| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4 TH JUNE 2014

Upload: truongtram

Post on 24-Feb-2018

243 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 1

Presented by Arhis and EDF

MDM PROJECT BEST PRACTICEINFORMATICA DAY 4TH JUNE 2014

Page 2: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 2©www.arhis.com 2014

AGENDA

1. Presenting Arhis

1. Arhis presentation and value proposition

2. Arhis MDM projects approach.

3. Arhis MDM Factory

4. Energy domain MDM implementation

2. Presenting EDF Business case

1. Presenting EDF

2. EDF Hydro Generation

3. PRERHY Project

4. Project scope and achievements

3. Q&A

Page 3: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 3©www.arhis.com 2014

ARHIS VALUE PROPOSITION A SWISS LEADER IN THE MDM FIELD !

Our focus is Master Data Management

Arhis is a clear leader in the MDM implementation space since its creation with more than 30 success stories

Capitalizing on Best Vendors solutions

A unique expertise on key vendors solutions (Informatica)

A value-added offering with a team of highly qualified MDM Hub engineers

Implementation best practices combined with a proven MDM project methodology.

Our value proposition : Customer Satisfaction at a reasonable Total Cost of Ownership

Speed of execution

Reliability in quality and delivery

Strong commitment

Flexibility and adaptability : Agile methodology

Page 4: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 4©www.arhis.com 2014

ARHIS : A STRONG MDM EXPERTISERECOGNIZED WORLDWIDE

Page 5: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 5©www.arhis.com 2014

ARHIS : MDM PROJECT APPROACHPHASED, ITERATIVE APPROACH USING INFORMATICA AND ARHIS TOOLS

“Agile” Iterations

ARHISFactory Tools

Page 6: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 6©www.arhis.com 2014

ARHIS MDM FACTORYBEST PRACTICES AND ACCELERATOR TOOLS

Methodology and Skills :

Factory Concepts have proven to work in large projectsArhis has delivered MDM Vanilla in less than 2 months

100 screens , 80 base objects

Tools :Schemagen concepts adopted by EDF and large customers as Arhis methodology

Datagen intensivelly used for data generation (Tests)

SiFTester WebService Framework deployment accelerator

Reusable Components shapes : IDD User exits, Security Modules, GIS IDD Components, ….

Page 7: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 7©www.arhis.com 2014

MDM IMPLEMENTATIONS OPTIONSMULTI-DOMAIN / MULTI-STYLES

Page 8: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 8©www.arhis.com 2014

ARHIS : MDM IN THE ENERGY SECTORVERY CENTRALISED HYBRID STYLE MDM IMPLEMENTATIONS

System live (Q2 2014)

Live by Q4 2014

Zurich Informatica day 2013“GRT Gaz owns and operatesthe largest High PressureNatural Gaz network inEurope”

This year we present :“A world leader in electricity”

Hybrid

Very Centralized

“Assets” MDM

Page 9: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

EDF PRERHY

Informatica DayJune 2014

Page 10: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 10

EDF: A GLOBAL LEADERIN ELECTRICITY

We are a world leader in electricityCovering all activities: generation (from nuclear to renewables), networks, sales and trading

We are an international groupWith roots in Europe and long-term partnerships and cooperation agreements in high-growth countries

Key Figures :

€72.7 billion in sales

39.3 million customers

159,740 employees worldwide

84.7% of generation does not emit CO2

EDF PRERHY - Informatica Day - june 2014

Page 11: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 11

EDF: AN INTERNATIONAL GROUP

EDF PRERHY - Informatica Day - june 2014

Page 12: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 12

EDF: ELECTRICITY GENERATION IN FRANCE

EDF PRERHY - Informatica Day - june 2014

Generation : Nuclear: safety reinforced, Flamanville EPR to generate its first TWh in 2016 Hydropower: SuperHydro renovation program 73% (2012 results) completed and

RenouvEau project being deployed

CO2: 95.9% carbon-free

Page 13: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 13

EDF: HYDRO GENERATION IN FRANCE

EDF PRERHY - Informatica Day - june 2014

2 700MW

7 600MW

2 500MW

2 600MW

4 600MW

DPIH (Direction of HydroPower Engineering & Generation) : 4 800 employees 5 Generation Units (Est, Alpes, …) 2 Engineering Units (CIH, DTG)

447 power plants , 1 200 generators From 100 kW to 1 800 MW

• 10% > 100 MW (50% of total)• 50% < 12 MW (10% of total)

640 dams , 3 500 valves

1 500 km galleries

270 km penstocks

Among them 100 are operated remotely

14 000 MW can be available in 20 min

Page 14: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 14

PRERHY PROJECT : CONTEXT & STAKES PRERHY : « Projet de REnovation du Référentiel des moyens de production de

L'HYdraulique »

Renovation of the Hydropower Generation Assets Frame of Reference

CONTEXT : Several changes have significant impacts on DPIH organization :

Deployment of the RenouvEau renovation program :• Strong evolution of hydropower generation business processes• Supported by a big effort to modernize the information system

Increase of regulatory constraints (safety)

A lot of hydro concessions to be renewed during the next years

STAKES : Governance of Master Data identified as a key success factor

To keep a strong knowledge of the generation portfolio

To validate and share master reference data among all stakeholders, from engineering to generation teams

EDF PRERHY - Informatica Day - june 2014

Page 15: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 15

PRERHY: OBJECTIVES & MDM PROJECT OBJECTIVES :

Overhaul of the repository of hydropower generation assets description• Extension of the depth of assets description• Evolution to become master of data on its scope of data

Initialize master data values with a quality level sufficient to be recognized as the truth

Set up the master data governance organization at the DPIH level

MDM Project :

New « DoReMHy v3 » application will be based on a MDM solution :• In March 2013 , EDF has selected Informatica MDM Hub with BPM ActiveVOS option• Use of ETL PowerCenter and Informatica Data Quality

Project plan has an iterative roadmap to implement business objects, services and interfaces

On going : 1st iteration, (version) to be deployed in production end of 2014

3 iterations scheduled until end of 2015

EDF PRERHY - Informatica Day - june 2014

Page 16: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 16

PRERHY: ESTIMATE OF KEY FIGURES

31 Business Objects , classified into 19 « Categories »

290 Attributes , up to 45 attributes per Business Object

21 DataBases as source or / and target

<= 100 000 records with an estimate of 10% renewal per year

Potential Declared Users at the end of the project : 10 Administrators (business) 50 Data Stewards 1 000 Users with ability to create, modify, validate master data Up to 4 500 Users in consultation

EDF PRERHY - Informatica Day - june 2014

Page 17: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 17

PRERHY : ITERATIVE MDM IMPLEMENTATION

EDF PRERHY - Informatica Day - june 2014

Page 18: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 18EDF PRERHY - Informatica Day - june 2014

PRERHY : TECHNICAL ARCHITECTURE

Page 19: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 19

ACHIEVEMENTS : P1 DELIVERED IN DUE TIME !ITERATION 1 = P1 + P2

EDF PRERHY - Informatica Day - june 2014

Bugs Fixing

P1 Documenta

tion delivery

Take

Ove

r

Business RulesMatch and Merge Rules

TestsPrep

HU

B M

odel

TechnicalAcceptance

Périmètre 1

IDD

M

odel

TestsPrep

Input / Output Flows

Tests Prep

MDM HUB UI FLOWS

Nov 1 Nov 2 Dec 1 Dec 2 Jan 1 Jan 2 Fev 1 Fev 2 Mars12013 Année 2014

Project Management

Architecture and technical coordination

STA

RT

End 2 End

End 2 End

End 2 End

IDD ConfigurationCustomization

Presentation of « Vanilla»

IT acceptancetests

EDF Package Installation

Installation Packages

Mars22014

End of March

P2 StartP1

Page 20: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 20

ACHIEVEMENTS ITERATION 1 – PART 1

EDF PRERHY - Informatica Day - june 2014

DV3P1

Around sixty base objects tables

More than sixty rules to implement between the ETL (Powercenter) and MDM HUB

Complexity of datastewardship controls, cardinalities, cleansing,

A rich User Interface

Incoming flows from seven source systems : Init, import, export

Page 21: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 21

NEXT STEPS

EDF PRERHY - Informatica Day - june 2014

1. FINISH P2 - ITERATION 1 CONSTRUCTION

2. GET IT ACCEPTANCE FOR P2 (END OF Q2)

3. GET USER ACCEPTANCE (Q3)

4. GO LIVE (Q4 2014)

5. ITERATION 2, 3 , … (2014, 2015…)

6. GO NUCLEAR ????

Page 22: MDM PROJECT BEST PRACTICE -  · PDF file| 1 Presented by Arhis and EDF MDM PROJECT BEST PRACTICE INFORMATICA DAY 4THJUNE 2014

| 22

Q&A

EDF PRERHY - Informatica Day - june 2014

THANKS FOR YOUR ATTENTION !