Energy and Mineral Resources for People’s Welfare MINISTRY OF ENERGY AND MINERAL RESOURCES DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION Delivered By : Maritje Hutapea Director of Various New and Renewable Energy Presented at The Seanergy Conference 2017 Le Havre, March 22nd, 2017 1

Upload: lyhanh

Post on 17-Mar-2019

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

MINISTRY OF ENERGY AND MINERAL RESOURCES

DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION

Delivered By :

Maritje Hutapea

Director of Various New and Renewable Energy

Presented at The Seanergy Conference 2017Le Havre, March 22nd, 2017

1

Page 2: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

I. National Electrification Ratio

II. National Energy Policy 5

III. Renewable Energy Potential 8

IV. Marine Energy Cooperation 10

V. Draft Roadmap of Marine Energy Development in Indonesia 15

2

Page 3: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

I. NATIONAL ELECTRIFICATION RATIO • National electrification ratio was 91.16% in 2016.• There are 2 provinces (NTT and Papua) havingelectrification ratio lower than 70%.

• Indonesia’s electrification ratio is still low (91.16%)

compared to other ASEAN countries.

• Target of electrification ratio: 97.35% by 2019 (RPJM)and 100% by 2024 (RUKN)

ELECTRIFICATION RATIO IN ASEAN COUNTRIES

NATIONAL ELECTRIFICATION RATIO IN 2016 (%)

Per

sen

(%

)

3

Page 4: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

II. National Energy Policy

4

Page 5: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

23%

25%30%

22%5%

46%26%

23%

166MTOE

~ 400 MTOE

Oil

Gas

Coal

NRE

NATIONAL ENERGY POLICY(Government Regulation No. 79/2014)

New and Renewable Energy

OilGas

Coal 20152025

2015 2025

Total Installed Capacity 55,53 GW 115 GW

Energy Consumption 0,75 TOE/capita 1,4 TOE/capita

Electricity Consumption 910 KWh/capita 2.500 KWh/capita

5

Page 6: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

2015 2025

Total Installed Capacity 55 GW 135 GW

NRE Power Plant Capacity8,7 GW

(15,7%)

45 GW

(33%)

6

+ 80 GW (NRE+ FOSSIL)

+ 36,3 GW (NRE)

for 10 years

2025Geothermal 7,2 GW

Hydro 21 GW

Bioenergi 5,5 GW

Solar Power 6,4 GW

Wind 1,8 GW

Other NRE

(include marine

energy)

3,1 GW

Totall 45 GW

Target 2025 : NRE Power Plant

8,6610,8

11,7312,94

15,8118,48

24,66

29,28

35,74

41,01

45,04

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Geothermal Bioenergy Hydro Mini Hydro

Solar Wind Ocean Total

6

Page 7: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

No.Renewable

Energy SourcesMethod of Appointment

Tariff

Local Grid BPP > National BPP Local Grid BPP ≤ National BPP

1. Solar PV Auction in capacity quota with minimum 15 MW Maximum 85% x Local Grid BPP 100% x Local Grid BPP

2. Wind Auction in capacity quota with minimum 15 MW Maximum 85% x Local Grid BPP 100% x Local Grid BPP

3. Hydro

Reference Price Maximum 85% x Local Grid BPP 100% x Local Grid BPP

Direct Selection Price determined by direct selection process

a. Capacity ≤ 10 MW: Capacity Factor minimum 65%b. Capacity > 10 MW: Capacity Factor depends on local grid system requirements

4. BiomassReference Price (for 10 MW or less) Maximum 85% x Local Grid BPP 100% x Local Grid BPP

Direct Selection (for more than 10 MW) Price determined by direct selection process

5. Biogass

Reference Price (for 10 MW or less) Maximum 85% x Local Grid BPP 100% x Local Grid BPP

Direct Selection (for more than 10 MW) Price determined by direct selection process

6.MunicipalWaste

Reference PriceMaximum 100% of Local GenerationBPP

Mutual agreement between PLNand IPP

7. Geothermal Reference Price Maximum 100% x Local Grid BPPMutual agreement between PLNand IPP

BPP = Production Cost of Electricity

Local Grid BPP and National BPP will be determined by the Minister based on the proposal of PT PLN (Persero)

7

Page 8: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

III. Renewable Energy Potential

8

Page 9: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare 9

8,80 GW (2% Based on potential)443,2 GW

Page 10: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

INDONESIAN MARINE ENERGY POTENTIAL

TYPE THEORETICAL (MW) TECHNICAL (MW) PRACTICAL (MW)

WAVES 141,472 7,985 1,995

CURRENT 287,822 71,955 17,989

THERMAL 4,247,389 136,669 41,001

TOTAL 4,676,683 216,609 60,985

1

0

Page 11: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

IV. Marine Energy Cooperation

11

Page 12: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

Ministry of Energy and Mineral Resources (MEMR) is collaborating with several countries to developmarine energy in Indonesia :

Indonesia - France

On 11 March 2016, Directorate General of New, Renewable Energy and Energy Conservation(DGNREEC) and Agence France de Developpement/AFD (France) signed the ImplementingAgreement on the Tidal Energy Project in Indonesia. AFD is now doing Pra FS and assessing 10-15 potential sites and will select 2-3 most suitable locations for Tidal Power Pilot Project.

The steering Committee has been set-up for the cooperation.

The First Steering Committee Meeting was held on 22 june 2016 in DGNREEC, Jakarta. AFD sidepresented the initial assessment progress and will hold further coordination with other relatedparties, such as PT PLN (Persero), Research and Development Center for Electricity & NREEC ofMEMR (P3KEBTKE), Research and Development Center for Marine Geology of MEMR (P3GL)and Ministry of Marine Affairs and Fisheries regarding further data collection.

The Second Steering Committee Meeting was held on February 21, 2017 also in DGNREEC,Jakarta. AFD presented the progress of the study step 2 and is coordinating further with P3GL andother related parties to select 3 locations to be brought to the step 3.

12

Page 13: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

Indonesia - UK

On 27 Juli 2015, Coordinating Ministry of Maritime Affairs and UK Government signed MOU

on Maritime Cooperation Activities.

Both countries have agreed to collaborate on various maritime issues, including capacity

building, maritime research and energy and mineral resources development.

UK through Gordon Robert University supported Indonesia to prepare Roadmap of Marine

Energy Development.

Indonesia and UK are also planning to establish SEAMEC (South East Asia Marine Energy

Centre) as the Center of Excellence of marine energy research and development in

Indonesia.

13

Page 14: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

Indonesia - Austria

Austria dan MEMR signed MOU on Hydropower in 2014. Austria (Andritz Hydro) is interested to developTidal Energy power generation in Indonesia. Austria is starting to identify the suitable location particurlarly in NTT to develop tidal current

project.

Indonesia - Netherland

On 22 April 2016, the Ministry of Public Works and Housing, Tidal Bridge PV and the Governmentof East Nusa Tenggara (NTT) Province signed Head of Agreement (HoA) on Building BridgesEquipped with Sea Current Turbine Power Plant in The District of East Flores Sea.

An 800 metres’ Pancasila Palmerah Bridge will be built by the Ministry of Public Works andHousing, connecting Flores and Adonara Island in East Flores regency and will be integrated withbuilt-in marine current turbines to generate electricity.

Pra FS for marine current project has been finished. The initial capacity of the marine current power generation is planned to be around 30 MW in 2018

and will be raised gradually untill reach 80 MW by 2020.

14

Page 15: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

Preparing Roadmap of Marine Energy Development

The Roadmap Concept comprises of : Site Preparation Regulation Marine Energy Industry Development Capacity Building Targets Setting Financing Scheme

15

Page 16: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Energy and Mineral Resources for People’s Welfare

Benefit : Many areas with low electrification ratio have high marine energy potential. On

the other side, those areas are known have economic potential such as fisherieswhich need cool storage.

Challenges :

Production cost of marine energy is still relatively higher than other renewableenergy (such as solar PV, wind, hydro, etc);

The marine energy resources located in remote areas that difficult to accessespecially from PLN’s grid connection.

16

Page 17: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

esdm untuk kesejahteraan rakyat © 2013

Sekretariat Direktorat Jenderal EBTKE

www.ebtke.esdm.go.id

Jalan Pegangsaan Timur No. 1 Menteng Jakarta Pusat 10320 Telp/Faks : 021-31924540

MINISTRY OF ENERGY AND MINERAL RESOURCES

DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION

Page 18: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Tidal Energy Projects in Indonesia (TEPI)

Supporting the emergence of first tidal

farms in Indonesia

18

Page 19: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

AFD at a glance

Established in 1941, Agence Française de Développement (AFD) is the bilateral Development Bank of France.

AFD promotes economically, socially and environmentally sustainable development.

• EUR 9.2 Billion committed in 2016 in more

than 90 countries

• 25% dedicated to the energy sector

• Loans, grants and technical assistance

AFD activities in the Indonesian energy sector

Financing of PLN (national utility) grid projects Java – Bali interconnection, West Kalimantan, Jakarta I & II for a total of 250 MUSD through

sovereign and non-sovereign loans

Budgetary loan dedicated to the energy sector Sustainable and Inclusive Energy Program, 150 MUSD loan, cofinancing with World Bank, ADB

and KfW Technical assistance mobilized on a grant basis to support policy elaboration Dialogue with the Indonesian authorities to support their energy policies development: context in which TEPI was initiated

Page 20: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Interest for tidal in Indonesia?

Indonesia may represent one of the best technical potential in the world for tidal current turbine

Electricity generation costs are really high in islands which are not connected to the main grid

Thus, the following approach has been developed jointly by EBTKE & AFD:

- Identify sites which present both a good technical potential and a suitable economic interest based on available data;

- Conduct campaign measures on these designated sites;

- Launch a bidding to select Independent Power Producers.

Page 21: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

TEPI – Step by step

Launching of the initiative in March 2016 In presence of EBTKE, PLN, French Ministry of Energy and AFD Artelia & Castlerock selected as technical consultantto support the initiative

First phase of data collection (existing studies review and satellite data) concluded

Approval of the selection of 10 sites for deeper investigation in October 2016

Second phase for more detailed data collection (grid data) on selected zones and modelization of the currents by ITB (Indonesian University) concluded in February 2016 Results of the simulation using ITB’s model are disappointing and do not allow the selection of three sites

Page 22: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

TEPI – Step by step

Way forward

Meet with companies and institutions to improve knowledge of the sector

Study tour in France 19-24 March

Need to develop a new comprehensive model with a small meshing on zones of interest and which would integrate the Indonesian Through Flow?

May be developed in the coming months to selected 3 sites by September

ADCP campaign and preparation of the tendering process by the end of the year

Launch of the call for projects early 2018.

Page 23: MINISTRY OF ENERGY AND MINERAL RESOURCES · V. Draft Roadmap of Marine Energy Development in Indonesia 15 2. ... Financing of PLN ... grid projects Java –Bali interconnection,

Terima kasih !

Stéphane Tromilin

[email protected]

23