Page 1: My Internship Experience Summary

My Internship Experience Summary

Nigeria Projects Organisation – Design Engineering Services

ExxonMobil Nigeria

Gbolahan DadaJanuary 2015

Page 2: My Internship Experience Summary

2

OUTLINE

Safety Moment

Introduction

Work Experience

Technical presentation

Questions

Conclusion

General feedback

Page 3: My Internship Experience Summary

3

Page 4: My Internship Experience Summary

4

INTRODUCTION

University of Lagos, Akoka

• BSc. Chemical Engineering (in view)

Internship Duration (6 months)

• Start Date: July 2014

• End Date: January 2015

Post-Internship

• Final year of my undergraduate program

• Student President of NSChE Unilag Charter (2015)

University of Lagos, Akoka

Page 5: My Internship Experience Summary

5

My EXPERIENCE

• Trainings

• Oil and Gas Industry Overview

• Basic Facilities Engineering Knowledge

• Field Trips

• Process Safety Design

• Equipment Design

• Process Simulation and Modelling

• Others

Page 6: My Internship Experience Summary

6

OIL & GAS INDUSTRY

OVERVIEW

• Upstream, Mid-stream and Downstream

• Hydrocarbon formation

• Reservoir discovery

• Exploration

• Field development

• Production and Extension of Field life

• Transportation

• Storage

Page 7: My Internship Experience Summary

7

BASIC FACLITIES

ENGINEERING KNOWLEDGE

• Material and Heat balance

• Thermodynamics

• Physical properties of Hydrocarbons

• Phase behaviour

• Vapour-Liquid Equilibrium

• Water-Hydrocarbon Phase behaviour

• Reading PFDs and P&IDs

Page 8: My Internship Experience Summary

8

Project Engagements

• Erha Calcium Nitrate Injection Project

• Erha North Phase II

Page 9: My Internship Experience Summary

9

FIELD TRIPS

• Niger Dock Fabrication yard, Snake Island

• Chenotech Fabrication yard, Port Harcourt

At Niger Dock, I saw the fabrication of several

piping members and pressure vessels, welding and

machining of other process equipment parts. I also

witnessed some Quality tests being carried out – hydrotest,

and radiography.

Page 10: My Internship Experience Summary

10

At Chenotech, I witnessed the fabrication and assembly of foam

makers for fire water safety systems

• Threading of carbon steel pipe with both manual and machining

methods

• Coating of Fire water lines

• Machining of curved pipes

• We also saw completely fabricated Pig traps and Fire water lines

We were allowed into their store, where we saw some process

devices such as various valves, gaskets, flow meter, flanges, etc.

Page 11: My Internship Experience Summary

11

Operational Facility Visit

On UBIT GH (Wellhead platform),

• Test Separator

• Manifold

• Well heads (Christmas trees)

• PSV

• Level gauge

• Bleed rings for Chemical injection/Corrosion inhibition

I was able to follow the production flow line on the platform’s

main deck, from the Christmas tree (receives subsea pipelines bearing

produced crude) to the Manifold (combines the crude being produced

from the 9 Wellheads) to the Test separator (that separates the crude

into two phases- gas and liquid), and then both the gas line and the

liquid line from the test separator continue to the Main Production

platform (UBIT PP) as pipelines.

Page 12: My Internship Experience Summary

12

Christmas trees

Wellhead conductors Piping around Test

Separator

Page 13: My Internship Experience Summary

13

Operational Facility Visit

On UBIT GP, I saw the following

• Control room

• Production separators

• Gas Generators

• Compressors

• Pigging system

• Instrument hydraulic lines

• Flare header

• PCV

• PSV

• Flanges (spectacle blind, blind, weld neck)

• Level gauges

• Production manifold

Some observations

• No DCS in the control room

• No multiphase meter

Page 14: My Internship Experience Summary

14

Page 15: My Internship Experience Summary

15

PROCESS SAFETY DESIGN

I studied API RP 14C, and performed Safety Analysis on

the following Process components

• Separators

• Pump

• Crude oil cooler

• Atmospheric tank

• Production flow line + Manifold

• Water injection line

• Compressor

Page 16: My Internship Experience Summary

16

EQUIPMENT DESIGN

I studied API RP 14E and API 12J, and carried out Design

calculations for the following using MS Excel:

• A pump (ECNIP)

• A separator (ENP2)

• Water injection line (ENP2)

• Gas lift line (ENP2)

• Methanol injection line (ENP2)

• Production flow line (ENP2)

Page 17: My Internship Experience Summary

17

Page 18: My Internship Experience Summary

18

Page 19: My Internship Experience Summary

19

PROCESS SIMULATION

I familiarized myself with Aspen HYSYS, and carried out

various simulations of;

• Condensate Separation Systems

• Dew point plant

• Refrigeration systems

• Corrosion inhibition models

Also attempted modelling of an Existing Production facility

(Erha FPSO)

Page 20: My Internship Experience Summary

20

OGPT training example

Page 21: My Internship Experience Summary

21

Page 22: My Internship Experience Summary

22

Page 23: My Internship Experience Summary

23

Page 24: My Internship Experience Summary

24

Page 25: My Internship Experience Summary

25

Page 26: My Internship Experience Summary

26

Page 27: My Internship Experience Summary

27

Page 28: My Internship Experience Summary

28

Page 29: My Internship Experience Summary

29

Page 30: My Internship Experience Summary

30

Page 31: My Internship Experience Summary

31

OPEX Analysis

Cost of Hydrate Inhibitors

MeOH = $1.10/lb and 80% EG = $3.10/lb

For continuous operation for 5 years

Methanol cost of 1431lb = $69 million

80% Ethyl Glycol cost of 4671lb = $634 million

Conclusion: Best choice is Methanol, because 80% EG is 9 times

more expensive.

Page 32: My Internship Experience Summary

32

Questions?

Page 33: My Internship Experience Summary

33

Appreciations

Design Engineering Services Manager – Okechukwu Opara

Project Manger – Soji Adekogbe

Facilities Supervisor(DES) – Emem Abraham

Mentor/DES Process Advisor – Syamsul Bahri

Buddies – Folu Babatunde; Tomi Osipitan; David Okuonrobo

Martin Mweemba; David Coym; Jos Ronde; Pat Maddigan and the entire DES team

ENP2 Lead Design Engineer – Helen Nabena

Others – Michael Ebiye, Perry Jas-Ikpeme, Dean Adatang, Edwin Okegbe,

Page 34: My Internship Experience Summary

34

Thank you

Page 35: My Internship Experience Summary

35

General

QUESTIONS & FEEDBACK