    MILLENNIUM CHALLENGE CORPORATION

    MCC FR 10-10

    Notice of Quarterly Report (April 1, 2010 - June 30, 2010)

    AGENCY: Millennium Challenge Corporation

    SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter April

    1, 2010 through June 30, 2010, on assistance provided under section 605 of the Millennium

    Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or

    allocations of funds to other federal agencies under section 619(b) of the Act. The followingreport will be made available to the public by publication in the Federal Register and on the

    Internet website of the MCC (www.mcc.gov ) in accordance with section 612(b) of the Act.

    Dated: September 9, 2010

    ____________________________T. Charles CooperVice PresidentCongressional and Public AffairsMillennium Challenge Corporation

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    2/41

    2

    Assistance provided under Section 605 Country: Madagascar Year: 2010 Quarter 3

    Total Obligation: $87,998,166 Entity to which the assistance is provided : MCA Madagascar Total Quarterly Disbursement : $0

    Projects Obligated Objectives Cumulative Disbursements

    Measures

    Area secured with land certificates or titles in the ZonesLegal and regulatory reforms adopted

    Number of land documents inventoried in the Zones andAntananarivo

    Number of land documents restored in the Zones andAntananarivo

    Number of land documents digitized in the Zones andAntananarivo

    Average time for Land Services Offices to issue a duplicatecopy of a title

    Average cost to a user to obtain a duplicate copy of a title

    from the Land Services Offices

    Number of land certificates delivered in the Zones during theperiod

    Number of new guichets fonciers operating in the Zones

    Land TenureProject

    $30,123,098 Increase Land

    Titling and Security $29,303,833

    The 256 Plan Local dOccupation Foncier -Local Plan of Land Occupation (PLOFs ) are completed

    Volume of funds processed annually by the national paymentsystem

    Number of accountants and financial experts registered tobecome CPA

    Number of Central Bank branches capable of acceptingauction tenders

    Outstanding value of savings accounts from CEM in theZones

    Number of MFIs participating in the Refinancing andGuarantee funds

    Maximum check clearing delay

    Network equipment and integrator

    Real time gross settlement system (RTGS)

    Telecommunication facilities

    Retail payment clearing system

    Number of CEM branches built in the Zones

    Financial SectorReform Project $25,937,781

    IncreaseCompetition

    in theFinancial

    Sector

    $23,535,170

    Number of savings accounts from CEM in the Zones

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    3/41

    3

    Percent of Micro-Finance Institution (MFI) loans recorded inthe Central Bank database

    Number of farmers receiving technical assistance

    Number of marketing contracts of ABC clients

    Number of farmers employing technical assistanceValue of refinancing loans and guarantees issued toparticipating MFIs (as a measure of value of agricultural andrural loans)Number of Mnistre de l'Agriculture,de l'Elevage et de laPche- Ministry of Agriculture, Livestock, and Fishing(MAEP) agents trained in marketing and investmentpromotion

    AgriculturalBusiness

    InvestmentProject

    $13,687,196

    Improve Agricultural

    ProjectionTechnologiesand Market Capacity in

    Rural Areas

    $13,581,751

    Number of people receiving information from AgriculturalBusiness Center (ABCs) on business opportunities

    ProgramAdministration*

    and Control,Monitoring and

    Evaluation

    $18,250,091 $17,577,502

    Pendingsubsequentreports**

    $0

    *Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.

    **These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reportedas such in subsequent quarterly report(s)

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    4/41

    4

    Country: Honduras Year: 2010 Quarter 3

    Total Obligation: $205,000,000

    Entity to which the assistance is provided : MCA Honduras Total Quarterly Disbursement : $20,070,438

    Projects Obligated Objective Cumulative Disbursements Measures

    Number of program farmers harvestinghigh-value horticulture crops

    Number of hectares harvesting high-value horticulture crops

    Number of business plans prepared byprogram farmers with assistance fromthe implementing entity

    Total value of net sales

    Total number of recruited farmersreceiving technical assistance

    Value of loans disbursed to farmers,agribusiness, and other producers andvendors in the horticulture industry,including Program Farmers,cumulative to date, Trust FundResources

    Number of loans disbursed(disaggregated by trust fund, leveragedfrom trust fund, and institutionsreceiving technical assistance fromACDI-VOCA)

    Number of hectares under irrigation

    Rural DevelopmentProject $67,762,685

    Increase the productivity and business skills of farmers

    who operate small and medium-size farms and their

    employees.

    $57,468,393

    Number of farmers connected to thecommunity irrigation system

    Freight shipment cost fromTegucigalpa to Puerto Cortes.

    Average annual daily traffic volume-CA-5

    International roughness index (IRI) CA-5

    Kilometers of road upgraded CA-5

    Percent of contracted road worksdisbursed CA-5

    TransportationProject

    $119,887,240 Reduce transportation costsbetween targeted production

    centers and national,regional and global markets.

    $102,606,515

    Average annual daily traffic volume secondary roads

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    5/41

    5

    International roughness index (IRI) secondary roads

    Kilometers of road upgraded secondary roads

    Average annual daily traffic volume rural roads

    Average speed Cost per journey (ruralroads)

    Kilometers of road upgraded ruralroads

    Percent disbursed for contractedstudies

    Value of signed contracts forfeasibility, design, supervision andprogram mgmt contracts

    Kilometers (km) of roads under design

    Number of Construction works andsupervision contracts signed

    Kilometers (km) of roads under workscontracts

    ProgramAdministration* andControl, Monitoringand Evaluation

    $17,350,075 $10,825,354

    Pending subsequentreports**

    $1,521,767

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    6/41

    6

    Country: Cape Verde Year: 2010 Quarter 3Total Obligation: $110,078,488

    Entity to which the assistance is provided : MCA Cape Verde Total Quarterly Disbursement : $8,145,814 Projects Obligated Objectives Cumulative

    Disbursements Measures

    Productivity: Horticulture, Paul watershed

    Productivity: Horticulture, Faja watershed

    Productivity: Horticulture, Mosteiros watershed

    Number of farmers adopting drip irrigation: All interventionwatersheds (Paul, Faja and Mosteiros) (incremental)Area irrigated with drip irrigation: All interventionwatersheds (Paul, Faja and Mosteiros) (incremental)Irrigation Works: Percent contracted works disbursed. Allintervention watersheds (Paul, Faja and Mosteiros)(incremental)Number of reservoirs constructed in all interventionwatersheds (Paul, Faja and Mosteiros) (incremental)

    Watershed andAgriculturalSupport Project

    $12,031,549

    Increaseagricultural

    production inthree targeted

    watershed areas on three

    islands

    $9,635,989

    Number of farmers that have completed training in at least 3of 5 core agricultural disciplines: All intervention watersheds(Paul, Faja and Mosteiros) (incremental)Travel time ratio: percentage of beneficiary populationfurther than 30 minutes from nearest market

    Kilometers of roads rehabilitated

    Percent of contracted Santiago Roads works disbursed(cumulative)

    Percent of contracted Santo Antao Bridge works disbursed(cumulative)

    Port of Praia: percent of contracted port works disbursed(cumulative)Cargo village: percent of contracted works disbursed(cumulative)Quay 2 improvements: percent of contracted works disbursed(cumulative)

    InfrastructureImprovementProject

    $82,630,208

    Increaseintegration of the internalmarket and

    reducetransportation

    costs$62,000,390

    Access road: percent of contracted works disbursed(cumulative)

    Private SectorDevelopmentProject

    $1,931,223

    Spur privatesector

    development on all islands

    throughincreased

    investment inthe priority

    sectors and through

    financialsector reform

    $1,406,654 MFI portfolio at risk, adjusted (level)

    ProgramAdministration* and Control,Monitoring andEvaluation

    $13,485,508 $11,095,940

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    7/41

    7

    Pendingsubsequentreports**

    $480

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    8/41

    8

    Country: Nicaragua Year: 2010 Quarter 3

    Total Obligation: $113,599,751

    Entity to which the assistance is provided : MCA Nicaragua Total Quarterly Disbursement : $ 4,666,842

    Projects Obligated Objective Cumulative Disbursements Measures

    Automated database of registry andcadastre installed in the 10municipalities of Leon

    Value of land, urban

    Value of land, rural

    Time to conduct a land transaction.

    Number of additional parcels with aregistered title, urban

    Number of additional parcels with aregistered title, rural

    Area covered by cadastral mapping

    PropertyRegularizationProject

    $7,205,205 Increase Investment bystrengthening property rights $5,386,594

    Cost to conduct a land transaction.

    Annual Average daily traffic volume:N1 Section R1

    Annual Average daily traffic volume:N1 Section R2

    Annual Average daily traffic volume:Port Sandino (S13)

    Annual Average daily traffic volume:Villanueva Guasaule Annual

    Average daily traffic volume:Somotillo-Cinco Pinos (S1)

    Annual average daily traffic volume:Len-Poneloya-Las Peitas

    International Roughness Index: N-ISection R1

    International Roughness Index: N-I

    Section R2

    International Roughness Index: PortSandino (S13

    TransportationProject

    $57,999,999 Reduce transportation costs

    between Leon and Chinandegaand national, regional and

    global markets

    $53,642,992

    International roughness index:Villanueva Guasaule

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    9/41

    9

    International roughness index:Somotillo-Cinco Pinos

    International roughness index: Len-Poneloya-Las Peitas

    Kilometers of NI upgraded: R1 and R2and S13

    Kilometers of NI upgraded: Villanueva Guasaule

    Kilometers of S1 road upgraded

    Kilometers of S9 road upgraded

    Number of beneficiaries with businessplans

    Numbers of manzanas (1 Manzana =1.7 hectares), by sector, harvestinghigher-value crops.

    Number of beneficiaries with business plansprepared with assistance of Rural BusinessDevelopment Project

    Number of beneficiaries implementingForestry business plans under Improvementof Water Supplies Activity

    Number of Manzanas reforested

    Rural DevelopmentProject

    $32,897,500 Increase the value added of farms and enterprises in the

    region$25,828,413

    Number of Manzanas with trees planted

    ProgramAdministration*,Due Diligence,Monitoring andEvaluation

    $15,497,047 $11,980,280

    Pending subsequentreports** $1,509,801

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    10/41

    10

    Country: Georgia Year: 2010 Quarter 3

    Total Obligation: $395,300,000

    Entity to which the assistance is provided : MCA Georgia Total Quarterly Disbursement : $25,160,477

    Projects Obligated Objective Cumulative Disbursements

    Measures

    Household savings from InfrastructureRehabilitation Activities

    Savings in vehicle operating costs (VOC)

    International roughness index (IRI)

    Annual average daily traffic (AADT)

    Travel Time

    Road paved/completed

    Construction Works completed (Contract 1)

    Construction Works completed (Contract 2)

    Signed contracts for feasibility and/or designstudies

    Percent of contracted studies disbursed

    Kilometers of roads under design

    Signed contracts for road works

    Kilometers of roads under works contracts

    Sites rehabilitated (phases I, II, III) - pipeline

    Construction works completed (phase II) -pipeline

    Savings in household expenditures for all RIDsubprojects

    Population Served by all RID subprojects

    RID Subprojects completed

    Value of RID Grant Agreements signed

    Value of project works and goods contractsSigned

    Regional InfrastructureRehabilitation Project $315,600,000

    Key Regional Infrastructure Rehabilitated

    $163,853,797

    RID subprojects with works initiated

    Jobs Created by Agribusiness DevelopmentActivity (ADA) and by Georgia Regional

    Development Fund (GRDF)Household net income - ADA and GRDF

    Jobs created ADA

    Firm income ADA

    Household net income ADA

    Regional EnterpriseDevelopment Project $47,350,000

    Enterprises in Regions

    Developed

    $39,893,670

    Beneficiaries (direct and indirect) - ADA

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    11/41

    11

    Grant agreements signed - ADA

    Increase in gross revenues of portfoliocompanies (PC)

    Increase in portfolio company employees

    Increase in wages paid to the portfolio companyemployees

    Portfolio companies (PC)

    Funds disbursed to the portfolio companies

    ProgramAdministration*, DueDiligence, Monitoringand Evaluation

    $32,350,000 $18,641,284

    Pending subsequentreports**

    $25,160,477

    November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of additional fundsavailable to the Millennium Challenge Georgia Fund. These funds will be used to complete works in the Roads, RegionalInfrastructure Development, and Energy Rehabilitation Projects contemplated by the original Compact. The amendment was ratifiedby the Georgian parliament and entered into force on January 30, 2009.

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    12/41

    12

    Country: Vanuatu Year: 2010 Quarter 3

    Total Obligation: $65,690,000

    Entity to which the assistance is provided : MCA Vanuatu Total Quarterly Disbursement : $7,281,831

    Projects Obligated Objective Cumulative Disbursements Measures

    Traffic volume (average annual dailytraffic) Efate: Ring Road

    Traffic Volume (average annual dailytraffic) Santo: East Coast Road

    Kilometers of road upgraded Efate:Ring Road

    Kilometers of roads upgraded Santo:East Coast Road

    TransportationInfrastructureProject

    $60,162,579 Facilitate transportation toincrease tourism and business

    development $50,820,986

    Percent of contracted roads works

    disbursed (USD disbursed): Total(Cumulative)

    ProgramAdministration* ,Due Diligence,Monitoring andEvaluation

    $5,527,421 $3,323,066

    Pending subsequentreports**

    $1,427,754

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    13/41

    13

    Country: Armenia Year: 2010 Quarter 3

    Total Obligation: $235,650,000

    Entity to which the assistance is provided : MCA Armenia Total Quarterly Disbursement : $13,029,733

    Projects Obligated Objective Cumulative Disbursements Measures

    Training/technical assistance providedfor On-Farm Water Management

    Training/technical assistance providedfor Post-Harvest Processing

    Loans Provided

    Percent of contracted works disbursed

    Value of signed contracts for irrigationworks

    Number of farmers using better on-

    farm water managementNumber of enterprises using improvedtechniquesValue of irrigation feasibility and/ordetailed design contracts signed

    Additional Land irrigated under project

    Irrigated AgricultureProject (Agricultureand Water)

    $152,709,208 Increase agricultural

    productivity Improve and Quality of Irrigation

    $57,588,723

    Percent of contracted irrigationfeasibility and/or design studiesdisbursed

    Average annual daily traffic on PilotRoads

    International roughness index for Pilot

    Roads Road Sections Rehabilitated PilotRoads

    Rural RoadRehabilitationProject

    $67,100,000 Better access to economic and social infrastructure $7,870,945

    Pilot Roads: Percent of WorksCompleted

    ProgramAdministration*,Due Diligence,Monitoring andEvaluation

    $15,840,792$9,572,123

    Pending subsequentreports ** $1,094,394

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    14/41

    14

    Country: Benin Year: 2010 Quarter 3Total Obligation: $305,761,550

    Entity to which the assistance is provided : MCA Benin Total Quarterly Disbursement : $21,720,603

    Projects Obligated Objective Cumulative Disbursements Measures

    Volume of credits granted by theMicro-Finance Institutions (MFI)

    Volume of saving collected by theMicro-Finance Institutions

    Average portfolio at risk >90 days of microfinance institutions at thenational level

    Operational self-sufficiency of MFIs atthe national level

    Number of institutions receiving grantsthrough the Facility

    Access to FinancialServices Project

    $19,650,000 Expand Access to FinancialServices

    $4,203,641

    Number of MFIs inspected by CSSFD

    Average time to enforce a contract.

    Percent of firms reporting confidencein the judicial system

    Passage of new legal codes

    Average time required for Tribunauxde premiere instance- arbitrationcenters and courts of first instance(TPI) to reach a final decision on acaseAverage time required for Court of Appeals to reach a final decision on acasePercent of cases resolved in TPI peryearPercent of cases resolved in Court of Appeals per year

    Number of Courthouses completed

    Average time required to register abusiness (socit)

    Access to JusticeProject

    $34,270,000 Improved Ability of JusticeSystem to Enforce Contracts

    and Reconcile Claims $3,256,735

    Average time required to register abusiness (sole proprietorship)

    Total value of investment in targetedurban land parcels

    Access to LandProject

    $35,645,826

    Strengthen property rights and increase investment in rural

    and urban land $15,439,332

    Total value of investment in targetedrural land parcels

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    15/41

    15

    Average cost required to convertoccupancy permit to land title throughsystematic process

    Share of respondents perceiving landsecurity in the PH-TF or PFR areas

    Number of preparatory studiescompleted

    Number of Legal and RegulatoryReforms Adopted

    Amount of Equipment Purchased

    Number of new land titles obtained bytransformation of occupancy permit

    Number of land certificates issuedwithin MCA- Benin implementation

    Number of PFRs established withMCA Benin implementation

    Number of permanent stations installed

    Number of stakeholders Trained

    Number of communes with newcadastres

    Number of operational land marketinformation systems

    Volume of merchandise traffic throughthe Port Autonome de Cotonou

    Bulk ship carriers waiting times at theport

    Port design-build contract awarded

    Port crime levels (number of thefts)

    Average time to clear customs

    Access to MarketsProject

    $170,259,549

    Improve Access to Marketsthrough Improvements to the

    Port of Cotonou$44,448,945

    Port meets - international port securitystandards (ISPS)

    ProgramAdministration*,Due Diligence,Monitoring andEvaluation

    $45,936,175 $24,737,283

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    16/41

    16

    Pending subsequentreports** $283,062

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    17/41

    17

    Country: Ghana Year: 2010 Quarter 3

    Total Obligation: $537,863,123

    Entity to which the assistance is provided : MCA Ghana Total Quarterly Disbursement : $42,061,572

    Projects Obligated Objective Cumulative Disbursements Measures

    Number of farmers trained inCommercial Agriculture

    Number of agribusinesses assisted

    Number of preparatory land studiescompletedLegal and Regulatory land reformsadoptedNumber of landholders reached bypublic outreach efforts

    Number of hectares under production

    Number of personnel trained

    Number of buildingsrehabilitated/constructed

    Value of equipment purchased

    Feeder Roads International RoughnessIndex

    Feeder Roads Annualized AverageDaily TrafficValue of signed contracts forfeasibility and/or design studies of Feeder RoadsPercent of contracted design/feasibilitystudies completed for Feeder Roads

    Value of signed works contracts forFeeder Roads

    Percent of contracted Feeder Roadworks disbursed

    Value of loans disbursed to clientsfrom agriculture loan fund

    Value of signed contracts forfeasibility and/or design studies(irrigation)

    Percent of contracted

    (design/feasibility) studies complete(irrigation)

    Value of signed contracts for irrigationworks (irrigation)

    Agriculture Project $211,750,193 Enhance Profitability of

    cultivation, services toagriculture and product

    handling in support of theexpansion of commercial

    agriculture among groups of smallholder farms

    $88,344,318

    Rural hectares mapped

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    18/41

    18

    Percent of contracted irrigation worksdisbursed

    Percent of people aware of their landrights in Pilot Land Registration Areas

    Total number of parcels surveyed in

    the Pilot Land Registration Areas(PLRAs)

    Volume of products passing throughpost-harvest treatment

    Number of students enrolled in schoolsaffected by Education Facilities Sub-Activity

    Number of schools rehabilitated

    Number of basic school blocksconstructed to Ministry of Education(MOE) construction standards

    Distance to collect water

    Time to collect water

    Incidence of guinea worm

    Average number of days lost due toguinea worm

    Number of people affected by Waterand Sanitation Facilities Sub-ActivityNumber of stand-aloneboreholes/wells/nonconventional watersystems constructed/rehabilitated.

    Number of small-town water systemsdesigned and due diligence completed

    for constructionNumber of pipe extension projectsdesigned and due diligence completedfor construction

    Rural DevelopmentProject

    $73,436,385

    Strengthen the ruralinstitutions that provide

    services complementary to,and supportive of,

    agricultural and agriculturebusiness development

    $19,912,312

    Number of agricultural processingplants in target districts with electricitydue to Rural Electrification Sub-ActivityTrunk Roads International roughnessindexN1 International Roughness Index

    N1 Annualized Average Daily Traffic

    N1 Kilometers of road upgradedValue of signed contracts forfeasibility and/or design studies of theN1

    Percent of contracted design/feasibilitystudies completed of the N1

    TransportationProject

    $209,766,616 Reduce the transportationcosts affecting agriculturecommerce at sub-regional

    levels

    $54,707,517

    Value of signed contracts for roadworks N1, Lot 1

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    19/41

    19

    Value of signed contracts for roadworks N1, Lot 2

    Trunk Roads Annualized AverageDaily TrafficTrunk Roads Kilometers of roadscompletedPercent of contracted design/feasibilitystudies completed of Trunk RoadsPercent of contracted Trunk Roadworks disbursedFerry Activity: annualized averagedaily traffic vehiclesFerry Activity: annual average dailytraffic (passengers)

    Landing stages rehabilitated

    Ferry terminal upgraded

    Rehabilitation of Akosombo FloatingDock completed

    Rehabilitation of landing stagescompletedPercent of contracted road worksdisbursed: N1, Lot 2Percent of contracted road worksdisbursed: N1, Lot 2Percent of contracted work disbursed:ferry and floating dock Percent of contracted work disbursed:landings and terminalsValue of signed contracts forfeasibility and/or design studies of Trunk Roads

    Value of signed contracts for Trunk

    RoadsProgramAdministration*,Due Diligence,Monitoring andEvaluation

    $42,909,929 $24,009,830

    Pending subsequentreports** $218,946

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    20/41

    20

    Country: El Salvador Year: 2010 Quarter 3

    Total Obligation: $460,940,000

    Entity to which the assistance is provided : MCA El Salvador Total Quarterly Disbursement : $30,180,141

    Projects Obligated Objective Cumulative Disbursements Measures

    Employment rate of graduates of middle technical schools

    Graduation rates of middle technicalschools

    Middle technical schools remodeledand equipped

    Scholarships granted to students of middle technical schools

    Students of non-formal training

    Cost of water

    Time collecting water

    Households benefiting with watersolutions built

    Potable water and basic sanitationsystems with construction contractssigned

    Cost of electricity

    Households benefiting with aconnection to the electricity network

    Household benefiting with theinstallation of isolated solar systems

    Kilometers of new electrical lines withconstruction contracts signed

    HumanDevelopmentProject

    $101,753,001

    Increase human and physical capital of

    residents of the Northern Zone to take advantage of employment and business

    opportunities. $21,017,837

    Population benefiting from strategicinfrastructure

    ProductiveDevelopmentProject

    $71,824,000 Increase production and employment in the

    Northern Zone.

    $26,483,228

    Number of hectares under productionwith MCC support

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    21/41

    21

    Number of beneficiaries of technicalassistance and training - Agriculture

    Number of beneficiaries of technicalassistance and training Agribusiness

    Value of Agricultural Loans to

    Farmers/Agribusiness

    Average annual daily traffic

    International roughness index

    Kilometers of roads rehabilitatedConnectivity Project $246,122,001

    Reduce travel cost and time within the Northern

    Zone, with the rest of thecountry, and within the

    region.

    $60,724,725

    Kilometers of roads with ConstructionInitiated

    ProgramAdministration* and

    Control, Monitoringand Evaluation

    $41,240,998 $14,233,352

    Pending SubsequentReport **

    $30,180,141

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    22/41

    22

    Country: Mali Year: 2010 Quarter 3Total Obligation :$451,611,164

    Entity to which the assistance is provided : MCA Mali Total Quarterly Disbursement : $27,750,705

    Projects Obligated Objective Cumulative Disbursements Measures

    Employment at airport

    Signature of design contract

    Average number of weeklyflights(arrivals)

    Passenger traffic (annual average)

    Percent works complete

    Time required for passenger processingat departures and arrivals

    Percent works complete

    Percent of airport management andmaintenance plan implemented

    Airport meets Federal AviationAdministration (FAA) and InternationalCivil Aviation Organization (ICAO)security standards

    Bamako SenouAirportImprovementProject

    Technical assistance delivered to project

    Main season rice yields

    International roughness index (IRI) onthe Niono-Goma Coura Route

    Average daily vehicle count

    Percentage works completed on Niono-Goma Coura roadNumber of hectares of land irrigated inthe Alatona Canal

    Alatona IrrigationProject $234,884,675

    Increase the agricultural production and

    productivity in the Alatona zone of the ON.

    $46,189,523

    Irrigation system efficiency on AlatonaCanal during the rainy season and the dryseasonCompletion rate of work on theconstruction of the main system (B03)

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    23/41

    23

    Percentage of contracted irrigationconstruction works disbursedNumber of titles registered in the landregistration office of the Alatona zoneNumber market gardens allocated inAlatona zones (for PAPs) (market gardenparcels allotted to PAP women)

    Decree transferring legal control of theproject impact area is passedContractor implementing the Mappingof Agricultural and Communal LandParcels contract is mobilizedNet school enrollment rate (in Alatonazone)Percent of Alatona population withaccess to drinking water

    Number of schools available in Alatona

    Number of health centers available in theAlatonaNumber of affected people who havebeen compensate

    Resettlement Census verified

    Adoption of Rate of ExtensionTechniquesArea planted with rice during the rainyseasonArea planted with shallots during dryseason

    Number of farmers trained

    Water management system design andcapacity building strategy implementedAmount of credit extended to AlatonafarmersNumber of farmers accessing grantassistance for first loan from financialinstitutionsFinancial institution partners identified(report on assessment of the financialinstitutions in the Office du Niger- -Office of Niger zone (ON zone)Loan Portfolio quality of Alatona MFIs:portfolio at risk

    ProgramAdministration* andControl, Monitoringand Evaluation

    $38,005,000 $20,385,241

    Pending SubsequentReport ** $9

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    24/41

    24

    Country: Mongolia Year: 2010 Quarter 3 Total Obligation: $284,902,443

    Entity to which the assistance is provided : MCA Mongolia Total Quarterly Disbursement : $2,169,773

    Projects Obligated Objective Cumulative Disbursements Measures

    Number of studies completedLegal and regulatory reformsadoptedNumber of landholders reachedbypublic outreach efforts

    Training to Leaseholders Intensive and Semi-IntensiveFarmingNumber of Buildingsrehabilitated/constructed

    Value of equipment purchasedRural hectares MappedUrban Parcels Mapped

    Leaseholds Awarded

    Property Rights

    Project

    $27,201,061

    Increase security and capitalization of land assets

    held by lower-income

    Mongolians, and increased peri-urban herder productivityand incomes

    $1,628,930

    Hashaa Plots DirectlyRegistered by the PropertyRights Project Rate of employment of TVETGraduatesStudents completing newlydesigned long-term programsPercent of active teachersreceiving certification training

    VocationalEducation Project

    $47,355,638 Increase employment and income among unemployed and underemployed

    Mongolians

    $2,255,071

    Technical and vocationaleducation and training (TVET)legislation passed Diabetes and hypertensioncontrolledPercentage of cancer casesdiagnosed in early stages

    Health Project $38,974,817

    Increase the adoption of behaviors that reduce non-

    communicable diseases

    (NCDIs) among target populations and improved medical treatment and control

    of NCDIs

    $2,591,403

    Road and traffic safety activityfinalized and key interventionsdeveloped

    ProgramAdministration* and

    $44,294,082 $8,509,865

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    25/41

    25

    Control, Monitoringand Evaluation Pending subsequentreports**

    $43,201

    In late 2009, the MCCs Board of Directors approved the allocation of a portion of the funds originally designated for the railproject to the expansion of the health, vocational education and property right projects from the rail project, and the remainingportion to the addition of a road project.

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    26/41

    26

    Country: Mozambique Year: 2010 Quarter 3

    Total Obligation: $503,444,341

    Entity to which the assistance is provided : MCA Mozambique Total Quarterly Disbursement : $6,505,733

    Projects Obligated Objective Cumulative Disbursements

    Time to get to non-private watersourcePercent of urban population withimproved water sources

    Percent of urban population withimproved sanitation facilities

    Percent of rural population withaccess to improved water sources

    Number of private household waterconnections in urban areasNumber of Rural water pointsconstructed

    Number of standpipes in urban

    areasFinal detailed design for 5 townssubmitted

    Water Supply andSanitation Project

    $203,585,393 Increase access to reliable and quality water and sanitation

    facilities.$4,836,403

    Final detailed design for 3 citiessubmitted

    Kilometers of road rehabilitated

    Percent of Namialo - Rio LrioRoad - Metoro feasibility, design,and supervision contract disbursedPercent of Rio Ligonha-Nampulafeasibility, design, and supervisioncontract disbursedPercent of Chimuara-Nicoadalafeasibility, design, and supervisioncontract disbursedPercent of Namialo - Rio LrioRoad construction contractdisbursedPercent of Rio Lrio - Metoro Roadconstruction contract disbursedPercent of Rio Ligonha - NampulaRoad construction contractdisbursedPercent of Chimuara-NicoadalaRoad construction contract

    disbursedAverage annual daily traffic volume

    Average annual daily traffic volume

    Average annual daily traffic volume

    Road Rehabilitation

    Project

    $176,307,480 Increase access to productive

    resources and markets. $2,639,508

    Average annual daily traffic volume

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    27/41

    27

    Change in International RoughnessIndex (IRI) Namialo Rio LurioRoadChange in International RoughnessIndex (IRI) on Rio Ligonha-Nampula RoadChange in International Roughness

    Index (IRI) on Rio Lurio-MetoroRoadChange in International RoughnessIndex (IRI) on Chimuara-Nicoadala RoadTotal number of officials andresidents reached with land strategyand policy awareness and outreachmessagesTime to get land usage rights(DUAT), urbanTime to get land usage rights(DUAT), rural

    Number of buildings rehabilitated

    or built

    Total value of procured equipmentand materials

    Number of people trained

    Rural hectares mapped in SiteSpecific Activity

    Rural hectares mapped inCommunity Land Fund Initiative

    Urban parcels mapped

    Rural hectares formalized throughSite Specific Activity

    Rural hectares formalized throughCommunity Land Fund Initiative

    Urban parcels formalized

    Number of communities delimited

    Number of households having landformalized, rural

    Land Tenure Project$39,061,959 Establish efficient, secure land

    access for households and investors.

    $4,657,219

    Number of households having landformalized, urban

    Number of diseased or dead palmtrees clearedNumber of coconut seedlingsplanted

    Hectares under production

    Number of farmers trained in pestand disease control

    Farmer IncomeSupport Project

    $18,276,217 Improve coconut productivityand diversification into cash

    crop.

    $2,893,414

    Number of farmers trained in cropdiversification technologies

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    28/41

    28

    Income from coconuts and coconutproducts (estates

    Income from coconuts and coconutsproducts (households)

    ProgramAdministration* andControl, Monitoringand Evaluation

    $66,213,292 $12,447,947

    Pending SubsequentReport **

    $126,168

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    29/41

    29

    Country: Lesotho Year: 2010 Quarter 3

    Total Obligation: $354,167,605

    Entity to which the assistance is provided : MCA Lesotho Total Quarterly Disbursement : $6,566,418

    Projects Obligated Objective Cumulative Disbursements Measures

    School days lost due to water bornediseases

    Diarrhea notification at health centers

    Time saved due to access to watersource

    Rural household (HH) provided withaccess to improved water supply

    Rural HH provided with access toimproved ventilated latrines

    Rural population with knowledge of good hygiene principles

    Urban HH with access to potable watersupply

    Number of enterprises connected towater network

    Households connected to improvedwater network Cubic meters of treated water frommetolong dam delivered through aconveyance system to Water andSewerage Authority(WASA)

    Hydrological flows variability

    Water Project $162,365,440

    Improve the water supply for industrial and

    domestic needs, and enhance rural livelihoods

    through improved watershed management.

    $10,208,610

    Reclaimed area

    People with HIV still alive 12 monthsafter initiation of treatmentTB notification (per 100,000 pop.)Percentage of PLWA receiving ARVtreatment (by age & sex)Deliveries conducted in the healthcenters

    Health Project $121,523,962

    Increase access to life-extending ART and

    essential health servicesby providing a sustainable

    delivery platform.$7,841,121

    Immunization coverage rate

    Average time (days) required toenforce a contract

    Value of commercial cases

    Cases referred to ADR that aresuccessfully completed

    Portfolio of loansPrivate SectorDevelopmentProject

    $35,593,055Stimulate investment by

    improving access to credit,reducing transaction costs

    and increasing the participation of women in

    the economy.

    $3,805,180

    Loan processing time

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    30/41

    30

    Performing loans

    Electronic payments - salaries

    Electronic payments - pensions

    Debit/smart cards issued

    Mortgage bonds registered

    Value of registered mortgage bonds.

    Clearing time Country

    Clearing time - Maseru

    Time to complete transfer of landrights

    Land transactions recorded

    Land parcels regularized andregisteredPeople trained on gender equality andeconomic rightsID cards issued

    Monetary cost of a lease transaction

    ProgramAdministration* andControl, Monitoring

    and Evaluation

    $43,685,148 $13,462,757

    Pending SubsequentReport **

    $207,297

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    31/41

    31

    Country: Morocco Year: 2010 Quarter 3

    Total Obligation: $693,797,181

    Entity to which the assistance is provided : MCA Morocco Total Quarterly Disbursement : $18,500,633

    Projects Obligated Objective Cumulative Disbursements Measures

    Number of farmers trained

    Number of agribusinesses assisted

    Number of hectares under production

    Fruit TreeProductivity Project $298,622,393

    Reduce volatility of agricultural productionand increase volume of

    fruit agricultural production

    $20,851,833

    Value of agricultural production

    Landing sites and ports rehabilitated

    Mobile fish vendors using new equipments

    Fishing boats using new landing sites

    Average price of fish at auctionmarkets

    Average price of fish at wholesale

    Small ScaleFisheries Project $116,168,028

    Improve quality of fishmoving through domesticchannels and assure the

    sustainable use of fishingresources

    $3,381,663

    Average price of fish at ports

    Average revenue of SME potteryworkshops

    Construction and rehabilitation of FezMedina Sites

    Tourist receipts in Fez

    Artisan and FezMedina Project $111,873,858

    Increase value added totourism and artisan

    sectors

    $809,472

    Training of potters

    Number of enterprises in pilot projectreceiving coaching

    Enterprise SupportProject $33,850,000

    Improved survival rate of new SMEs and INDH-

    funded income generatingactivities; increased

    revenue for new SMEs and INDH-funded income

    generating activities

    $3,399,422

    Value added per enterprise

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    32/41

    32

    Survival rate after two years

    ProgramAdministration* andControl, Monitoringand Evaluation

    $87,082,902 $15,148,665

    Pending SubsequentReport ** $3,173,509

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    33/41

    33

    Country: Tanzania Year: 2010 Quarter 3

    Total Obligation: $698,240,000

    Entity to which the assistance is provided : MCA Tanzania Total Quarterly Disbursement : $28,800,268

    Projects Obligated Objective Cumulative Disbursements Measures

    New power customers: Kigoma

    New power customers: Morogoro

    New power customers: Tanga

    New power customers: Mbeya

    New power customers: Iringa

    New power customers: Dodoma

    New power customers: Mwanza

    New power customers: Zanzibar

    Energy generation- Kigoma

    Transmission capacity: Kigoma

    Transmission capacity: Morogoro

    Transmission capacity: Tanga

    Transmission capacity: Mbeya

    Transmission capacity: Iringa

    Transmission capacity: Dodoma

    Transmission capacity: Mwanza

    Energy SectorProject $202,934,428 Increase value added to

    businesses $5,392,310

    Transmission capacity: Zanzibar

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    34/41

    34

    Percentage disbursed for design andsupervision contract ConsultingEngineer (CE) year 1 budgeted:Distribution Rehabilitation andextension activity

    Percentage disbursed for design and

    supervision contract ConsultingEngineer (CE) year 1 budgeted;Zanzibar Interconnector activity

    Percentage disbursed for design andsupervision contract ConsultingEngineer (CE) year 1 budgeted;Malagarasi hydropower and Kigomadistribution activity

    International roughness index:Tunduma Sumbawanga

    International roughness index: TangaHorohoro

    International roughness index:Namtumbo Songea

    International roughness index:Peramiho Mbinga

    Annual average daily traffic: TundumaSumbawanga

    Annual average daily traffic: TangaHorohoro

    Annual average daily traffic:Namtumbo Songea

    Annual average daily traffic: PeramihoMbinga

    Kilometers upgraded/completed:Tunduma Sumbawanga

    Kilometers upgraded/completed:Tanga Horohoro

    Transport SectorProject $366,847,428

    Increase cash croprevenue and aggregate

    visitor spending

    $28,507,733

    Kilometers upgraded/completed:Namtumbo Songea

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    35/41

    35

    Kilometers upgraded/completed:Peramiho Mbinga

    Percent disbursed on constructionworks: Tunduma Sumbawanga

    Percent disbursed on constructionworks: Tanga Horohoro

    Percent disbursed on constructionworks: Namtumbo Songea

    Percent disbursed on constructionworks: Peramiho Mbinga

    Percent disbursed for feasibility and/ordesign studies: Tunduma Sumbawanga

    Percent disbursed for feasibility and/ordesign studies: Tanga Horohoro

    Percent disbursed for feasibility and/ordesign studies: Namtumbo Songea

    Percent disbursed for feasibility and/ordesign studies: Peramiho Mbinga

    International roughness index: Pemba

    Average annual daily traffic: Pemba

    Kilometers upgraded/ completed:Pemba

    Percent disbursed on constructionworks: Pemba

    Signed contracts for constructionworks (Zanzibar Rural Roads)

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    36/41

    36

    Percent disbursed on signed contractsfor feasibility and/or design studies:Pemba

    Passenger arrivals: Mafia Island

    Percentage of upgrade complete: MafiaIsland

    Percent disbursed on constructionworks: Mafia Island

    Number of households using improvedsource for drinking water (Dar esSalaam)

    Number of households using improvedsource for drinking water (Morogoro)

    Number of businesses using improvedwater source (Dar es Salaam)

    Number of businesses using improvedwater source (Morogoro)

    Volume of water produced (LowerRuvu)

    Volume of water produced (Morogoro)

    Water Sector Project $62,562,144

    Increase investment inhuman and physical

    capital and to reduce the prevalence of water-

    related disease$1,993,722

    Percent disbursed on FeasibilityDesign Update contract Lower RuvuPlant Expansion

    ProgramAdministration* andControl, Monitoringand Evaluation

    $53,896,000 $7,339,868

    Pending SubsequentReport ** $206,197

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    37/41

    37

    Country: Burkina Faso Year: 2010 Quarter 3

    Total Obligation: $484,298,973

    Entity to which the assistance is provided : MCA Burkina Faso Total Quarterly Disbursement : $5,552,469

    Projects Obligated Objective Cumulative Disbursements Measures

    Roads Project $194,130,681 Enhance access to marketsthrough investments in the

    road network $404,332

    To Be Determined (TBD)

    Rural LandGovernance Project $60,392,771

    Increase investment inland and rural

    productivity throughimproved land tenure

    security and land management

    $2,185,845TBD

    AgricultureDevelopmentProject

    $141,934,693

    Expand the productive useof land in order to

    increase the volume and value of agricultural

    production in project zones

    $2,775,002

    TBD

    Bright 2 SchoolsProject $26,829,669

    Increase primary schoolcompletion rates

    $28,745,770TBD

    ProgramAdministration* andControl, Monitoringand Evaluation

    $61,011,159 $9,686,605

    Pending SubsequentReport ** $0

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    38/41

    38

    Country: Namibia Year: 2010 Quarter 3

    Total Obligation: $304,477,819

    Entity to which the assistance is provided : MCA Namibia Total Quarterly Disbursement : $9,977,192

    Projects Obligated Objective Cumulative Disbursements Measures

    Education Project $144,976,559 Improve the educationsectors effectiveness,efficiency and quality

    $6,836,450 To Be Determined (TBD)

    Tourism Project $66,959,292

    Increase incomes and create employment

    opportunities byimproving the marketing,

    management and infrastructure of Etosha

    National Park

    $2,207,959 TBD

    Agriculture Project $47,550,008

    Sustainably improve theeconomic performanceand profitability of the

    livestock sector and increase the volume of the

    indigenous natural products for export

    $405,044

    TBD

    ProgramAdministration* andControl, Monitoring

    and Evaluation

    $44,991,960 $6,708,661

    Pending SubsequentReport ** $113,820

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    39/41

    39

    Country: Moldova (PRE-EIF) Year: 2010 Quarter 3

    Total Obligation: $262,000,000

    Entity to which the assistance is provided : MCA Moldova Total Quarterly Disbursement : $0

    Projects Obligated Objective Cumulative Disbursements Measures

    Road RehabilitationProject $132,840,000 $0 To Be Determined (TBD)

    Transition to HighValue AgricultureProject

    $101,773,401 $0 TBD

    ProgramAdministration* andMonitoring andEvaluation**

    $27,386,599$0

    TBD

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    40/41

    40

    Country: Senegal (PRE-EIF) Year: 2010 Quarter 3

    Total Obligation: $540,000,000

    Entity to which the assistance is provided : MCA Moldova Total Quarterly Disbursement : $100,165

    Projects Obligated Objective Cumulative Disbursements Measures

    Road RehabilitationProject $800,000 $0 To Be Determined (TBD)

    Transition to HighValue AgricultureProject

    $6,788,251 $0 TBD

    ProgramAdministration* andMonitoring andEvaluation**

    $382,691$0

    TBD

    Dated: September 10, 2010____________________________T. Charles CooperVice PresidentCongressional and Public Affairs

    *Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.

    **These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reportedas such in subsequent quarterly report(s)

    *** Moldova and Senegal are expected to be obligated in 2010 when they enter into force (EIF).

    619(b) Transfer or Allocation of Funds

    U.S. Agency to which Funds were Transferred or Allocated

    Amount Description of program or project

    USAID$15,073,050

    Liberia Threshold Program

  • 8/8/2019 Millennium Challenge Coorporation April Thru June 2010

    41/41

    Millennium Challenge Corporation

    [FR Doc. 2010-23064 Filed 09/15/2010 at 8:45 am; Publication Date: 09/16/2010]