish

wall to beconstruct

wall to beconstruct

Aluminumpartition

WINDOW CLOSEDBY ACP CLADDING

wall to beconstruct

Aluminumpartition

Aluminumpartition

Aluminumpartition

Aluminumpartition

door

9 -WASH BASINS ADDED

2-SCRUB BASINS

PLATFORMSWITHWASH

BASINSADDED

polycarbonatesheet above

polycarbonatesheet above

polycarbonatesheet above

NEW ADDED A.C

2.00

2.00

5.70

6.0868

colla

psib

le g

ate

2.00 2.00

5.70

6.3583

RAMP ENTRY

RAMP ENTRY

UP

UP

2.2

2

1.5

8

4.01

0.6

0

5.39

0.9

91

.0

00

.9

91

.0

00

.9

91

.0

00

.9

9

2.50

0.6

00

.9

0

0.60

0.60

4.15

8.22

2.14

0.60

4.11

1.11

0.60

3.25

0.45

2.74

1.01

1.552.74

1.62

2.74

1.62

2.66

7.13 1.73

2.16

2.16

1.01

2.74

1.01

2.16

3.28

1.62

0.6

0

1.5

20

.5

0

1.1

5

0.60

1.9

5

0.75

0.6

0

1.30

1.48

1.0

0

0.9

5

1.9

5

0.75

0.6

0

0.4

80

.6

0

0.98

1.9

5

1.2

9

0.61

1.50

1.50

0.6

0

0.9

0

1.43

0.6

0

1.9

5

0.75

0.45

0.3

8

1.80

0.9

0

1.9

5

0.75

1.80

0.6

2

0.60

1.0

2

1.95

0.7

5

0.4

5

1.8

5

0.60

1.62

1.4

5

0.6

0

1.9

5

0.75

0.45

1.50

0.9

0

1.9

5

0.75

1.80

0.6

0

0.9

2

0.60

1.9

5

0.75

1.50

0.9

3

1.95

0.7

5

0.4

5

0.4

8

0.6

8

0.75

1.5

0

3.50

1.2

0

0.7

7

1.720.93

1.9

5

0.9

8

0.75

0.60

0.93

0.48

1.6

2

3.25

1.6

2

2.1

6

2.2

1

3.1

8

3.2

31

.0

5

2.7

0

0.80

1.9

1

1.95

0.7

5

1.95

0.7

5

1.95

0.7

5

0.9

01

.0

2

0.8

9

1.9

5

1.50

0.75

1.4

0

1.5

0

1.5

7

1.2

0

2.72

0.5

9

1.83 0.60

1.3

11

.2

0

1

.2

0

0

.6

0

1

.9

9

0

.9

1

2

.8

3

0

.4

5

1

.

4

1

1

.0

8

1

.0

4

1

.2

0

0

.6

0

1

.

2

0

0

.

6

0

1

.

2

3

0

.

6

2

1

.2

2

0

.6

0

1

.2

0

0

.7

2

0

.8

8

0

.7

5

0

.9

1

1

.2

0

0

.6

0

0

.8

0

1

.3

5

0

.6

0

1

.7

2

0

.6

5

1

.4

7

0

.6

0

8.75

1.3

5

0.6

0

3.20

1.4

2

1.05

2.28 2.14

0.6

3

3.53

0.60

2.1

4

4.83

0.6

0

6.30

0.4

5

0.4

84

.2

8

1.1

00

.6

00

.6

0

3.53

3.03

6.88

0.98 0.98 0.98 0.98

2.07

1.5

1

0.8

50

.6

2

1

.9

8

0

.

7

5

0.8

0

1.28

2.7

9

1

.

2

7

0

.

6

0

2

.3

6

0

.4

9

1

.

3

5

0.6

5

0.76

0.76 0.62

0.75 2.00 0.75

1.9

5

0.5

6

1.80 2.07

0.38

1

.3

0

2.9

5

1.07 0.63

1.7

5

2.3

5

1.692.230.840.910.961.030.56

3.7

1

0.56 1.03 0.59 0.94 0.91 0.96 0.74

1.50 1.34

1.6

9

0.75

1.9

5

0.6

0

1.95

1.1

1

1.58

0.74

2.7

0

3.28

4.6

9

2.1

31

.5

8

1.2

7

1.23

2.1

11

.5

2

0.9

3

0.60

0.6

0

0.6

0

2.19

4.8

0

2.251.20

0.9

5

2.0

7

2.19

1.81

1.48

0.7

3

0.67

1.2

7

1.23

0.8

3

0.7

9

1.21

0.7

1

1.18

0

.7

5

1

.2

0

1

.2

0

1

.6

5

2 NO TOILET ADDED

W.B

W.B

sink sinksink

sink

sink

sink

sink

sinkW.B

W.B

W.B

sink

W.B

W.B

9 -SINK ADDED

0.6

1

1.46

w

a

te

r

ja

r

granite platform withwash basin

granite platform withwash basin

granite platform withwash basin

Rollingshutter with

graniteframe

Page 10: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

4.5000

D1

TD TD

TD

TD

TD

TD

TD

TD

TD

RD

RD

TD

TD

TD

FD

FD

FD

FD

TD

TD

TD

FD

FD

RD

D1

D1

D1

T - 300 mm

R - 150 mm

T - 3

00

m

m

R - 1

50

m

m

T - 300 mm

R - 150 mm

TD

TD

TD

T

- 3

0

0

m

m

R

- 1

5

0

m

m

D1

D1

TD

TD

RD

0.8

5

WET

AREA

WET

AREA

WET

AREA

WET

AREA

TD1

TD1

TD1

TD1

7.18

6.00

6.8528

95.01

0.8

5

7.18

95.45

95.45

95.01

95.4594.05

LVL -8.40M

LOWER BASEMENT FLOOR PLAN

1

0

1

.

2

5

TD

TD

TD

TD

D3

0.15

RS

0.6

3

0.9

0

5.75

DRAWING TITLE:-

THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR

WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH

WAS COMMISSIONED.

ACCEPTS NO RESPONSIBILITY FOR THIS

DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.

1. DRAWINGS SHALL BE READ AND NOT TO SCALED.

2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE

REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.

3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES

DRAWINGS.

LOWER BASEMENT FLOOR PLAN

CLIENT :-

KK ASSOCIATEELECTRICAL CONSULTANTS

EPICONS CONSULTANTS

STRUCTURAL CONSULTANTS

PROJECT TITLE :-

NASHIK MUNICIPAL

CORPORATION.

NMC BYTCO HOSPITAL

BUILDING IN S.NO.240(P) &

241(P) AT.VILLAGE DEOLALI

NASHIK,MAHARASTRA

ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]

DATE SCALE

DRWG NO:- LB-FP

1:10027-08-16

REVISIONR-2

65- FOUR WHEELERS

207- TWO WHEELERS

wall to beconstruct

wall to beconstruct

Page 11: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,

0.23

3.76

8.22

SOILED BINS

0.60

2.02

1.00

2.10

2.00 0.61

2.10

0.75

1.24

6.30

5.10

7.10

7.03

3.78

4.18

1.20

3.48

0.60

4.23

1.50

3.18

3.04

5.60

1.20

6.48

1.20

0.60

1.20

8.40

5.31

1.20

1.20

7.03

0.60

5.40

1

.2

0

3

.3

2

0

.6

0

1.35

1

.5

0

LVL -4.20 M

UPPER BASEMENT FLOOR PLAN

0.23

3.76

8.22

SOILED BINS

WET AREA

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

TD TD

TD

TD

TD

TD

TD

TD

TD

TD

RD

RD

TD

TD

TD

FD

FD

FD

FD

TD

TD

TD

FD

FD

RD

TD

TD

TD

D3

D3

D3

D3 D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D4 D4

D4

D4

TD

TD

RD

D1

D3

D3

RD

WET

AREA

WET

AREA

V1

V1

V1

V1

V1

V1

V1

V1 V1

V1

V1

V1V1 V1

V1

V1

V1

V1

V1

V1

V1

V1

V1

V1

V1V1

V1V1

V1

V3

TD1

TD1

TD

1.48

4.5000

RAMP SLOPE 1: 10

RAMP SLOPE 1: 10

+100.80Lvl.

7.5000

52.2713

7.5000

95.45

95.45

95.4594.05

98.25

100.25

7.5000

1

0

1

.

2

5

7.4960

1.18

D1

D1

TD

TD

TD

TD

W2

W2

W2

W2

4.50

0.15

W1

W1

W1

W1

W1 W1

W1 W1

W1

W1

D4

D4

SUNK -0.2M

S

U

N

K

-

0

.

2

M

D1

D

HC

1.45X0.94M

WC

1.45X0.94M

WC

1.45X0.94M

WC

1.45X0.94M

BATH

2.46X1.50M

tile drop

D1

D

WC

1.45X0.95 M

WC

1.45X0.95 M

WC

1.45X0.95 M

WC

1.45X0.95 M

HC

1.40X1.27 M

tile drop

FLOOR MOUNTED WC

FLOOR MOUNTED WC

FLOOR

MOUNTED WC

FLOOR MOUNTED WC

C

D

tile drop

D7

D7

D7

D7

D7

D7

D7

D7

D7

SHAFT FOR FIRE

SPRINKLER

RISER FOR

FIRE HYDRANT

ELECTRICAL

RISER

RISER FOR LV

SYSTEM

URINALS

D

tile drop

tile drop tile drop tile drop tile drop tile drop tile drop

HC

100MM THICK BRICK WALL

WC WC WC WCBATH

100MM THICK

BRICK WALL

100MM THICK

BRICK WALL

D7 D7 D7 D7 D7

WC WC WC HC

BATH

tile drop tile drop tile drop tile drop tile drop

tile drop

D7D7

D7 D7

GENERAL LADIES TOILET

8.22 X4.03M

GENERAL GENTS TOILET

8.22 X4.03 M

tile drop

T - 300 mm

R - 150 mm

SH

AF

T F

OR

FIR

E

SP

RIN

KLE

R

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

ELE

CT

RIC

AL

RIS

ER

RIS

ER

F

OR

LV

SY

ST

EM

T - 300 m

m

R - 150 m

m

SH

AF

T F

OR

FIR

E

SP

RIN

KLE

R

RIS

ER

F

OR

FIR

E

HY

DR

AN

T

ELE

CT

RIC

AL

RIS

ER

RIS

ER

F

OR

LV

SY

ST

EM

T - 300 mm

R - 150 mm

S

H

A

F

T

F

O

R

F

IR

E

S

P

R

I

N

K

L

E

R

R

I

S

E

R

F

O

R

F

IR

E

H

Y

D

R

A

N

T

E

L

E

C

T

R

I

C

A

L

R

I

S

E

R

R

I

S

E

R

F

O

R

L

V

S

Y

S

T

E

M

V4 V4

V4

V4

V4

V4V4

V4

V4

W1

W1W1

1.20 0.93 1.20 0.93 1.20 0.93

V3

V3

D3

D3

DRAWING TITLE:-

THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR

WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH

WAS COMMISSIONED.

ACCEPTS NO RESPONSIBILITY FOR THIS

DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.

1. DRAWINGS SHALL BE READ AND NOT TO SCALED.

2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE

REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.

3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES

DRAWINGS.

CLIENT :-

KK ASSOCIATEELECTRICAL CONSULTANTS

EPICONS CONSULTANTS

STRUCTURAL CONSULTANTS

PROJECT TITLE :-

NASHIK MUNICIPAL

CORPORATION.

NMC BYTCO HOSPITAL

BUILDING IN S.NO.240(P) &

241(P) AT.VILLAGE DEOLALI

NASHIK,MAHARASTRA

ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]

DATE SCALE

DRWG NO:- LB-FP

1:100

REVISIONR-2

UPPER BASEMENT FLOOR PLAN

wall to beconstruct

wall to beconstruct

WALLS TO BE ADDED

Page 12: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 13: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 14: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 15: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 16: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 17: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 18: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 19: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 20: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 21: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 22: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 23: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 24: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 25: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 26: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 27: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 28: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 29: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,
Page 30: Nashik Municipal Corporation, Nashik Management, Operation … · 2019-11-21 · Nashik Municipal Corporation, Nashik Management, Operation and Maintenance of New J.D.C Bytco Hospital,