migrate only past missions & newly awarded missions ( insight )

14
PDSMC November 29-30, 2012 1 PDS Imaging Node PDS4 Migration Lisa Gaddis (USGS) Sue LaVoie (JPL) November 30, 2012 PDS Management Council Meeting UCLA

Upload: kellsie

Post on 23-Feb-2016

54 views

Category:

Documents


0 download

DESCRIPTION

PDS Imaging Node PDS4 Migration Lisa Gaddis (USGS) Sue LaVoie (JPL) November 30, 2012 PDS Management Council Meeting UCLA. Migrate only past missions & newly awarded missions ( InSight ) Justification: for active missions, community analysis is ongoing with existing software & tools - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 1

PDS Imaging Node PDS4 Migration

Lisa Gaddis (USGS)

Sue LaVoie (JPL)

November 30, 2012PDS Management Council Meeting

UCLA

Page 2: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 2

• Migrate only past missions & newly awarded missions (InSight)– Justification: for active missions, community analysis is ongoing with existing

software & tools– Prioritize based on need for class development/follow-on missions and popularity– Retain PDS3 labels & metadata within PDS4 structure

• Migrate mission datasets requiring no (or simple) data manipulation– Retain copy of any data requiring manipulation

• Migrate metadata only of mission datasets requiring data manipulation– Justification: complex data migration is too risky– Retain PDS3 data format & label– Create PDS4 labels and metadata to enable complex data product searches

across all holdings– Decisions/Action required by MC & Data Modelers

• Policy allowing waiving of data migration for complex legacy data sets• Dictionary terms/keywords enabling description of legacy formats

• Modify IMG systems to support both PDS3 & PDS4 data sets & formats

PDS4 Migration Strategy

Page 3: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 3

• Process– Identify data set for migration– Create/update Discipline Classes, provide input to PDS-wide Classes– Map PDS3 to PDS4 labels and ancillary files/data– Create schema– Modify existing software tools & scripts to automatically create labels, collection

and bundles– Generate Sample Bundle(s)– Verify– Iterate– Informal IMG internal review & testing– Load Bundle into IMG Registry– Identify next data set– …..

– Repeat iterative process until Data Model and Classes are “final”, refining all along the way. Then perform the full data set migration on priority data sets

PDS4 Migration Approach

Page 4: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 4

PDS4 Migration - Top Priority Data Sets

Page 5: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 5

PDS4 Migration – Waive Data Format Change

Page 6: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 6

• Clementine 750nm Basemap (Chris)– Sample Bundle validated, reviewed by EN, updated and redelivered for ingestion

• Folders in bundle: data (6 map projected single band images & ISIS detached labels), document (.txt, .doc, .htm, .pdf versions of “volinfo” suite), miscellaneous (delivery & transfer manifests), xml_schema

– Cartography Class - Incorporating Federal Geographic Data Committee (FDGC) model. Still needs fine tuning

– Tools used: oXygen XML Editor, IMG Generate Tool, EN Validate Tool, ad hoc scripts

• Mars Pathfinder (MPF) IMP EDR (Elizabeth)– Sample Bundle validated and delivered to EN for review and feedback

• Folders in bundle: data (200 files), browse (browse for each data file), context (instrument, instrumet host, investigation, resources, etc.), document (EDR SIS), geometry (gazetteer), xml_schema

– Imaging Instrument Parameter Class – in good shape for this data set & Clementine data set

– Tools used: oXygen XML Editor, IMG Generate Tool, EN Validate Tool, ad hoc scripts

Migration Progress

Page 7: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 7

• Clementine UVVIS 5-band Mosaic (Chris)– Multispectral data set– Preliminary Bundle layout defined

• Mars Pathfinder (MPF) RVRCAM (Elizabeth)– Tables and Engineering data sets

• Phoenix OM, RAC, SSI EDR (Amy)– Precursor for InSight (launch 2016; Geo is lead node)

• Landed mission products and metadata• Phoenix, MER, MSL heritage• Work closely with Geo throughout

– Class work: Camera Model, Landed Geometry, Mars InSitu, likely more

Migration – Next Up

Page 8: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 8

• Accomplishments– Installed all PDS2010 software on IMG operational machine, including Registry,

Registry UI, Harvest, and Validate• Used Validate tool on test bundles prior to delivery to EN for review

– Continued development of IMG Generate Tool (label generation) to support ongoing data migration activities

– Created internal IMG Wiki to track PDS4 migration details, progress, lessons learned, open items, versions of dictionaries and schemas used, etc.

• Plans– Harvest test & completed Bundles into IMG Registry– Work with Engineering Node to communicate with central Registry

System & Tools Status

Page 9: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 9

Back-up

Page 10: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 10

Imaging Node: PDS4 Data Migration• IMG manages a lot of

complex data with a wide variety of formats

– 203 data sets, ~13 M products

– Many of these are not PDS4-compliant

• 90% of IMG data sets require

– Assessment & revision of classes of keywords

• Discipline Classes• PDS-wide Classes

– Manipulation of data to achieve compliance

• 25% of IMG data sets

• But, we assume that migration of all data sets is not required

Page 11: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 11

IMG Data Migration: Data Manipulation• Data Manipulation

– 25% of IMG data sets• 52 of 203 data sets

– Potentially very time consuming and costly

– Process:• Engage experts• Software development & testing• V&V• Peer Review?• Release

– Issues:• Retain PDS3 version – forever?

Page 12: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 12

IMG Data Migration: Classes• Class development will require

– IMG for Discipline-specific classes– Cross-node participation for many others

• Classes needed for IMG - prelim analysis (not all included on chart)– Calibration – PDS-wide– Compression – PDS-wide– Geometry

• Camera Model – IMG• Surface Geometry – PDS-wide• SPICE Geometry – PDS-wide

– Cartography – IMG– Imaging Instrument Parameter – IMG– Telemetry Parameters – IMG– Command Parameters – IMG– Processing History – IMG– Imaging Instrument Compression – IMG– Mosaic – IMG– Anaglyph (?) - IMG– Spectral Qube (?) - IMG

Page 13: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 13

PastMissions

Page 14: Migrate only past missions & newly awarded missions ( InSight )

PDSMC November 29-30, 2012 14

ActiveMissions