  • MOKHTARFAWZYRESUME

    PERSONAL DATA Name: Mokhtar Fwazy Mokhtar Nationality: Egyptian. Marital Status: Married. Date of Birth: 14 December 1981 Military Service: Permanent Exempt. Address: Military buildings Block 47G flat 43 - Tosson Alexandria - Egypt Telephones: Home 002 03 5621728. Mobile 002 01159553304 - +96893913074

    Driver's Licenses: Private Egyptian License. Private Qatar License Private Oman License Private Bahrain License Engineers Syndicate ID: 31/00577. E-mail: m.fawzy@aici.com.eg eng_mokhtarfawzy@yahoo.com.

    CAREER OBJECTIVE A Challenging Position in a new atmosphere where I can have an opportunity to enhance and utilize my skills and broaden my knowledge about Construction Manager.

    EDUCATION Alexandria University Faculty of Engineering B.Sc. in Civil Engineering 2005- With Very good degree in airports and highways engineering project.

    LANGUAGES

    Arabic: Mother Tongue English: Good Reading, Writing and Speaking

    Computer Skills:

    Microsoft Office Self Study AutoCAD Self Study

    PERSONAL SKILLS

    Public relation & Cooperation.

  • MOKHTARFAWZYRESUME

    Dealing with people & ability to work within a team Self-motivated active work Ready to work anywhere anytime.

    TRAINING COURSES

    PADI SCUBA Diving [Open Water Diver] PCC AIRFIELED PAVING WORKSHOP [Transportation System Center, Al Musannah AB,

    Oman]. Confined Space Entry CourseTraining Institute Oman OSHA 30-Hour outreach training for the construction industry June 2013 Oman. Fire Protection System Training TREMCO Bahrain

    CAREER PROFILE & JOB DESCRIPTION

    As a Civil Construction

    PCC AIRFIELED PAVING (new asphalt/concrete taxi way using slip form paver, connecting it to the run way, And have paved and unpaved shoulders, edge lights and area/security lights. Fuel Tanks, storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.)

    Diving Engineer checking placing of (GRP Pipes Concrete Cubes Accropodes and Rocks)

    in the offshore Projects Placing and installation for GRP pipe lines of Intake and Discharge pipe lines for Elec. Power

    Planet.(Offshore works). Driving Piles and Sheet piles (temporary and permanent).(near shore and off shore works). Follow up of all sites work (Earth work - Insulation Concrete Repair Masonry work

    most of finishing activities Pavements). Flow up & create the method statement for the each activity. (MS) Reporting on construction activities within the framework of Daily / weekly / monthly reporting

    by site management. Follow up the inspection test Plan (ITP) for the project activities. coordinating between QC & Technical Office follow up progress of the daily, weekly, monthly,

    reports

    As a Quality Control & Quality Assurance Engineer QA/QC

    To assist the site engineer to inspect the permanent work, including delivered materials, in order to

    verify conformance with the contract quality requirements and the implementation of the company corporate quality system in accordance with ISO 9001:2000.

    Certifying all Quality Control Submittals and assure that they comply with the Contract Documents and Specifications

    Flow up & create Quality Control plan. (QCP) Flow up & create [Inspection Test Plan "ITP" for work complying with project specifications]. Follow up calibrations certificates & reports.

  • MOKHTARFAWZYRESUME

    COMPANIES PROFILE American International Contractors INC. AICI www.AICI.org August 2016 up to present..

    Project : Airlift Apron Alumsanah Air Base Oman Profession: Construction Manager. Owner: Royal Air Force at Oman RAFO. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $24.4 million Dollars). Summary of work: The Project consists of the construction of an aircraft parking apron of approximately

    164,000 square meters along with miscellaneous upgrades to the surrounding airfield and taxiways.

    The civil works of the project are construction of: Mobilization and De-mobilization including, Laydown Area, Batch Plant, material and

    equipment storage area, and all temporary facilities, structures, and utilities. Construction of the complete Airlift Apron (56000m3 of paving concrete). Construction of the Apron Access Road

    Archirodon Construction (overseas) CO. S.A. www.Archirodon.net July 2015 July206.

    Project : Salehia Airport development- 2000 pound capacity shelter - Salehia Air Base- EGYPT Profession: Construction Manager. Owner: EGYPTIAN AIR FORCES. Budget: (Total value of the project 100 million L.E). Summary of work:

    Construct of 2000 pond capacity of reinforced concrete shelters (30 Pcs) 4800m3 of RC Concrete 4500 m3 of PC laying concrete each, with 3600m3 of sand backfilling each, Taxi way paving concrete connected to the main Run way, industrial and technical building ( 24 PCs), admin building (49 Pcs ). Underground site utilities (elec., communication). American International Contractors INC. AICI www.AICI.org December 2014 June 2015..

    Project : United Kingdom Maritime Component Command ( UKMCC ), Mina Salman Navy Base, Bahrain

  • MOKHTARFAWZYRESUME

    Profession: Construction Manager. Owner: UK Navy. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $9.75 million Dollars). Summary of work: The base bid includes the construction of the FSU facility, Headquarter facility and all utility

    connection, Vehicle sunshade, entrance canopy, Gray water collection system, irrigation system and landscaping.

    The civil works of the project are construction of: Concretefoundation,SteelStructure,Roofandwallssandwichpanels,Rollupdoors,S.O.G.foralllevels,Gypsumandcementboardwalls,CMUwalls,Ceramictiles,fireratedandblastwindows,fireratedandblastdoors,Cambridgedoors,woodendoors,AcousticalCeiling,plasterandpaintingsystem,Roofmembraneandinsulationsystem,soundinsulationwalls,fireratedwalls,Mechanicalandelectricalsystemsservingbuildingandvehiclesmaintenanceoperation.

    American International Contractors INC. AICI www.AICI.org December 2013 December 2014.

    Project : FY11 Tactical Ramp/ Vehicle Maintenance Facility Al Udeid, Qatar Profession: Construction Manager. Owner: US Air Force USAF. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $42 million Dollars). The civil works of the project are construction of:

    Vehiclemaintenancefacilityisa2storiesbuildingconsistofrefuelingarea,officesarea,workshopareasandstorearea,worksinthisbuildingsummarizedasbelow:1. Concretefoundation.2. Steelstructure.3. Roofandwallssandwichpanels.4. Rollupdoors.5. S.O.G.foralllevels.6. Oilchangingpit.7. Overheadcrane.8. Mechanicalandelectricalsystemsservingbuildingandvehiclesmaintenanceoperation.9. Roads&parkinglot.10. Pavingsidewalk.11. CMUwalls12. Insulationforfireresistanceareas.13. Plasteringandpainting.14. Acousticalceilingsystem.15. Electricalsubstationbuildingandmechanicalchilleryard.16. Undergroundutilities(mechanicalandelectrical).

  • MOKHTARFAWZYRESUME

    TacticalRampis50,000M3ofconcreteforConcretepavementparkingapronwithcompressionsealantandpavementmarking.

    American International Contractors INC. AICI www.AICI.org September 2012 November 2013.

    Projects : (Airlift Ramp & Fuel Facilities) & ( Parallel Taxiway Extension) Al Musannah Air Base, Oman

    Profession: Construction Section Head. Owner: Royal Air Force at Oman RAFO. Consultant: US Army Corps of Engineer. Budget:(Total value of the project US $57 million Dollars).

    Archirodon Construction (overseas) CO. S.A. www.Archirodon.net

    January 2012 September 2012

    Project: Banha Power Station, 750 MW Combined Cycle Project, Kaluobya, Egypt. (CP 102 ) Profession: Construction Section Head. Intake and Discharge Structure ( Offshore Work ) Owner: West Delta Electricity Production Consultant: " Power Generation Engineering and Services Company PGESCO Budget: (Total value of the project US $50 million Dollars). The civil works of the project are construction of:

    The work for this Contract Package is subdivided: Site development, Underground Utilities, Power Generation Facilities, Auxiliary Facilities, Ancillary Facilities, Electrical and Mechanical Work. American International Contractors INC. AICI www.AICI.org June 2010 November 2011

    Project: Construction of a Close Air Support CAS Parking Apron DOHA QATAR Profession: Senior Site Engineer. Owner: United States Army - Air Force - Al Udeid Air Base. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $50 million Dollars). The civil works of the project are construction of:

    (new asphalt/concrete taxi way using slip form paver, connecting it to the run way, and have paved and unpaved shoulders, edge lights and area/security lights. One fuel storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.)

    Archirodon Construction (overseas) CO. S.A. www.Archirodon.net

    December 2009 June 2010

  • MOKHTARFAWZYRESUME

    Project: Tripoli Harbor Libya Break Water Reconstruction TRIPOLI LIBYA Profession: Marine Site Engineer. Owner: Libyan Maritime and Port Authority Consultant: "Royal Haskoning Consultant Engineering Budget: (Total value of the project US $300 million Dollars). The civil works of the project are construction of:

    (Pre-Cast Concrete Works for cubes 10t, 15t,20t & 30t Pre-Cast Concrete Work for Accropodes 6.3m3 & 9.00m3 Concrete Repair for parapet breakwater- Placing of rocks cla