4
MCP INTEGRATION TEST. BASIS OF SIMULATION 1) SUCTION PRESSURE ANDD TEMPERATURE IS CONSIDERED CONSTATNT. 2) SET POINT IS GENERATED BASED ON NUMBER OF UNITS IN OPERATION LIKE IF NO UNIT IS RUNNING THEN DEMAND GENERATED BY MCP ALGORITHM .I.E. A60LC_SET IS AS FOLLOWING A) 180 IN OF H20, 448 mbar IF BOTH UNITS NOT RUNNING B) 94.34 IN OF H20 ,234mbar IF EITHER UNIT IS RUNNING C) 66.61 IN OF H20,164 mbar WHEN BOTH UNITS ARE RUNNING THE ABOVE IS BASED ON THE TWO UNITS OF IST STAGE IN LOAD CONTROL. THE ABOVE VALUES FOR THE DEMAMND GENERATED BASED ON THE COMPRESSOR CURVES AS SHOWN BELOW SOS0439121 REV 2 BASED ON THE ABOVE DEMAND (LOAD) SET POINTS, EXTRAPOLATION HAS BEEN DONE FROM SPEED VS DISCHARGE FLOW, SPEED VS DISCHARGE PRESSURE AND SPEED VS DISCHARGE TEMPERATURE.

Upload: ajaysapru

Post on 19-Dec-2015

251 views

Category:

Documents


3 download

DESCRIPTION

Mcp Integration

TRANSCRIPT

Page 1: Mcp Integration

MCP INTEGRATION TEST.

BASIS OF SIMULATION

1) SUCTION PRESSURE ANDD TEMPERATURE IS CONSIDERED CONSTATNT.

2) SET POINT IS GENERATED BASED ON NUMBER OF UNITS IN OPERATION LIKE IF NO UNIT IS RUNNING THEN DEMAND GENERATED BY MCP ALGORITHM .I.E. A60LC_SET IS AS FOLLOWING A) 180 IN OF H20, 448 mbar IF BOTH UNITS NOT

RUNNING B) 94.34 IN OF H20 ,234mbar IF EITHER UNIT IS

RUNNING C) 66.61 IN OF H20,164 mbar WHEN BOTH UNITS

ARE RUNNING

THE ABOVE IS BASED ON THE TWO UNITS OF IST STAGE IN LOAD CONTROL.

THE ABOVE VALUES FOR THE DEMAMND GENERATED BASED ON THE COMPRESSOR CURVES AS SHOWN BELOW

SOS0439121 REV 2

BASED ON THE ABOVE DEMAND (LOAD) SET POINTS, EXTRAPOLATION HAS BEEN DONE FROM SPEED VS DISCHARGE FLOW, SPEED VS DISCHARGE PRESSURE AND SPEED VS DISCHARGE TEMPERATURE.

THIS EXTRAPOLATION POINTS ARE DERIVED FROM COMPRESSOR CURVES.

THE SIMULATION COMPRESSOR IS BROUGHT TO THE LOADING CONDITION WHEN NEITHER OF THE COMPRESSOR WAS RUNNING, THE DEMAND WAS HIGH I.E 180MBAR.

WHEN T1 UNIT IS READY TO LOAD, THE DEMAND SET POINT WAS 94.34 MBAR. THE SET POINT WAS GRADUALLY DECREASSED FROM 180 TO 94.34 MBAR .BASED ON DEMAND THE SPEED AND DISCHARGE CHANGED TO 105% OF PT SPEED (6825 RPM) ,DISCHARGE PRESSURE WAS 32 BAR.

Page 2: Mcp Integration

THEN UNIT T2 WAS BROUGHT TO LOADING CONDITION, THE DEMAND CHANGED FROM 94.34 MBAR TO 66.61 M BAR FROM MCP GRADUALLY.CORRESPONDINGLY T1 STARTED TO DECREASE THE SPEED OF PT SHAFT FROM 6825 RPM TO 6510 RPM AND UNIT T2 PT SHAFT INCREASED TO 6510 RPM.

NOTE THE FLOW MBAR MEASURED BY BOTH THE UNITS WAS COMING TO NEARLY EQUAL TO MCP DEMAND GENERATED .I.E 165 M BAR.THE SNAP S

Page 3: Mcp Integration
Page 4: Mcp Integration