MassDEP’s Discussion Document Overview. 7 March 2014. Background. MassDEP convened WNTAG to advise the Department on how to craft an effective regulatory & policy response to Wind Turbine noise impacts Scope: Potential revision to existing noise policy Pre-construction impact assessment - PowerPoint PPT PresentationTRANSCRIPT
7 March 2014
04/22/23 1
MassDEP convened WNTAG to advise the Department on how to craft an effective regulatory & policy response to Wind Turbine noise impacts
Scope:◦ Potential revision to existing noise policy
◦ Pre-construction impact assessment◦ Pre-construction permitting process◦ Post construction compliance sampling
2
Approaches to Determining Compliance with Noise policy
Pre-Construction Permitting
Additional Recommendations
Next Steps
04/22/23 3
Retain the10 dBA above background limit
Approach For Discussion: Leq + Adjustment Factor- L90 ≤ 10dBA
◦ Adjustment Factor to be determined (to be protective)
◦ Collect at least 15 minutes of data Turbine “On” and Turbine “Off” under comparable wind conditions
◦ “A’ Weighted sound collected on “Fast” setting
04/22/23 4
Alternative Raised:◦ Collect 1 Second LAFmax withTurbine “On” and Turbine “Off”
◦ Compare L90 of 1 Second LAFmax Turbine “Off” to 1 second LAFmax Turbine “On” + Adjustment Factor
◦ Adjustment factor value tbd. ◦ Collect at least 15 min data Turbine “on” and Turbine “off” under comparable wind conditions
04/22/23 5
Permit Required ◦1 MW and greater ◦Public review and comment
Self Certification◦0.1 MW(100 kW) to 0.999 MW◦Option to apply for permit
Conditions:◦Pre-construction impact evaluation (modeling).
◦Demonstrate ability to comply with 10 dBA threshold
◦Post-construction monitoring required04/22/23 6
Attended sampling preferred/required. Input sought on how unattended sampling could be used for Leq data.
No specific limit on the amount of allowable amplitude modulation included; Adjustment Factor used to address modulation
More comprehensive guidance on pre and post construction sampling will be issued in addition to regulations.
Use of Preconstruction background data for post construction compliance determination.
04/22/23 7
All of the input from WNTAG to be considered as MassDEP drafts a new regulation and Technical Support Document
Some of the Technical Issues also informed by the final RWSTA Report (Spring/ Summer 2014)
MassDEP to draft and issue additional guidance on monitoring and modeling wind projects
Regulations will go out to public hearing and comments considered before final adoption.