naraingarh sugar mills limitednromoef.gov.in/smpr/08042015/40.pdf · recirculation water. 08...

12
Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. Naraingarh Sugar Mills Limited Village –Banondi .P.O. Shahjadpur ,Tehsil-Naraingarh Distt. Ambala, (Haryana) __________________________________________________________ Six Monthly Progress Reports for the Period of Six Month from July-2014 to December-2014. Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . EC Ref.No. SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. Point wise Reply of the conditions stipulated in Environmental Clearance vide letter for Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana STATUS OF COMPLIANCE CONDITIONS:- S. No. POINTS (A) SPECIFIC CONDITIONS. STATUS OF COMPLIANCE. (REPLY) 01 Efforts shall be made to reduce PM 2.5, PM10 levels in the ambient air and a time bound action plan shall be submitted .As proposed Electrostatic precipitator (ESP) along with stack of adequate height shall be provided to boiler to control particulate emission with in 100mg/NM3 .at no time , the emission level shall go beyond the Under Compliance and We will be adequate measures like water sprinkling on haul roads and unpaved areas being under taken to reduce the PM2.5 and PM 10 level below ambient air quality standards. ESPs will be installed to

Upload: vudat

Post on 14-May-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

Naraingarh Sugar Mills Limited Village –Banondi .P.O. Shahjadpur ,Tehsil-Naraingarh

Distt. Ambala, (Haryana) __________________________________________________________

Six Monthly Progress Reports for the Period of Six Month from July-2014 to December-2014.

Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . EC Ref.No. SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. Point wise Reply of the conditions stipulated in Environmental Clearance vide letter for Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana

STATUS OF COMPLIANCE

CONDITIONS:- S. No. POINTS (A) SPECIFIC

CONDITIONS. STATUS OF COMPLIANCE. (REPLY)

01 Efforts shall be made to reduce PM 2.5, PM10 levels in the ambient air and a time bound action plan shall be submitted .As proposed Electrostatic precipitator (ESP) along with stack of adequate height shall be provided to boiler to control particulate emission with in 100mg/NM3 .at no time , the emission level shall go beyond the

Under Compliance and We will be adequate measures like water sprinkling on haul roads and unpaved areas being under taken to reduce the PM2.5 and PM 10 level below ambient air quality standards. ESPs will be installed to

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

prescribed standards . In the event of failure of any pollution control system adopted by the unit, the respective unit shall not be restarted until the control measures are rectified to achieve the desired efficiency. Efficiency of pollution control device shall be monitored regularly; Stack monitoring report shall be submitted to the regional office MOEF. .

minimize the particulate emissions.

02 The National Ambient Air Quality Standards issued by Ministry vide G.S.R.No. 826 (E) dated 16th November-2009 shall be followed.

We will follow the National Ambient Air Quality Emission Standards issued by the Ministry vide G.S.R. No. 826(E) dated 16th November, 2009.

03 In plant, Control measures for checking fugitive emission from all the vulnerable sources shall be provided, fugitive emission shall be control by providing closed storage, closed handling & conveyance of chemicals/ materials, multi cyclone separator and water sprinkling system shall be provided at loading areas to control dust emission. Fugitive emission in the work Zone environment, production area, raw materials storage area etc. shall be regularly monitored and recodes shall be marinated. The emission shall confirm to the limits prescribed by Haryana State Pollution Control Board (HSPCB)

Under compliance ,same will be point no.01

04 Pucca approach road to project shall be constructed prior to commencing construction activity of sugar mill so as to avoid fugitive emission.

Complied.

05 The gaseous emission from DG set shall be dispersed through adequate stack height as per CPCB guideline .Acoustic enclosure shall be Provided to DG sets to mitigate the Noise Pollution.

As per CPCB guidelines, adequate stack height to all the DG sets will be provided, acoustic type of DG sets will be used to mitigate the noise pollution

06 The Company shall upload the status of compliance of the stipulated environmental clearance condition, including results of monitored data on its website and shall update the same periodically .It shall simultaneously be sent to the respective R.O. of MOEF, CPCB and HSPCB. The level of PM2.5, PM, 10So2, NOX in Ambient Air shall be monitored and displayed at a convenient location near the main Gate of the company and at important public places.

Same shall be complied with. The ambient air quality monitoring was carried out and results are enclosed as Annexure-1

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

07 Total fresh water requirement from ground water (Borewell) shall not exceed 970m3/day for this project and prior permission for drawl of water shall be obtained from concerned authorities.

The fresh water requirement is estimated to be 970 m3/day which will be met by ground water & recycled water. And we will use our existing borewell and recirculation water.

08 Effluent from sugar unit shall be treated in the effluent treatment plant comprising neutralization tank followed by two stage aeration system .ETP treated water should be used for farming /garding within industry premises. Domestic sewage shall be transferred into aeration tank for treatment.

Under Complied and Same will be Implemented.

09 As proposed, no effluent from sugar plant shall be discharged outside the premises and zero discharge shall be adopted.

Unit will operate on Zero Discharge concept.

10 Process effluent /any waste water shall not be allowed to mix with storm water. Storm water drain shall be passed through guard pond.

Separate storm water drains via guard pond.

11 Adequate number of ground water quality monitoring stations by providing piezometers around the project area should be set up. Sampling and trend analysis monitoring must be made on monthly a basis and report submitted to SPCB and this ministry. The ground water quality monitoring for pH,BOD,COD,Sulphate and TDS should be monitord ,sampling and trend analysis monitoring must be made on monthly basis and report submitted to RO Chandigarh and HSPCB.

Ground water samples from different locations were collected and results are attached as Annexure-2

12 Baggase storage shall be done in such a way that it does not get air born or fly ash around due to wind.

Under compliance ,same will be point no.01

13 Boiler ash shall be stored separately as per CPCB guideline so that it shall not adversely affect the air quality, becoming air born by wind or water regime during rainy season by flowing along with the storm water. Direct exposure of works to fly ash & dust shall be avoided baggase ash and coal ash shall be stored separately.

Same shall be Complied after Expansion cum modernization of existing sugar mills from 2500TCD to 5500TCD.

14 Till the plant is ready for expansion the project proponent have to ensure for compliance of pollution control norms stipulated in consent to operate for existing unit.

Complied .Consent to operate for the year 2014-2015 is attached.

15 Fire fighting system shall be as per norms and cover all areas.

Same shall be Complied before Expansion cum modernization of existing sugar mills from 2500TCD to 5500TCD.

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

16 Risk Assessment shall be carried out to assess the fire and explosion risk.

Complied.

17 Occupational health surveillance programme shall be undertaken as regular exercise for all the employees. The first aid facilities in the occupational centre shall be strengthened and the regular medical test records of each employee shall be maintained separately.

Occupational health surveillance programme will be taken as a regular exercise for all the employees and their Records maintained.

18 Dedicated parking facility for loading and unloading of materials shall be provided in the factory premises. Unit shall develop and implement good traffic management system for their incoming and outgoing vehicles to avoid congestion on the public road.

Same shall be Complied with all parking facility for loading and unloading of materials and Shall be avoid congestion on the public road

19 Green belt shall be developed in 33% of plot area to mitigate the effects of fugitive emission all around the plant as per CPCB guideline in consultation with the local DFO.Thick greenbelt with suitable plant species shall be developed around the proposed distillery to mitigate the odour problem.

Complied. We have already developed a green belt around 35% of the total land area.

20 All the commitments made during the public hearing /Public consultion meeting held on 10th april, 2013shall be satisfactorily implemented and adequate budget provision shall be made accordingly.

Same shall be complied with.

21 Provision shall be made for the housing for construction labour with in the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobil sewage treatment plant, safe drinking watr,medical health care, crèche etc. The housing may be in the form of temporary structure to be removed after the completion of the project.All the construction wastes shall be managed so that there is no impact on the surrounding environment.

Same shall be complied with.

22 Only bagasse /Biomass should be used as fuel. Not to use wood logs, coal as fuel and no other fuels should be used.

Same shall be complied with.

23 No ground water shall be drawn for the power plant at any stage. Treated waste water shall be used for sugar cane seed farm/green belt development. There should be no waste water discharge from the plant.

Same shall be complied with.

24 The infrastructure of transport road linking to the nearest main road shall be improved and

Same shall be complied with.

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

maintained by proponent. B.

GENERAL CONDITION

1 The project authorities shall stricty adhere to the stipulations made by the HSPCB.

Noted and shall be complied with.

2 No Further expansion or modification in the plant shall be carried out without prior approval of SEIAA/MOEF. In case of deviation or alteration in the project proposed from those submitted to this ministry for clearance, it fresh reference shall be made to ministry to assess the adequacy of condition imposed and to add additional environment protection measures required, if any.

No further expansion or modifications in the plant will be done carried out without prior approval from SEIAAand /MOEF (The Ministry of Environment and Forests Govt.of India)

3 The Locations of Ambient air quality monitoring station shall be decided in consultation with HSPCB and it shall be ensured that at least one station is installed in the up wind and downwind direction as well as where maximum ground level concentration are anticipated.

Same shall be complied with.

4 The overall noise levels in and around the plant area shall be kept well within the standards by providing noise control measure including acoustic hoods ,silencers, enclosures etc. on all sources of noise generation. The ambient noise level shall conform to the standards prescribed under Environment (Protection) Act-1986.(75 bDA (day time) and 70 dBA(Night) .

Same shall be complied.The Same shall be complied. Following Measure shall be adopted. 1.0 Acoustic enclosure for Turbine & D.G.sets would be used. 2.0 Green belt development (plantation of dense trees across the boundary) will help in reducing noise levels in the plant as a result of attenuation of noise generated due to plant operations, and Transportation. 3.0 Earmuffs would be used while running the equipments of the plant. The noise level monitoring was done and results are enclosed as Annexure-3 & 4

5 The Company shall harvest rainwater from the roof-tops of the building and storm water drains to

Rainwater would be utilized to recharge the underground water

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

recharge the ground water and use the same water for the process activities of the project to conserve fresh water.

source through scientifically designed rain water harvesting system

6 The company shall obtain authorization for collection, sttorge and disposal of hazardous waste under hazardous waste rules, 2008 and its amendment time to time and prior permission from SPCB shall be obtained for disposal of solid /hazardous waste including boiler ash.

Noted and shall be complied with.

7 During transfer of materials, spillages shall be avoided and garland drain be constructed to avoid mixing of accidental spillages with domestic wastewater and stom water drain.

There will be “Zero Effluent Discharge “from the proposed project.

8 Usage of personnel protection equipments by all employees /workers shall be ensured.

Personnel Protection equipments would be provided

9 Training shall be imparted to all employees on safety and health aspects of chemical handing, pre-employment and routine periodical medical examination of all employees shall be undertaken on regular basis. Training to all employees on handling of chemicals shall be imparted.

Yes, We will comply as per norms.

10 The company shall also comply with all the environmental protection measures and safeguards proposed in the project report submitted to ministry. All the recommendations made in the EIA/EMP in respect of environment management, risk mitigation and public hearing relating to the project shall be implemented.

We ensured that safeguard proposed will adopted.

11 Corporate Environment and social responsibility (CSER) shall be laid down by the project proponent (2% shall be earmarked) as per guideline of MOEF, GOI office memorandum no. J-11013/14/41/2006-IA.II (I) dated 18.05.2012 and Ministry Corporate Affairs, GOI, Notification dated 27/02/2014. A separate audit statement shall be submitted of the in the compliance. Environment related work proposed to be executed under this responsibility shall be undertaken simultaneously. The Project proponent shall select and prepare the list of the work for implementation of CSER of its own choice and shall submit the same before the start of construction.

Company shall take following CSR activities & development of Socio economic condition of the area: 1.0 Converting the kuccha road being constructed leading to plant site. 2.0 Funding plantation programme in the surrounding villages. 3.0Arrangement of medical camps especially for family planning in the villages of the study area.

12 The company shall undertake eco-development measures including community welfare measures in the project area for the overall improvement of the

Agreed and will comply the same.

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

environment. 13 A separate environment management cell equipped

with full fledged laboratory facilities shall be set up to carry out the Environmental Management and monitoring functions.

A separate Environmental Management Cell equipped with full fledged laboratory Facilities shall be set up which will be headed by General Manager Production.

14 As proposed the company shall earmark Rs. 15Crores and Rs. 1.00 Crores toward capital cost and recurring cost per annum to implement the conditions stipulated by the SEIAA/MOEF and SPCB.The funds so earmarked for environment management /pollution control measures shall not be diverted for any other purpose.

As proposed fund invested.

15 A copy of the clearance letter shall be sent by the project proponent to concerned panchayat .Zila Parisad /Municipal Corporation .unban local body and the local NGO. If any from suggestions/ representations, if any were received while processing the proposal.

Shall be complied. Same has been sent to the authorities as required

16 The Project proponent shall also submit six monthly reports on the status of compliance of the stipulated environmental clearance including results of monitored data (both in hard copies as well as by email) to SEIAA Haryana and zonal officer of CPCB and HSPCB.a copy of environmental clearance and six monthly compliance status report shall be posted on the website of the company.

Shall be complied. In our website.www.naraingarhsugar.com

17 The environmental statement for each financial year ending 31st march in form-V as is mandated shall be submitted to HSPCB,shall alos put on website of the company along with the status of compliance of environmental clearance and shall also to the Chandigarh office of moef by email.

Shall be complied.

18 The project proponent shall inform the public that the project has been accorded environment clearance by Ministry and copies of clearance letter are available with the SPCB /committee and may also see at website of SEIAA. This shall be advertised within seven days from the that date of issue of the clearance letter at one least in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of locality concerned and a copy of the same shall be in forwarded to the concerned regional office of the ministry.

Complied.

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

19 The project authorities shall inform the regional

office as well the ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of start of the project.

Same shall be complied with.

20 The SEIAA may revoke or suspend the clearance, if implementation of any of the above condition is not satisfactory.

Agreed.

21 The SEIAA reserves the right to stipulate additional condition ,if found necessary .The company in a time bound manner will implement these condition s.

Agreed.

22 The above conditions will be enforced ,inter-alia under the provision of water (Prevention & control of pollution ) act,1974 , Air (Prevention & Control of Pollution ) Act,1981,the Environment (Protection Act,1986 , Hazardous waste (Management ,Handling and Trans boundary ) rules,2008 and the public liability insurance Act, 1991, along with their amendment and rules.

Shall be Complied.

For Naraingarh Sugar Mills Limited (Auth. Signatory)

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

Annexure-I

Detailed Ambient Air Quality Monitoring Results (24-hourly Average)

S. No.

Date DD/MM/YY

L. No. Code

Location

PM 10

(g/m3) PM 2.5

(g/m3) SO2

(g/m3) NO2

(g/m3) CO (mg/m3)

1. 15/12/2014 AQ1 At Project Site (NSM-Factory)

74 38 16 21 1.0

2. 15/12/2014 AQ2 Shehzadpur

78 38 19 20 0.91

3. 15/12/2014 AQ3 Akberpur Village

69 36 18 19 0.82

4. 16/12/2014 AQ4 Bichpdi Village

68 37 17 21 0.7

5. 16/12/2014 AQ5 Ramgarh Village

70 40 19 21 0.8

6. 16/12/2014 AQ6 Kurali Village

71 44 18 20 0.8

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

Annexure-II

Ground Water Quality Monitoring Results. S. NO

Test Parameters

NSM Factory

Shehzad pur

Akberpur Village

Bichpdi Village

Ramgarh Village

Kurali Village

01 pH 7.12 7.2 7.34 7.44 7.64 7.31

02 Colour ( Hazen) <5.0 <5.0 <5.0 <5.0 <5.0 <5.0

03 Odour Unobjectionable

04 Taste Agreeable

05 TDS (mg/l) 460 581 514 506 394 364

06 Chloride as Chloride (mg/l)

44 64 56 60 36 24

07 Calcium as CaCO3 (mg/l)

42 61 74 102 94 84

08 Magnesium as CaCO3 (mg/l)

34 41 56 56 52 86

09 Total Alkalinity as CaCO3 (mg/l)

102 114 96 117 106 110

10 Sulphate as SO4 (mg/l)

22 26 29 30 24 26

11 Phosphate as PO4 (mg/l)

0.38 0.54 0.31 0.56 0.52 0.62

12 Silica as SiO2 (mg/l)

0.08 0.04 0.04 0.12 0.07 0.04

13 Iron as Fe (mg/l) 0.04 0.16 0.04 0.10 0.12 0.12

14 Total Hardness as CaCO3 (mg/l)

130 316 241 290 188 147

15 TSS (mg/l) <5.0 <5.0 <5.0 <5.0 <5.0 <5.0

Water Samples were collected on 15/12/2014 to 16/12/2014

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

Annexure-III

Physical-Chemical Characteristics of Soil in the Study Area

S. No. Parameters Unit

Soil Monitoring Locations NSM

Factory Shehzad

pur Akberpur

Village Bichpdi Village

Ramgarh Village

Kurali Village

1 pH - 8.6 7.41 7.8 7.6 8.1 7.7

2 Conductivity µmhos/cm 194 212 179 214 180 174

3 Bulk Density gm/cm 1.12 1.1 1.1 1.0 1.2 1.12

4 Soil Porosity % 36 30 34 46 32 36

5 Permeability cm/sec 0.06 0.06 0.09 0.09 0.08 0.09

6 Water Holding Capacity % 30 32 26 31 31 26

7 Organic Carbon % 4.6 5.1 4.1 4.4 4.6 4.1

8 Cation Exchange Capacity

meq/100 gm 16.6 14.2 12.6 16.2 14.2 12.4

9 Nitrogen µg/g 74.21 64.21 60.13 61.48 61.30 66.10

10 Phosphorous as P µg/g 19.2 21.4 21.4 28.2 24.6 21.6

11 Iron as Fe gm/kg 0.065 0.077 0.080 0.08 0.080 0.080

12 Lead as Pb gm/kg BDL BDL BDL BDL BDL BDL

13 Sodium µg/g 41.4 67.6 62.2 61.0 64.2 62.2

14 Potassium µg/g 116.48 112.4 124.2 108.4 112.4 121.6

15

Texture a. Sand b. Silt c. Clay

% % %

27 34 30

24 44 40

28 46 36

31 34 39

34 40 34

28 44 37

Source: Soil samples were collected by us on 15/12/2014 to 16/12/2014.

Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014.

Annexure-IV

Ambient Noise Levels Monitoring Results.

(Based on On-site Noise Monitoring)

Location

Code

Locations

Leq (dBA) Standard Limits (Leq dB (A))

Day Night Daytime Night Time NQ1 At Project Site

(NSM-Factory) 72.4 64.6 Industrial –

75 Commercial/Mixed – 65 Residential/Rural – 55 Sensitive - 50

Industrial – 70 Commercial/Mixed – 55 Residential/Rural – 45 Sensitive - 40

NQ2 Shehzadpur

64.2 59.4

NQ3 Akberpur Village. 64.2 52.8

NQ4 Bichpdi Village 62.4 55.6

NQ5 Ramgarh Village. 60.6 52.2

NQ6 Kurali Village

62.4 50.4

Noise Monitoring done on the 15/12/2014 to 16/12/2014. Day Time – 6:00 AM – 10.00 PM Night Time – 10:00 PM – 6:00 AM

Area category: I-Industrial, C-Commercial, R-Residential, S-Silence zone Day time: 6.00 a.m. to 10.00 p.m. Night time: 10.00 p.m. to 6.00 a.m.

Permissible ambient noise standards in dB(A): Industrial Area : Day time: 75, Night time: 70 Commercial Area : Day time: 65, Night time: 55 Residential Area : Day time: 55, Night time: 45

Silence Zone : Day time: 50, Night time: 40