may 6, 2016 doug mcleod - transportation research...

40
May 6, 2016 Doug McLeod Planning Manager, Mobility Performance TRB Performance Management Committee TRB Highway Capacity and Quality of Service Committee 5/6/2016 Florida Department of Transportation Reporting of Consistent Mobility Performance Measures for Express Lanes Projects

Upload: others

Post on 23-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

May 6, 2016

Doug McLeodPlanning Manager, Mobility PerformanceTRB Performance Management CommitteeTRB Highway Capacity and Quality of Service Committee

5/6/2016Florida Department of Transportation

Reporting of Consistent Mobility Performance Measures for Express 

Lanes Projects

Page 2: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Presentationin developing consistent mobility performance measures for express lanes projects

Florida’s effortFlorida’s effort

Probable FHWA requirement for travel time reliability

Overview of mobility performance measuresOverview of mobility performance measures

on major issues, measures, goals Positions takenPositions taken

2

Page 3: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Why is this Mobility Performance Measures Topic important?

How well are express lanes performing?Are we providing the mobility desired?

3

Page 4: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

FDOT’s Views of Express Lanes

To ensure the sustainable success of the lanes, the approach must include the following consideration:

• Travel Time Reliability• Travel Options for Drivers• Enhanced Transit Operations

• Dynamic Congestion Pricing

Express Lanes Policy

“In an effort to better manage congestion and provide choices to drivers, Express Lanes are required for additional capacity on limited access facilities on the SHS”

Express Lanes Vision

Express Lanes Vision

Provide choices to drivers

Manage Congestion

Page 5: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Status of Florida’s Express Lanes Projects

293 miles of Express Lanes in Planning

20 miles of Express Lanes in operation

108 miles of  Express Lanes under construction

2 – 5 Years

5 – 25 Years

Current

Page 6: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Southeast Florida Express Lanes in 

ProductionStages

6

Page 7: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

PremierMobility Performance Measures Program

7

in the nation

Recognized as a 

Page 8: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

FREIGHT

Importance of Mobility

8

“Providing                        for people and goods is transportation’s most essential function.” 

mobility

Mobility performance measures

MAKE SENSE

PEOPLE

Page 9: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Dimensions of MobilityTo adequately address mobility, all four dimensions should be emphasized and multiple performance measures used.

9

Page 10: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Quantity

10

How much

Page 11: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Quality

11

How good

How bad

Page 12: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

How Easy

Accessibility

12

Page 13: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Capacity Utilization

13

Page 14: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Applicability of Dimensions to All Modes/Projects (Express Lane Projects)

Travel Time Reliability/Variability

Number of Vehicles/People

Capacity < 1 

Access at specific locations

Page 15: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of TransportationFlorida Department of Transportation

aaaaaaaaaaaaaaaa

MAP‐21 Requirements

15

USDOT wants States and MPOs to do performance based planning

15

Page 16: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

MAP‐21 National Goal Areas for the Federal Aid Highway Program

SafetySafety

Infrastructure ConditionInfrastructure Condition

Congestion Reduction

System ReliabilitySystem ReliabilityFreight Movement and Economic VitalityEnvironmental SustainabilityEnvironmental Sustainability

Reduced Project Delivery DelaysReduced Project Delivery Delays

16

Page 17: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation 17

Page 18: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Reliability/Variability Components

Congestion (traditional capacity analysis)

Weather effects

Incidents 

Work zones

18

Page 19: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

There are two general types of travel time reliability performance measures:

Percent of trips that “succeed”

Comparison of variability in travel times

Travel Time Reliability# Trips

Travel Time

Success Measure# Trips

Travel Time

Free flow time

50thpercentile

95thpercentile

19

Page 20: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

On‐time arrival (Reliability) –

Likelihood a traveler will arrive at a destination in a reasonable 

amount of time. 

On‐time arrival (Reliability) –

Likelihood a traveler will arrive at a destination in a reasonable 

amount of time. 

Planning time index (Variability) –

How much travel time varies for a traveler. 

Planning time index (Variability) –

How much travel time varies for a traveler. 

FDOT Has 2 Primary Measures for Reporting of Travel Time Reliability

20

Additional time

Expected

# Trips

Travel Time

Success Measure

(Especially relevant to Express Lanes)

Page 21: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

FDOT Has 2 Primary Measures for Reporting of Travel Time Reliability

21

Measured by – Percent of time freeway trips able to travel at least 45 mph in Florida’s largest urbanized areas or at least within 5 mph of the posted speed limit elsewhere.

Suggested wording for understanding Travel Time Reliability measures

On‐time arrival (Reliability) –

Likelihood a traveler will arrive at a destination in a reasonable 

amount of time. 

On‐time arrival (Reliability) –

Likelihood a traveler will arrive at a destination in a reasonable 

amount of time. 

# Trips

Travel Time

Success Measure

(Especially relevant to Express Lanes)

Page 22: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Essentially we’re telling travelers you 

can expect to

Express Lanes

Express Lane projects are probably the single best example of the first definition of travel time reliability

22

Travel at  least 45mph 

& arrive on time

Page 23: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

FDOT Has 2 Primary Measures for Reporting of Travel Time Reliability

23

Suggested wording for understanding Travel Time Reliability measures

Measured by – A ratio comparing how long it takes a traveler to make a trip near the posted speed limit compared to how long it takes to not be late once a month. How much additional time a traveler should budget to ensure on‐time arrival 95 percent of the time. A value of 2 means it will take a traveler twice as long to make a trip than under no congestion. 

Planning time index (Variability) –

How much travel time varies for a traveler. 

Planning time index (Variability) –

How much travel time varies for a traveler. 

Additional time

Expected

Page 24: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

FDOT Mobility Performance Measures Express Lanes Effort

24

Page 25: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Consensus in approach and measures25

FDOT’s Mobility Performance Measures Express Lanes Effort

Page 26: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

No National Requirements/Guidance

Requirements for converting HOV lanes 

to express lanes

90% of peak period time traveling at 

45+mph

But no guidance on new express lane facilities if no HOV 

component

But no guidance on new express lane facilities if no HOV 

component

26

Page 27: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

FDOT’s Mobility Performance Measures Express Lanes Coordination

10/15 10/15 

3/16 3/16 

4‐5/16 4‐5/16 

8/16 8/16 

10/16 10/16 

27

Coordination among FDOT offices involving current Express Lanes projects 

– Consistent measures for all express lane facilities– Discussion of numerous issues and topics

General agreement on issues and topics among FDOT offices involving current express lane projects 

General agreement on issues and topics among all FDOT offices involving current and future express lane facilities

Output from all current express lane facilities

Official FDOT guidance

Page 28: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

ScopeAddresses mobility performance measures

Existing express lane facilities

Conversions to express lane facilities

New express lane facilities

Does NOT include

Incident management/conditions/clearing

Financial/economic considerations

Traveler information/signage

Other system operational measures 

Customer satisfaction/complaints

Citation tracking

Page 29: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Mobility Performance Measure Issues

• Separate Reporting• Peak Hours• Closures• Free Flow Speed• Segmentation• Directional Analysis

• Measures to report• Source of speed data• Source of volume data• Reporting frequency• Operational goal

29

Page 30: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

District reports 

go to C.O.

District reports 

go to C.O.

Transportation Statistics

Traffic Engineering

Separate Reportingat Statewide and Local Levels

30

Statewide analysis, some measures 

need to be reported consistently

Appropriate to have separate reports for reporting locally and 

statewide

Appropriate to have separate reports for reporting locally and 

statewide

District flexibility in reporting locally

Page 31: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Peak Hours/Periods

For statewide reporting purposes only

6:00‐ 9:00 a.m. weekday 

(excluding holidays)

4:00‐ 7:00 p.m. weekday 

(excluding holidays)

31

(not necessarily for operations)

Page 32: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Closures

For statewide reporting purposes only

Only during applicable times when the facility is operational

All applicable periods of time regardless of whether lanes are closed or are reduced in operation efficiency

32

(not necessarily for operations)

Page 33: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Free Flow Speed

33

Posted speed Limit

5 MPHFree‐flow speed

Page 34: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Segmentation

For statewide reporting purposes only 

Identified by District entity

Coordinated with C.O. Transportation 

Statistics

34

(not necessarily for operations)

Major ingress/egress points 

Page 35: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Directional Analysis

Peak direction as determined by District entity

Two‐way

35

Page 36: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Applicability of Dimensions to All Modes/Projects (Express Lane Projects)

Travel Time Reliability/Variability

Number of Vehicles/People

Capacity < 1 

Access at specific locations

Page 37: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Measures to Report

For statewide reporting purposes

37

VehicleOn‐time arrival

Travel time 

variabilityPerson

ThroughputTravel time reliability

Page 38: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Operational GoalStatewide target 

(not for each facility)

38

95% at least 45 mph

Of each 15‐minute time period

For each peak period (so 12 analysis periods)

For each direction

90% at least 45 mph(may be higher for each entity)

Of each 15‐minute time period

For each peak period (so 12 analysis periods)

For each direction

Facility

Page 39: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Express Lanes Handbook

• Provides Florida specific guidelines

• Answers important questions related to Express Lanes project development

• Guidance on planning, implementation and operations

Not a one size fits all

Page 40: May 6, 2016 Doug McLeod - Transportation Research Boardonlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S9-McLeod.pdf · May 6, 2016 Doug McLeod Planning Manager, Mobility Performance

Florida Department of Transportation

Presentationin developing consistent mobility performance measures for express lanes projects

Florida’s effortFlorida’s effort

Probable FHWA requirement for travel time reliability

Overview of mobility performance measuresOverview of mobility performance measures

on major issues, measures, goals Positions takenPositions taken

40