micah davis portfolio

46
micah A. Davis portfolio

Upload: micah-davis

Post on 26-Jul-2016

236 views

Category:

Documents


1 download

DESCRIPTION

Architectural portfolio for Micah Davis

TRANSCRIPT

  • micah A. Davisportfolio

  • 68

    101214

    18202224

    283032

    363840

    Urban Courthouse

    Corporate Office Park

    Ecuador

    Models

    Mixed-Use Urban Block

    Live Work Center

    London

    Design/Build

    Nature Center

    Sustainable Housing

    China

    Photography

    Art Museum Pavilion

    Urban Park

    Housing & Commercial Development

    Undergraduate work

    Graduate work

    International experience

    Design Interests

  • 2About

    Architecture has been a passion of mine since I was young. My architectural educa-tion has developed my understanding and appreciation of design and architecture throughout the world. The ability to design something and see it built in the world excites me. My goal is to be a licensed architect and design the world around us.

    (402) [email protected]

  • University of Nebraska Lincoln Sustainable Village Design

    University of Nebraska Lincoln

    Sigma Tau Delta Honor SocietyPeer MentorStudent AmbassadorPresident - U.S. Green Builders CouncilStudent Advisory BoardChancellors Leadership Class

    Rhinoceros 3DAutodesk RevitAuto CADAdobe Creative SuiteGIS (ArcMap 10.3)

    University of Nebraska LincolnLondon Study Abroad

    Extreme Water Sports

    University of Missouri Columbia

    Sustainable Urbanism

    Menards

    Masters - ArchitectureGalapagos Islands, Ecuador

    Teaching Assistant

    2014-2016Summer 2014

    2014-2016

    20162012-20162011-20162012-2014

    2011-2014

    2008-2009

    2010-2014

    Spring 2015

    2006-2016

    2008-2010

    Fall 2015

    2009-2012

    Undergraduate - ArchitectureLondon, England

    Operations Manager (2013-2016)

    Undergraduate - Premed

    China

    Sales Associate

    Cumulative GPA: 3.82

    Cumulative GPA: 3.75

    ResumeEducation International Experience

    Work Experience

    Honors & Activities

    Software

  • 4

  • 68

    101214Urban Courthouse

    Mixed-Use Urban BlockNature CenterArt Museum PavilionHousing & Commercial Development

    Undergraduate work

  • 6This urban block was designed to be mixed use and integrate on site parking, retail, and modular residential units. The primary tar-get for the project was student housing. The project was designed with six individual tow-ers in order to provide variety to the owner. Each residential tower is capable of convert-ing between a hotel, student housing, and apartments with a community space on second fl oor.

    Physical Model

    Mixed-Use Urban Block

  • Elevated Courtyard Render

    South West RenderModel Detail

    Model Detail

    North Elevation

  • 8The design for Prairie Pines Nature Center was to encourage visitors to go outdoors and wander through the site. The design created views from the nature center to the surrounding area to view a natural prai-rie and a wetlands. Visual paths were sculpted through the forest, which provided a view from the great hall directly to these places throughout the site.

    Physical Model

    Physical Model

    Nature Center

  • developed wetlands developed prarie

    current wetlands current prarie

    Refined Arboretum developed outdoor classroom

    current Arboretum current outdoor classroom area

    n

    DN

    DN

    DN

    DN

    DN

    Level One3/32=11) Lobby2) Restrooms3) Green Roof4) Dining Room5) Kitchen6) Offices7) Online Classroom8) Dry Lab9) Classroom

    223

    4

    5

    1

    6 7

    89

    Interior Render First Floor Plan

    Views Diagram Site Plan

  • 10

    This pavilion is de-signed to create a focal point for the sculpture garden at the Sheldon Museum of Art at the University of Nebraska Lincoln. The pavilion provides access on multiple levels and provides shade, seating, and a place for events. The multiple levels would provide a variety of spaces for visitors to sit and enjoy the sculp-ture garden as well as provide multiple op-portunities for circula-tion throughout.

    Physical Model

    Art Museum Pavilion

  • Physical Model

    Structural Framing Detail

    3D Printed Base Process

    Light up Base Process

  • 12

    South Sioux City, NE was rapidly expand-ing because of new businesses locating nearby, the need for middle to high in-come homes was ris-ing. The proposed de-velopment provided space for 400 homes in a variety of price ranges. The adjoining commercial district became the center piece and connect-ed the residential and park system which fl owed throughout.

    single family residentialMulti-Family residentialcommercial

    community back yardbioswaleparks

    senior housing roads

    neighborhood market17,000 sq. ft.

    3,600 Sq. Ft.

    3,600 Sq. Ft.

    3,600 Sq. Ft.

    3,600 Sq. Ft.

    4,600 Sq. Ft.

    3,000 Sq. Ft.

    3,000 Sq. Ft.

    3,000 Sq. Ft.

    retail

    retail

    fast food restaurant

    coffee shop

    restaurant

    rental/rapair shop

    bicycle shop

    sports bar

    Commercial Site PlanResidential Site Plan

    Housing & Commercial Development

  • UP

    UP

    DN

    DN

    north-south sectionsCALE: 1/16=1-0

    east-west sectionsCALE: 1/16=1-0

    east elevationsCALE: 1/16=1-0

    north elevationsCALE: 1/16=1-0

    n

    ew

    s

    perspective looking north west

    lEVEL 2 fLOOR pLANSsCALE: 1/8=1-0

    lEVEL 1 fLOOR pLANSsCALE: 1/8=1-0

    retail stores/residential

    fast food restaurant

    kitchen/prep

    kitchen/prep

    coffee shop

    2 bedroom-2.5 bathapartment

    1 bedroom-1 bathapartment

    2 bedroom-1.5 bathapartment

    2 bedroom-1.5 bathapartment

    3 bedroom-2 bathapartment

    BICYCLE REPAIR/RENTAL SHOP

    BICYCLE/SPORTS SHOP

    OUTDOOR RETAIL SPACE

    lEVEL 1 fLOOR pLANS

    perspective looking north east

    sCALE: 1/8=1-0

    WEST ELEVATIONsCALE: 1/16=1-0

    sOUTH ELEVATIONsCALE: 1/16=1-0

    eAST ELEVATIONsCALE: 1/16=1-0

    nORTH ELEVATIONsCALE: 1/16=1-0

    BICYCLE REPAIR

    BACK STOCK

    BICYCLE RETAIL/RENTAL SHOP

    n

    ew

    s

    Physical Model Retail/Residential Board

    Bicycle/Rental Shop BoardPhysical Model

  • 14

    The design is for an urban courthouse in downtown Lincoln, Nebraska. The design was led by the views each user would have to the outside over looking downtown Lincoln. Users would have a different view and circulation path through each level throughout the build-ing.The project focused on creating high qual-ity hand crafted mod-els and designing drawings and images for presentation.

    Physical Model

    Physical Model

    Urban Courthouse

  • DN

    UP

    DN

    UP

    DNUP

    DNUP

    DN

    UP

    DN

    1

    2

    35

    4

    6

    7

    88

    88

    89

    9

    10

    10

    9

    11

    12

    13

    10

    9

    11

    13

    14

    10

    9

    11

    13

    1516

    16

    16

    10

    17

    9

    14

    18

    19

    UP

    12.5

    25

    0

    12.5

    25

    0

    12.5

    25

    0

    12.5

    25

    0

    12.5

    25

    0

    12.5

    25

    0

    12.5

    25

    0

    LAW LIBRARY

    OFFICES

    COURTROOM

    COURTROOM

    COURTROOM

    SUPPORT

    HOLDING

    ATRIUM

    12.5 250

    25 500

    RESTRICTED ACCESS

    PUBLIC ACCESS

    RESTRICTED VS PUBLIC SPACE

    PROGRAMATIC SECTION

    PUBLIC CIRCULATION

    FLOOR 3

    FLOOR 2

    FLOOR 1

    SITE PLAN

    FLOOR 7

    FLOOR 6

    FLOOR 5

    FLOOR 4

    HORIZONTAL CIRCULATION

    VERTICAL CIRCULATION

    ELEVATOR

    COURTROOM SECTION

    ATRIUM PERSPECTIVE

    1) VESTIBULE2) SECURITY CHECKPOINT

    3) SECURITY OFFICE

    4) ATRIUM

    9) CONFERENCE ROOM

    10) GATHERING SPACE

    11) COURT ROOM

    12) CONTROL ROOM

    13) WITNESS ROOM

    14) JURY ROOM

    15) OFFICES

    16) JUDGES OFFICE

    17) BREAK ROOM

    18) LAW LIBRARY

    19) ROOF GARDEN

    5) COFFEE SHOP

    6) MECHANICAL

    7) SECURE ENTRANCE

    8) HOLDING CELLLANCASTER

    COUNTY C

    OURTHOUS

    E105 N

    . 8TH ST. LIN

    COLN NEBR

    ASKA, 6850

    8

    Facade Detail Facade Detail Front Facade Back Facade

    Composite Board

  • 16

  • 18202224Corporate Office Park

    Live Work Center

    Sustainable HousingUrban Park

    Graduate work

  • 18

    As Chinas urban cities continue to grow rap-idly there is becoming an increased need for housing in the city. This project proposed developing schools, housing, and com-mercial into an urban block in Shouguang China. The project provided 1,000 afford-able housing units with the opportunity for all daily needs to be met on site. The site was designed to be Net-Zero for water and electricity.

    Physical Model

    Sustainable Housing

  • Level 10

    Level 23

    Level 36

    Level 49

    Level 512

    Level 615

    Level 717

    Level 820

    Level 923

    Level 1028

    Level 1131

    Level 1234

    Level 1337

    Level 1440

    Level 1543

    Level 1646

    Level 1748

    Level 1851

    Level 1954

    Level 2057

    Level 10

    Level 23

    Level 36

    Level 49

    Level 512

    Level 615

    Level 717

    Level 820

    Level 923

    Level 1028

    Level 1131

    Level 1234

    Level 1337

    Level 1440

    Level 1543

    Level 1646

    Level 1748

    Level 1851

    Level 1954

    Level 2057

    single tower

    DN

    DNUP

    UPUP

    UP

    UPDN

    UP DN

    DN

    UP DN

    section b-b scale: 1:200

    section a-a scale: 1:200

    scale: 1:200

    photo voltaics on roof

    angled roof for water collection

    over hang to increase roof size

    photo voltaic railings

    balconies for shading

    growing level

    sun shades on windowscolor differentiation for towers

    garden walls on lower units

    floor 1-4 scale: 1:200

    floor 5-8 scale: 1:200

    floor 9 scale: 1:200

    floor 10+

    single tower perspective

    a a

    b b

    Level 1

    Level 23

    Level 36

    Level 49

    Level 512

    Level 615

    Level 717

    Level 820

    section a-a scale: 1:20

    sun shades on windowscolor differentiation for towers

    garden walls onlower units

    perspective

    Level 1

    Level 23

    Level 36

    Level 49

    Level 512

    Level 615

    Level 717

    Level 820

    section b-b scale: 1:200

    N th

    South West Elevation scale: 1:200

    North West Elevation scale: 1:200

    South East Elevation scale: 1:200

    North East Elevation scale: 1:200

    nnn

    Individual Tower Board

    Model from AboveModel DetailModel DetailModel Detail

    Perspective into Courtyard Site Plan

    Tower Perspective

  • 20

    The Urban Park was a continuation of the housing project in Shouguang China. The park was designed to be a linking piece be-tween the affordable housing, market rate housing, and schools. The park provides rec-reation space, small commercial, a living machine for water fi l-tration, a lake, and a small mountain. The park design focused around several exist-ing relics on site includ-ing a large grain silo and concrete arches.

    Physical Model

    Urban Park

  • affordable housing

    existingtank

    existingtower

    public toilets

    parkoffice

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    pavillion

    affordable housing

    commercial

    commercial

    commercial

    affordable housing

    affordable housing

    affordable housing

    site planscale: 1:300

    n

    affordable housing

    affordable housing

    markethousing

    livingmachine

    livingmachine

    livingmachine

    markethousing

    Process Models Final Model Site Plan

  • 22

    The live-work center is an urban infi ll and multi-use project in the city of London. The building provided a public social space on the lower fl oors , small/start up business space on the middle fl oors and a residential space on the upper fl oors. The project was divided into public and private space for each function which was separated by a central core which also served as the atri-um into the building.

    Exterior Perspective

    Live-Work Center

  • RE

    T

    A

    I

    L

    /

    C

    A

    F

    E

    O

    F

    F

    I

    C

    E

    L

    I

    V

    I

    N

    G

    1" = 10'-0"1Section 1

    SCALE: 1 = 10

    UP

    Section PerspectiveBuilding Section

  • 24

    This project began by taking an in-depth look at the typology of Mat (waffl e) offi ce buildings. The study looked at what made them successful, what qualities they could provide, and their potential uses as an offi ce building. The proposed prototype is a corporate offi ce park. It is intended to be a single headquar-ters for a business, but could be subdivided into multiple offi ces with various leasing depths and square footage.

    Entrance to Offi ce Building

    Offi ce Building Cantilevering over Lake

    Corporate Office Park

  • 5 FLOORS30 LEASING DEPTHS

    390 X 450550,000 SQ. FT.

    4 EAGRESSES

    3 FLOORS30 LEASING DEPTHS

    540 X 540585,000 SQ. FT.

    4 EAGRESSES

    30 FLOORS45 LEASING DEPTHS

    120 X 6901,620,000 SQ. FT.

    5 EAGRESSES

    8 FLOORS30 LEASING DEPTHS

    530 X 530630,000 SQ. FT.

    6 EAGRESSES

    7 FLOORS45 LEASING DEPTHS

    330 X 430410,000 SQ. FT.

    3 EAGRESSES

    60 FLOORS45 LEASING DEPTHS

    270 X 2701,950,000 SQ. FT.

    2 EAGRESSES

    M

    U

    L

    T

    I

    P

    L

    E

    M

    O

    D

    U

    L

    E

    S

    I

    Z

    E

    S

    O

    V

    E

    R

    L

    A

    P

    P

    I

    N

    G

    M

    O

    D

    U

    L

    E

    S

    M

    U

    L

    T

    I

    P

    L

    E

    C

    O

    U

    R

    T

    Y

    A

    R

    D

    S

    M

    U

    L

    T

    I

    P

    L

    E

    T

    O

    W

    E

    R

    S

    O

    V

    E

    R

    L

    A

    P

    P

    I

    N

    G

    M

    O

    D

    U

    L

    E

    S

    V

    E

    R

    T

    I

    C

    A

    L

    M

    O

    D

    U

    L

    E

    S

    L

    I

    N

    E

    A

    R

    C

    O

    M

    B

    S

    H

    E

    X

    A

    G

    O

    N

    C

    O

    M

    B

    S

    S

    L

    A

    N

    T

    E

    D

    T

    O

    W

    E

    R

    TENANT 1

    30 SPACING

    30 MODULES

    150 LENGTH

    45 LEASING DEPTH

    30 LEASING DEPTH

    100 MODULE LENGTH

    45 LEASING DEPTH

    45 LEASING DEPTH

    TENANT 3

    TENANT 2

    TENANT 1

    TENANT 1

    TENANT 3

    T

    E

    N

    A

    N

    T

    2 TENA

    NT 4

    TENANT 6

    TENANT 7 TENANT 8

    TENANT 5

    TENANT 2

    TENANT 4TENANT 3

    TENANT 1 TENANT 2 TENANT 3

    TENANT 4

    TENANT 6

    TENANT 7

    TENANT 1 TENANT 2 TENANT 3 TENANT 4

    TENANT 8

    TENANT 9

    TENANT 10

    TENANT 11

    TENANT 5

    TENANT 1 TENANT 2 TENANT 3

    TENANT 4TENANT 12

    TENANT 11 TENANT 5

    TENANT 6TENANT 10

    TENANT 9 TENANT 7TENANT 8

    UP

    UPDN

    DN

    Typology/Prototype Study

    Offi ce Building Floor Plans

  • 26

  • 283032

    283032

    EcuadorLondonChina

    International experience

  • 28

    The experience be-gan by learning about the culture in Quito. Once on the Gala-pagos Islands our group worked with a small community to develop plans for a local park. The park was master planned and specifi c elements were designed using materials and build-ing capabilities on the island. All presen-tations and meetings involved the commu-nity and were given in Spanish.

    Ecuador-Sustainable Village Based DesignQuito, EcuadorPuerto Ayora, Galapagos Islands

  • N2m 10mN

    Green Space

    Play Area

    Courts

    Art Potential

    Stage

    Shade Structure

    Entry Marker

    Tranparent Boundary

    Northeast Entrance

    nacnuDsal sI

    Park OverlookStage Location

    Southeast Entrance

    South Entrance

    Future Development

    Playground

    Bathroom

    Northwest Entrance Amphitheater

    Hotel

    Flexible Court Space

    Flexible Court Space

    Playground Location

    Playground Location

    Building Site

    Proposed Site Plan Proposed Pavilion

    Community PresentationView from Island

  • 30

    The London Study Abroad was a se-mester long experi-ence which allowed one to be immersed in the culture. The program included a large amount of travel which provided the opportunity to experi-ence many different cultures and visit many historical and famous architectural sites. Studio classes were taught throughout the city and included cri-tiques and feedback from architectural fi rms in London.

    United Kingdom-London Study AbroadLondon, United KingdomPrague, Czech RepublicBerlin, GermanyBarcelona, SpainParis, FranceDublin, IrelandRome, ItalyMilan, ItalyAthens, GreeceLisbon, PortugalCopenhagen, DenmarkAntalya, TurkeyIstanbul, TurkeyBudapest, HungaryDubai, United Arab Emirates

  • Time Clock, Prague, Czech Republic RER Train Stops, Paris France

    Photo Essay

    Mapping Exercise, Barcelona Spain Kings Cross Subway Station Diagram

    London Skyline

  • 32

    The China Sustain-able Urbanism study abroad was part of a studio experience which continued once back in the U.S. Visiting China provid-ed the opportunity to experience the cul-ture, building styles, transportation, life style, and food. The experience allowed us to understand how and why China oper-ates in a different way than the United States.

    Hong KongShenzhenShanghaiNanjingTianjinBeijing

    China-Sustainable Urbanism

  • Advertisement, Hong Kong Yu Garden, Shanghai

    Forbidden City, BeijingNational Stadium/Birds Nest

  • 34

  • 363840

    ModelsDesign/BuildPhotography

    Design Interests

  • 36

    One of my interests throughout my archi-tecture degree has been building scale models. Models give a project a sense of being built and rep-resent a project in a way that drawings on paper can not always achieve.

    The Lincoln Racquet Club was looking to expand their facilities and needed a model to show patrons their plans for the expan-sion.

    Models

  • This model was built as a studio project and was a proposed expansion for campus housing while pro-viding a connection to ex-isting buildings.

    This model was built for Ar-chitect Peter Hind in order to provide a visual propos-al for a new home East of Lincoln.

  • 38

    A boat rental compa-ny at Lake Okoboji, IA was looking to invest in a new rental boat for their customers. In-stead of buying new, one of the existing boats was re-built. The boat was designed with the clients in mind providing maximum capacity for rentals, easy cleaning abilities, and a modular design which provides easy opportunity to repair or replace parts when damaged. The reno-vation fi nished within budget and required time frame.

    Proposed Exterior & Interior

    Design/Build

  • Existing Boat before renovation. The in-terior and exterior had been heavily damaged.

    The existing console was re-purposed for the new boat. Each piece was painted and new switches and dials were in-stalled to accom-modate new tech-nology

    The existing struc-ture was upgraded in order to accom-modate a heavier motor . The stern was also extended to create a swim deck.

    The interior allows for 16 persons to be seated comfort-ably and provides a multi-channel speaker system and lighting package

    The new fl ooring was marine grade plywood with vinyl decking which al-lows it to withstand the marine envi-ronment and be cleaned easily.

    The exterior graph-ics were designed and printed on the inside of poly carbonate panels which provides long term durability and UV resistance.

  • 40

    While traveling on study abroad trips my passion for photog-raphy has continued to grow. My goal is to capture the urban environments and na-ture at night. The early evening allows one to capture the city in a transition from day light to artifi cial light-ing at night. Each city provides a different atmosphere whether it is street lighting, lit buildings, or an active water front.

    London Eye, London UK

    Port Vell, Barcelona Spain

    Photography

  • Dubai Marina, Dubai U.A.E.

    Burj Al Arab, Dubai U.A.E. Tianjin River Front, Tianjin China

    Pudong Skyline, Shanghai China

  • Micah A. Davis(402) [email protected]