Data Migration is in our DNA Our Name Our History

Important Facts About Zero Wait-State

Zero Wait-State - Company Confidential

FACTS ABOUT ZWS - IN OUR DNA

Page 3: Migration madness

We are Vendor and Partner Neutral Associate Service Partner and Research Associate for SolidWorks Oracle Gold Partner PLM and PDM Services only

Important Facts About Zero Wait-State

Zero Wait-State - Company Confidential

FACTS ABOUT ZWS - NEUTRAL

Page 4: Migration madness
Page 5: Migration madness

DM IS HARD

Zero Wait-State - Company Confidential

It’s like changing a jet engine in mid air without the plane crashing

Data condition is a variable difficult to estimate

It must be done without disrupting the current production environment

Page 6: Migration madness

DM IS CRITICAL

Zero Wait-State - Company Confidential

Without data a PLM is an empty vessel

Product data is the lifeblood of a company

Bad data can render a PLM or PDM system useless

Page 7: Migration madness

BEST PRACTICES INCREMENTS

Zero Wait-State - Company Confidential

Trying to move all data at once is problematic

Moving data in increments is more manageable

Eliminates time constraints Reduces risk

Page 8: Migration madness

BEST PRACTICIES FORGET IT

Zero Wait-State - Company Confidential

Extracting and transferring history to a new PLM is challenging

Most companies rarely access earlier versions of data

Using a “Latest only” approach dramatically reduces cost and complexity of data migration

Page 9: Migration madness

Garbage In, Garbage Out …

Zero Wait-State - Company Confidential

Just because you can migrate all your data doesn’t mean you should

Take a hard look at legacy data and be selective

Do not pollute your new system with corrupt or inaccurate data

Page 10: Migration madness

Be Prepared

Zero Wait-State - Company Confidential

Don’t “under provision” hardware for data migration

Identify needs and have analysis and data cleansing solutions ready

Clean up your data as much as possible prior to migration

Page 11: Migration madness

Test, Validate, Repeat

Zero Wait-State - Company Confidential

Two test passes and a production pass are minimum recommendations for most migrations

Have a specific test plan to evaluate data in the test system

Resist the urge to truncate testing

Page 12: Migration madness
Page 13: Migration madness

Case Study : Bloom Energy

Zero Wait-State - Company Confidential

Highlights: Moving from PDMlink 9.0 Joint Project with GoEngineer Extracted meta data and SolidWorks CAD data Used drag and drop to load the CAD files and

sent meta data to Agile PLM Customer successfully transitioned from

PDMLink to Agile PLM and EPDM