Multi-Channel Electronics. SCUBA2 MCE. 4 readout cards (RC) each reads 8 output columns through 14-bit 50MHz ADCs 1 address card (AC)= SQ1_bias addresses the [41] rows at  add ≤ 850kHz, set by L/R  frame ≤  add /41≈ 20kHz 1 clock card (CC) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Multi-Channel Electronics

Multi-Channel Electronics

Page 2: Multi-Channel Electronics

• 4 readout cards (RC) – each reads 8 output columns through 14-bit 50MHz ADCs

• 1 address card (AC)= SQ1_bias– addresses the [41] rows at add ≤ 850kHz, set by L/R

– frame ≤ add /41≈ 20kHz

• 1 clock card (CC)– master card: interprets commands and synchronizes all the

cards. Drives fibre to PC.

• 3 bias cards (BC)– BC 1: Squid Series Array Feedback (x32) + TES bias(x1)– BC 2: Squid 2 feedback (x32)– BC 3: SQ2 bias(x32) + TES heaters(x1)

SCUBA2 MCE

Page 3: Multi-Channel Electronics

SPIDER MCE• SPIDER (as well as SPUD and BICEPII) have

up to 33 rows and 16 columns for each array

• Repackaged MCE: – 2 RC’s– Reorganized BC’s duties

• Additional features:– More DET_BIAS (already in place)– SQ2_fb fast switching (to achieve a better lock and to

remove summing coil pickup switching off all SQ1_bias and adjusting SQ2_fb. However with fixed values. Or we could effectively connect the dark SQ sq1_fb with the sq2_fb)

Page 4: Multi-Channel Electronics

• 3 BC’s• BC1 0/16 SSA_fb, 0/16 SQ2_BIAS, DET_BIAS_ORG

• BC2 0/16 (possibly fast switching) SQ2_FB

• BC3 0/16 DET_BIAS

• In the current configuration slow SQ2_FB and 16 DET_BIAS slightly different from DET_BIAS_ORG

• 2 RC’s• RC1 0/7 SQ1_FB, 0/7 SSA_BIAS

• RC2 8/15 SQ1_FB, 8/15 SSA_BIAS

• 1 AC, 1 CC

Cards in SPIDER MCE

Page 5: Multi-Channel Electronics

Subrack in SPIDER MCE

T Felton design

Page 6: Multi-Channel Electronics

Backplane in SPIDER MCE

SQ1_fb: it was 450A, now 150 A because of the increase in the mutual inductance of MUX06. Is it fine?

DET_BIAS: the maximum we can achieve now is 4mA. It can be increased. Should it?

Page 7: Multi-Channel Electronics

PSU in SPIDER MCE

• Power supply:

– We currently use an ACDCU with a switching power supply

– For SPIDER: • we may use batteries

– 119W for SCUBA2. For SPIDER: 16 columns 73W (23W each RC)

Page 8: Multi-Channel Electronics

Cooling SPIDER MCE

• Cooling:

– We currently

use fans and

filtered air with positive pressure

– SPIDER MCE will be radiatively cooled using circulating

fluid with a pump

to the gondola frame, used as heatsink

T Felton design

Page 9: Multi-Channel Electronics

• Cosmic rays on FPGA and SEU tolerance: 1 per month at JCMT ~1 SEU / board / LDB flight. We are already in contact with the TRIUMF particle accelerator for realistic neutron fluency test (in fact, test flight would not reveal the real effect).

• Altera Stratix III FPGA’s offer additional on chip monitoring and testing features wrt Stratix I. We would not use it for the test flight. Maybe for SPIDER.

• PC’s in pressure vessel (HD). Two with crosscomunication.

• The syncbox could be there as well.

SEU in SPIDER MCE

Page 10: Multi-Channel Electronics

• For the new repackaged MCE with no cards redesign:

– Finalize the design 1-2 weeks

– Backplane 6-8 weeks

– Chassis our machine shop, 6 weeks

– New FPGA? Probably not for the test flight. Maybe for SPIDER

– Cooling system 4-5 weeks

– New filter box and flex (rigid-flex, 1 connector less, and no ground plane) 6-8 weeks

– Test 6-8 weeks

– SEU test ?

– New boards new year

Schedule for SPIDER MCE

Page 11: Multi-Channel Electronics

Modulation schemes

– TES bias

– SQ1 bias

– SQ1 fb (switching)

– SQ1 fb (ramping)

Page 12: Multi-Channel Electronics

TES bias– The TES bias could be square (or sine) wave

modulated at ~1kHz. We have the firmware for s.w. that can run as fast as half the framerate

Superconducting branch

Normal branch

Superconducting transition

– However, if the bias crosses zero for more than few hundreds s, than the TES’ may not recover

Acquired on the ACT CCam camera

Page 13: Multi-Channel Electronics

TES bias– In any TES bias modulation scheme we need a

firmware that has to run two separate servo loops. Synchronization is needed. Major firmware change for the read-out and the demodulation.

– It can be tested in software since we can already acquire fast data at 2.2kHz (33 rows, 32GB/h), 26kHz (1row). We’d need bolometers to do tests.

Acquired on the ACT MBAC camera

Page 14: Multi-Channel Electronics

TES bias– In any TES bias modulation scheme we need a

firmware that has to run two separate servo loops. Synchronization is needed. Major firmware change for the read-out and the demodulation.

– It can be tested in software since we can already acquire fast data at 2.2kHz (33 rows, 32GB/h), 26kHz (1row). We’d need bolometers to do tests.

Page 15: Multi-Channel Electronics

SQ1 bias modulation

– We visit the SQ1 at up to 20kHz with RS on bias. We could select 2 different on bias’ and switch at sub-harmonics of 20kHz.

– The firmware demodulation (i.e. remove off from on) would be straightforward since it would be a modification of the coadding we already implement.

Acquired on the ACT CCam camera

Page 16: Multi-Channel Electronics

SQ1 bias modulation

– We visit the SQ1 at up to 20kHz with RS on bias. We could select 2 different on bias’ and switch at sub-harmonics of 20kHz.

– We could invert the polarity of the SQ1_bias (although now it is not bipolar) and keep the same inverted polarity lock point.

Acquired on the ACT CCam camera

Page 17: Multi-Channel Electronics

SQ1 fb modulation (switch)– The SQ1_fb could be switched so that the PID

feedback loop works in opposite SQ1 slope– A firmware should be created that enables opposite

locking. That could be done with I-term=I·(-1)#frames

except that it would take time– However it should require a fine tuning and

Acquired on the ACT CCam camera

Page 18: Multi-Channel Electronics

SQ1 fb modulation (switch)

Acquired on the ACT MBAC camera

– The SQ1_fb could be switched so that the PID feedback loop works in opposite SQ1 slope

– A firmware should be created that enables opposite locking. That could be done with I-term=I·(-1)#frames

except that it would take time to relock– However it should require a fine tuning and

any asymmetry of the SQ1 V-phi doesn’t help

Page 19: Multi-Channel Electronics

SQ1 fb modulation (switch)

a combination of SQ1_bias and SQ1_fb modulation so that there are 4 different locking points and/or we keep the same lock point as K.Irwing suggested.

– The SQ1_fb could be switched so that the PID feedback loop works in opposite SQ1 slope

– A firmware should be created that enables opposite locking. That could be done with I-term=I·(-1)#frames

except that it would take time to relock– However it should require a fine tuning and

any asymmetry of the SQ1 V-phi doesn’t help

Page 20: Multi-Channel Electronics

SQ1 fb modulation (ramp)– We throw away the PID feedback loop and we

continuously ramp the SQ1_fb. This creates an effective modulation of the signal coming form the SQ1 V-phi curves

– We already have a data mode that ramps the SQ1 fb. In the 14bits DAC each step can be as high as 10kHz

– We look forward to test in software on a system with TES