mark thornton portfolio

9
UP UP REF. REF. DN DN UP REF. DN 1100 1 03 2 03 3 03 4 03 470 1701 1537 6427 1225 1800 8206 1800 4292 18440 6617 13976 920 2050 3423 7583 1140 593 520 760 1360 1119 901 711 901 1727 1201 2534 1201 1205 3580 5723 1000 3076 3061 4915 3161 3229 3365 6831 1800 5728 3365 1145 1425 1145 1435 1895 2218 20 m² KITCHEN/DINING 2 m² WC 15 m² LIVING ROOM 1 12 m² M. BEDROOM 1 11 m² BEDROOM 1 3 m² EN SUITE 4 m² BATHROOM 1 29 m² LIVING AREA 2 04 1 04 3 04 2 3 5 6 7 8 9 10 11 12 04 01 13 14 01 03 04 04 03 03 02 03 05 1 03 2 03 3 03 4 03 12 m² BEDROOM 9 m² BEDROOM 11 m² M. BEDROOM 4 m² BATHROOM 5 m² EN SUITE 35 m² LIVING AREA 11 m² KITCHEN 1 3 m² WC 1 m² STORE 2 m² STORE 1065 920 2290 920 4190 920 926 6427 1000 1520 2486 1520 1000 725 920 3066 1220 1712 456 3738 3738 435 3086 2068 1848 6447 17 15 19 18 16 21 23 22 26 25 24 27 20 1 03 2 03 3 03 4 03 9 m² BEDROOM 11 m² BEDROOM 11 m² BEDROOM 5 m² BATHROOM 2 m² STORAGE 3 m² EN SUITE 1294 85 1435 1009 802 920 1700 2320 651 1220 2755 1220 1200 32 29 31 28 30 33 04 04 03 06 05 DRAWING TITLE PROJECT TITLE DATE No. REMARKS Galway Mayo Institute of Technology BSc. Architectural Technology Year 3 2013-2014 LECTURER: DRAWN: SCALE: DRAWING NUMBER DATE CHECKED MARK THORNTON JIM O CONNOR BIM PROJECT 1 : 100 Floor Plans Issue Date 01 1 : 100 Ground Floor level 1 1 : 100 First Floor Level 2 1 : 100 Second Floor Level 3 Door Schedule Mark Height Width Operation Frame Type Frame Material Comments 2 2110 1010 SingleSwingRi ght 3 2110 910 SingleSwingRi ght 5 2110 910 SingleSwingRi ght 6 2110 910 SingleSwingRi ght 7 2110 910 SingleSwingRi ght 8 2110 910 SingleSwingRi ght 9 2110 910 SingleSwingRi ght 10 2110 910 SingleSwingRi ght 11 2110 910 SingleSwingRi ght 12 2032 1800 32 2110 910 SingleSwingRi ght 17 2110 910 SingleSwingRi ght 15 2110 910 SingleSwingRi ght 19 2110 910 SingleSwingRi ght 18 2110 910 SingleSwingRi ght 16 2110 910 SingleSwingRi ght 04 2110 910 SingleSwingRi ght 21 2110 910 SingleSwingRi ght 23 2110 910 SingleSwingRi ght 22 2110 910 SingleSwingRi ght 26 2110 910 SingleSwingRi ght 25 2110 910 SingleSwingRi ght 24 2110 910 SingleSwingRi ght 29 2110 910 SingleSwingRi ght 01 2110 1360 SingleSwingRi ght 27 2110 1360 SingleSwingRi ght 13 2100 1000 14 2032 1800 31 2110 910 SingleSwingRi ght 28 2110 910 SingleSwingRi ght 30 2110 910 SingleSwingRi ght 33 2110 910 SingleSwingRi ght 20 2110 910 SingleSwingRi ght

Upload: mark-thornton

Post on 08-Aug-2015

173 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Mark Thornton Portfolio

UP

UP

REF.

RE

F.

DN

DN

UP

RE

F.

DN

1100

1

03

2

03

3

03

4

03

470 1701 1537

6427

1225 1800 8206

1800

4292

18440

6617

13976

920

2050

3423

7583

1140

593 520 760 1360 1119 901 711 901 1727 1201 2534 1201 1205

3580

5723

1000

3076

3061

4915 3161 3229

3365

6831

1800

5728

3365

1145

1425

1145

1435

1895

2218

20 m²KITCHEN/DINING

2 m²WC

15 m²LIVING ROOM 1

12 m²M. BEDROOM 1

11 m²BEDROOM 1

3 m²EN SUITE 4 m²

BATHROOM 1

29 m²LIVING AREA

2

04

1

04

3

04

2

3

5 6

7

8

9

10

11

12

04

01

13

14

01

03

0404030302

03

05

1

03

2

03

3

03

4

03

12 m²BEDROOM

9 m²BEDROOM

11 m²M. BEDROOM

4 m²BATHROOM 5 m²

EN SUITE

35 m²LIVING AREA

11 m²KITCHEN 1

3 m²WC

1 m²STORE

2 m²STORE

1065 920 2290 920 4190 920 926

6427

1000 1520 2486 1520 1000 725 920 3066 1220 1712 456 3738

3738

435

3086

2068

1848

6447

17

15

19

18

1621

23

22

26

25

24

27

20

1

03

2

03

3

03

4

03

9 m²BEDROOM

11 m²BEDROOM

11 m²BEDROOM

5 m²BATHROOM

2 m²STORAGE

3 m²EN SUITE

1294

85

1435

1009

802

920

1700

2320

651

1220 2755 1220 1200

32

29

31

28

30

33

04

04

03

06

05

DRAWING TITLE

PROJECT TITLE

DATENo. REMARKS

Galway Mayo Institute ofTechnology

BSc. Architectural TechnologyYear 3 2013-2014

LECTURER:

DRAWN:

SCALE:

DRAWING NUMBER

DATE

CHECKED

MARK THORNTON

JIM O CONNOR

BIM PROJECT

1 : 100

Floor Plans

Issue Date

01

1 : 100

Ground Floor level1 1 : 100

First Floor Level2

1 : 100

Second Floor Level3

Door Schedule

Mark Height Width Operation Frame TypeFrame

Material Comments

2 2110 1010 SingleSwingRight

3 2110 910 SingleSwingRight

5 2110 910 SingleSwingRight

6 2110 910 SingleSwingRight

7 2110 910 SingleSwingRight

8 2110 910 SingleSwingRight

9 2110 910 SingleSwingRight

10 2110 910 SingleSwingRight

11 2110 910 SingleSwingRight

12 2032 1800

32 2110 910 SingleSwingRight

17 2110 910 SingleSwingRight

15 2110 910 SingleSwingRight

19 2110 910 SingleSwingRight

18 2110 910 SingleSwingRight

16 2110 910 SingleSwingRight

04 2110 910 SingleSwingRight

21 2110 910 SingleSwingRight

23 2110 910 SingleSwingRight

22 2110 910 SingleSwingRight

26 2110 910 SingleSwingRight

25 2110 910 SingleSwingRight

24 2110 910 SingleSwingRight

29 2110 910 SingleSwingRight

01 2110 1360 SingleSwingRight

27 2110 1360 SingleSwingRight

13 2100 1000

14 2032 1800

31 2110 910 SingleSwingRight

28 2110 910 SingleSwingRight

30 2110 910 SingleSwingRight

33 2110 910 SingleSwingRight

20 2110 910 SingleSwingRight

Page 2: Mark Thornton Portfolio

Ground level

0

Ground Floor level

150

First Floor Level

3050

Second Floor Level

5875

Ridge level 1

7583

Ridge level 2

11145

Ground level

0

Ground Floor level

150

First Floor Level

3050

Second Floor Level

5875

Ridge level 1

7583

Ridge level 2

11145

Ground level

0

Ground Floor level

150

First Floor Level

3050

Second Floor Level

5875

Ridge level 1

7583

Ridge level 2

11145

Ground level

0

Ground Floor level

150

First Floor Level

3050

Second Floor Level

5875

Ridge level 1

7583

Ridge level 2

11145

DRAWING TITLE

PROJECT TITLE

DATENo. REMARKS

Galway Mayo Institute ofTechnology

BSc. Architectural TechnologyYear 3 2013-2014

LECTURER:

DRAWN:

SCALE:

DRAWING NUMBER

DATE

CHECKED

MARK THORNTON

JIM O CONNOR

BIM PROJECT

1 : 100

Elevations

Issue Date

02

1 : 100

South1 1 : 100

North2

1 : 100

East3 1 : 100

West4

Page 3: Mark Thornton Portfolio

Ground level

0

Ground level

0

Ground Floor level

150

First Floor Level

3050

First Floor Level

3050

Second Floor Level

5875

Second Floor Level

5875

Ridge level 1

7583

Ridge level 1

7583

Ridge level 2

11145

Ridge level 2

11145

5

04

4

04

6

04

Ground level

0

Ground level

0

Ground Floor level

150

Ground Floor level

150

First Floor Level

3050

First Floor Level

3050

Second Floor Level

5875

Second Floor Level

5875

Ridge level 1

7583

Ridge level 1

7583

Ridge level 2

11145

Ridge level 2

11145

150

7

04

Ground level

0

Ground level

0

Ground Floor level

150

Ground Floor level

150

First Floor Level

3050

First Floor Level

3050

Second Floor Level

5875

Second Floor Level

5875

Ridge level 1

7583

Ridge level 1

7583

Ridge level 2

11145

Ridge level 2

11145

Ground level

0

Ground level

0

Ground Floor level

150

Ground Floor level

150

First Floor Level

3050

First Floor Level

3050

Second Floor Level

5875

Second Floor Level

5875

Ridge level 1

7583

Ridge level 1

7583

Ridge level 2

11145

Ridge level 2

11145

DRAWING TITLE

PROJECT TITLE

DATENo. REMARKS

Galway Mayo Institute ofTechnology

BSc. Architectural TechnologyYear 3 2013-2014

LECTURER:

DRAWN:

SCALE:

DRAWING NUMBER

DATE

CHECKED

MARK THORNTON

JIM O CONNOR

BIM PROJECT

1 : 100

Sections

Issue Date

03

1 : 100

Section 11 1 : 100

Section 22

1 : 100

Section 33 1 : 100

Section 44

Page 4: Mark Thornton Portfolio

325mm BLOCK CAVITY WALL

PLASTER FINISH

PLASTER

FINISH

DAMP PROOF

MEMBERANE

25mm KINGSPAN

INSULATION

TIMBER

DOOR FRAME

325mm BLOCK CAVITY WALL

PLASTER

FINISH

DAMP PROOF

MEMBERANE

25mm KINGSPAN

INSULATION

TIMBER

CLADDING

25mm KINGSPAN

INSULATION

TIMBER

BATTEN

325mm BLOCK CAVITY WALL

PLASTER FINISH

PLASTER

FINISH

DAMP PROOF

MEMBERANE

25mm KINGSPAN

INSULATION

ALUMINIUM

SLIDING DOOR

85mm KINGSPAN

INSULATION

TIMBER

CLADDING

TIMBER

BATTEN

325mm BLOCK CAVITY WALL

PLASTER FINISH

85mm KINGSPAN INSULATION

DAMP PROOF

MEMBERANE

PRECAST

CONCRETE SILL

325mm BLOCK CAVITY WALL

PLASTER FINISH

85mm KINGSPAN INSULATION

PLASTER

FINISH

DAMP PROOF

MEMBERANE

25mm KINGSPAN

INSULATION

TIMBER

SILL BOARD

PRECAST

CONCRETE SILL

325 BLOCK CAVITY WALL

PLASTER FINISH

85mm KINGSPAN INSULATION

60mm SCREED 50mm KINGSPAN

INSULATION

TIMBER FLOOR

FINISH

DAMP PROOF

MEMBERANE

TIMBER SKIRTING

FINISH

PLASTER FINISH

DAMP PROOF

MEMBERANE

DAMP PROOF

COURSE

325mm BLOCK CAVITY WALL

PLASTER FINISH

85mm KINGSPAN INSULATION

DAMP PROOF

MEMBERANE

225mm TIMBER

ROOF JOIST

SLATE ROOF

TILES

TIMBER

FASCIA BOARD

TIMBER

SOFFIT BOARD

25mm TIMBER

BATTEN

AIR FLOW

100mm ROCKWOOL

INSULATION

TIMBER

WALL PLATE

DRAWING TITLE

PROJECT TITLE

DATENo. REMARKS

Galway Mayo Institute ofTechnology

BSc. Architectural TechnologyYear 3 2013-2014

LECTURER:

DRAWN:

SCALE:

DRAWING NUMBER

DATE

CHECKED

MARK THORNTON

JIM O CONNOR

BIM PROJECT

1 : 5

Details

Issue Date

04

1 : 5

Door Jamb Detail1

1 : 5

Window Jamb Detail2

1 : 5

Sliding Door Jamb Detail3

1 : 5

Window Head Detail4

1 : 5

Window Sill Detail5

1 : 5

Foundation Detail6

1 : 5

Eaves Detail7

Page 5: Mark Thornton Portfolio

DRAWING TITLE

PROJECT TITLE

DATENo. REMARKS

Galway Mayo Institute ofTechnology

BSc. Architectural TechnologyYear 3 2013-2014

LECTURER:

DRAWN:

SCALE:

DRAWING NUMBER

DATE

CHECKED

MARK THORNTON

JIM O CONNOR

BIM PROJECT

3D Sections

Issue Date

05

3D Section 11

3D Section 22

3D Section 33

3D Section 44

Page 6: Mark Thornton Portfolio

DRAWING TITLE

PROJECT TITLE

DATENo. REMARKS

Galway Mayo Institute ofTechnology

BSc. Architectural TechnologyYear 3 2013-2014

LECTURER:

DRAWN:

SCALE:

DRAWING NUMBER

DATE

CHECKED

MARK THORNTON

JIM O CONNOR

BIM PROJECT

3D Perspective DrawingsNo. 1

Issue Date

06

3D Site1

Perspective 12

Perspective 23

Perspective 34

Page 7: Mark Thornton Portfolio

DRAWING TITLE

PROJECT TITLE

DATENo. REMARKS

Galway Mayo Institute ofTechnology

BSc. Architectural TechnologyYear 3 2013-2014

LECTURER:

DRAWN:

SCALE:

DRAWING NUMBER

DATE

CHECKED

MARK THORNTON

JIM O CONNOR

BIM PROJECT

3D Perspective DrawingsNo. 2

Issue Date

07

Perspective 41

Perspective 52

Perspective 63

Page 8: Mark Thornton Portfolio

DRAWING TITLE

PROJECT TITLE

DATENo. REMARKS

Galway Mayo Institute ofTechnology

BSc. Architectural TechnologyYear 3 2013-2014

LECTURER:

DRAWN:

SCALE:

DRAWING NUMBER

DATE

CHECKED

MARK THORNTON

JIM O CONNOR

BIM PROJECT

External Renders

Issue Date

08

Page 9: Mark Thornton Portfolio

DRAWING TITLE

PROJECT TITLE

DATENo. REMARKS

Galway Mayo Institute ofTechnology

BSc. Architectural TechnologyYear 3 2013-2014

LECTURER:

DRAWN:

SCALE:

DRAWING NUMBER

DATE

CHECKED

MARK THORNTON

JIM O CONNOR

BIM PROJECT

Internal Renders

Issue Date

09