Page 1: Miranda Gold's Willow Creek Project

www.mirandagold.com

Miranda Gold’sWillow Creek Project

Reviving an Important Historic District

TSX.V: MAD

Page 2: Miranda Gold's Willow Creek Project

This presentation contains forward-looking statements and factual information that are current as of the date the presentation was originally delivered. Miranda Gold Corp. disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

Forward-looking statements include, but are not limited to, statements with respect to the timing and amount of estimated future exploration, success of exploration activities, expenditures, permitting, and requirements for additional capital and access to data.

Forward looking statements involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; the ability to enter into joint ventures or to acquire or dispose of properties; future prices of mineral resources; accidents, labor disputes and other risks of the mining industry; ability to obtain financing; and delays in obtaining governmental approvals of financing.

The qualified person for any technical information in this presentation is Joseph Hebert, Executive Vice President.

The information in this presentation has been obtained by Miranda from its own records and from other sources deemed reliable.  However, no representation or warranty is made as to its accuracy or completeness.

Forward Looking Statement

Page 3: Miranda Gold's Willow Creek Project

Investment Profile

10 projects total♦ 5 Nevada properties♦ 4 Colombia properties♦ 1 Alaska property

Joint Venture Business Model♦ 3 projects in Joint Ventures♦ 1 Strategic Alliance (Agnico

Eagle)

$7.4 million Market Capitalization

74.0 million shares outstanding

$4.8 million in cash (5/31/14)

Recent share price $0.10

High/Low $0.20- $0.09

Project Generation Joint Venture Business Model

World-Class Gold Jurisdictions

Page 4: Miranda Gold's Willow Creek Project

Strong Technical Team and Shareholder Base

• Miranda’s exploration team:Involved in over 10 discoveries

Totaling over 30 M oz gold

Cortez Hills, Gold Rush, Ren, Nike

• Shareholders:Sprott Global, Rick Rule, Paul van Eeden,

Adrian Day Asset Mgt., Trimark Capital,

Polar Capital, Swiss and German retail,

Raymond James, Management

Page 5: Miranda Gold's Willow Creek Project

Willow Creek Project

Excellent Location

WILLOW PROJECT

Page 6: Miranda Gold's Willow Creek Project

www.mirandagold.com

Legendary Mining DistrictInactive since 1943

667,000 ounces 1.2 oz per ton

6

Lower Lucky Shot

War Baby Mine

Upper Lucky Shot

Page 7: Miranda Gold's Willow Creek Project

Enserch Tunnel (1980’s)Lower Lucky Shot Adit

Upper Lucky Shot Adit

Page 8: Miranda Gold's Willow Creek Project

www.mirandagold.com

“De-risked” by previous operator

Miranda’s first Production Joint Venture

Willow Creek Today

Coleman Portal Lucky Shot Mine

Enserch Tunnel

Man Camp

Mill

Page 9: Miranda Gold's Willow Creek Project

Coleman Portal and Landing Pad

18

Page 10: Miranda Gold's Willow Creek Project

80 Year Lease with Alaska Hardrock Inc.

Scott EubanksPresident AHI

Page 11: Miranda Gold's Willow Creek Project

75 Patented Mining Claims62 State of Alaska Lode Claims~8,700 Acres

Page 12: Miranda Gold's Willow Creek Project
Page 13: Miranda Gold's Willow Creek Project

Bullion Mountain

Lucky Shot Ridge

Hatcher Pass

Craigie Creek

Willow Creek Valley

Coleman Mine Portal

Page 14: Miranda Gold's Willow Creek Project

Willow Creek Historic Workings

Page 15: Miranda Gold's Willow Creek Project

Coleman NI 43-101 Resource*

Measured and IndicatedCutoff Grade (g/t) Au Tonnage above cutoff (tonnes) Grade above cutoff (g/t) Au Troy Ounces

5 106,000 19.8 67,500

7 78,700 24.6 62,100

10 58,600 30.2 56,800

* QP Dave Linebarger

Page 16: Miranda Gold's Willow Creek Project

NI 43-101 Highlights

• Measured and Indicated resource of 62,100 troy ounces gold at an average grade of 24.6 grams per tonne using a cutoff of 7.0 grams per tonne

• Resource estimate is for the upper Coleman deposit and is based on assays from 132 diamond core holes

• The resource is very compact within an area of approximately 140m by 182m

• There is good potential to increase the size of the deposit by exploring areas down-dip, and both east and west along strike of the Coleman deposit

• The resource occurs on patented claims accessible by road with permitting to be issued by the State of Alaska

Page 17: Miranda Gold's Willow Creek Project

Coleman Vein Model

Page 18: Miranda Gold's Willow Creek Project

5 gram per tonne cutoff

Block Model*

* Block Model by Pete Parsley (GTI)

Page 19: Miranda Gold's Willow Creek Project

Coleman Zone ResourceAlimak Raise

Coleman Resource

Colem

an Tunnel

Page 20: Miranda Gold's Willow Creek Project

Underground workings at Coleman

19

Page 21: Miranda Gold's Willow Creek Project
Page 22: Miranda Gold's Willow Creek Project
Page 23: Miranda Gold's Willow Creek Project
Page 24: Miranda Gold's Willow Creek Project

6 New Gold-Bearing Targets

Low Risk Exploration

Page 25: Miranda Gold's Willow Creek Project

Coleman VeinOld Workings

Lucky Shot VeinOld workings

Down-Dip Coleman

Murphy Discovery

Page 26: Miranda Gold's Willow Creek Project

2007 Drilling New Discoveries

•  C07-92 54.6 g/t Au over 1.0 m in Murphy Zone

• C07-143 77.2 g/t Au over 0.5 m in Lucky Shot Down-Dip

2006 Coleman Delineation Drilling

•  C06-39 154.5 g/t Au over 0.4 m

• C06-81 82.6 g/t Au over 1.7 m

2005 Upper Coleman Discovery

• C05-08 121.4 g/t Au over 0.6 m

• C05-12 219.0 g/t Au over 4.0 m

Recent Significant Drill Results

Page 27: Miranda Gold's Willow Creek Project

District Potential

1. Coleman down dip and along strike

2. Above and Below Lucky Shot Mine  

3. Delineate and Extend Murphy Discovery

4. Test new soil and outcrop targets on Bullion Mountain 

5. Connect Lucky Shot and Bullion Systems

Page 28: Miranda Gold's Willow Creek Project

Recent Sampling Bullion Mountain

GoldBullion

Murphy

Explores for New Veins Between the Gold Bullion & Murphy

Grid Starts 300m SW ofFault Termination of Gold Bullion Vein

200m x 20m stations

Only NE Third of GridCompleted for 2014 Assessment

Page 29: Miranda Gold's Willow Creek Project

Au values in Soils Inferred Veins

17.05 g

50.74 g Au

Page 30: Miranda Gold's Willow Creek Project

Recent Soil Sampling Results

0.100 to plus 1.0 g Au/t Values in Soils

Multiple Linear Anomalies to 800m Strike Successive Lines

Anomalies Begin 300m Southeast of Gold Bullion Vein Fault Termination

Soils orientation over upper Coleman averaged 0.140 g Au/t

17.05 to 50.74 g Au/t in Quartz Vein Subcrop

Page 31: Miranda Gold's Willow Creek Project

Joint Venture for Development of the High Grade Willow Creek Gold Project

Page 32: Miranda Gold's Willow Creek Project

Who is Gold Torrent Inc.?

Gold Torrent Inc. (“GTI”) is an OTC Bulletin Board listed company, established in 2013, led by individuals with extensive experience in public company management, mining and financial sectors:

• Daniel Kunz (Chairman) is a senior mining executive with more than 35 years engineering, mine operations, management, accounting, and finance including 17 years with Morrison Knudsen Mining and as President and COO Ivanhoe Mines Ltd. Strong mine development career success.

• Ryan Hart (President, CEO), is an experienced finance professional and former financial manager for Credit Suisse and UBS, with an emphasis on venture capital

Page 33: Miranda Gold's Willow Creek Project

• Permitting and community discussions to begin as soon as JV is signed

• Gold Torrent Inc. to operate

• Extremely small “footprint”

• 21,000 oz/yr gold produced initially

• Mining 150 ton per day selectively for grade (jackleg/slusher)

• Crush, grind, mill, gravity separate and smelt in secure facility

• 80 to 85% gold recovery through gravity plant with 10-20% mine dilution

• Patented Claims allow for permitting with State of Alaska

Production Plan

Page 34: Miranda Gold's Willow Creek Project

Visible Gold Prevalent Low sulfide, easy recovery

VG > 10.5 g Au/t VG w Telluride > 18 g Au/t

Page 35: Miranda Gold's Willow Creek Project