marie gordon

20
h lb l The Melbourne 2030 plan Melbourne’s Public Transport System By: Marie Gorodn

Upload: jpblancomoya

Post on 20-Aug-2015

712 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Marie gordon

h lb lThe Melbourne 2030 plan

Melbourne’s Public Transport SystemBy: Marie Gorodn

Page 2: Marie gordon

I t d tiIntroduction

The Melbourne 2030 (M2030) plan was conceived in 2002 to focus on building a sustainable city to meet population projections.

Then in 2008 the  “Melbourne @ 5million plan” and “Victoria Future 2008”, was created with  the vision to improve Melbourne’s public transport (PT) 

Page 3: Marie gordon

B k dBackground

There are  3  policies: 

t t t i bl t t to create  sustainable transport

upgrading existing infrastructure 

build new infrastructure to link regional Victoria and outer Melbourne to the metropolitan area. 

Page 4: Marie gordon

Th  P liThe Policy

1. Melbourne 2030 plan/Melbourne@5million

E t O t b 2002 Est October 2002

Vision:  to make the city a more compact and ff d bl l t li d k iaffordable place to live and work in. 

Cater for urban expansion in UGB;

housing needs  to be concentrated near CAD centres; 

Page 5: Marie gordon

Th  P liThe Policy

2. Direction 8 “better transport links”

f PT i f t t li ki i l focuses on PT  infrastructure  linking regional Victoria to the metropolitan area.

Pl b d l t f j b ibilit Plan urban development for job accessibility

Coordinate development of all transport modes

Manage the road system to achieve integration

Review transport practices Review transport practices

Page 6: Marie gordon

Th  P liThe Policy

3. Growing Victoria together 20/20

Th i i t d d d d d bl The aim is to reduce car dependency and double PT’s share of all motorised trips in Melbourne to 20 per cent by the year 2020

Page 7: Marie gordon

M th d  f T l t  W kMethod of Travel to Work

10%

6%

2%Method of Travel to Work

Car PT Walking Cycling  Other

72%

10%

10%

72%

(ABS 2001‐2006)

Page 8: Marie gordon

M lb ’  PT t dMelbourne’s PT today

The world’s largest tram network

Buses

The suburban railway network

Inter‐city railway services

Inter‐state railway services

The largest freeway network in any Australian cityg y y y

Taxi services

Public bike‐hire systemy

Page 9: Marie gordon

Hi t   f M lb ’  PT  tHistory of Melbourne’s PT system

Horse and Cable Trams Began in 1885‐1891 Stopped in 1940

Electric Trams   Began in 1889‐1896 

St & Di l T i B i 1854 Steam & Diesel Trains Began in 1854 

Electric trains Began 1913 

Buses Began 1869  

Page 10: Marie gordon

C ti    M lb ’   dCongestion on Melbourne’s roads

1 in 5  workers living in Werribee, commute to the CBD by car, causing traffic congestion on the West Gate Bridge which spills onto Kingsway and the Burnley Tunnel inbound. (Millar & Mann, 2008)

Page 11: Marie gordon

C ti    M lb ’   dCongestion on Melbourne’s roads

In addition to the increase in population, the State government's Infrastructure Planning Council made some encouraging statements about sustainability demanding that the “true social, environmental and economic costs of transport be recognised”.and economic costs of transport be recognised .

Page 12: Marie gordon

C ti    M lb ’   dCongestion on Melbourne’s roads

The M2030 plan has an abundance of road projects on the calendar to expand our roads making them wider, longer with accessible linkages.”         (Gleeson et al 2003:211)

Page 13: Marie gordon

C ti  S t i bl  T tCreating Sustainable Transport

According to Professor Martin Mogridge of University College London:

“We cannot reduce congestion by building more roads since immediately we get more traffic to fill them up to the same speed as before. The only way to reduce congestion is to introduce better PT  facilities which reduce the number of people whofacilities which reduce the number of people who travel by car on the roads”.

Page 14: Marie gordon

M  R d P j tMore Road Projects

the Frankston bypass, a 25 kilo‐metre route linking Carrum Downs to Mount Martha, 

the link east to west 18 kilo‐metre road tunnel and the 17 kilometre rail tunnel project said to cost over $18 billion (Millar et al, 2008) 

Page 15: Marie gordon

C ti  S t i bl  T tCreating Sustainable Transport

The Regional Rail Link” project running from Southern Cross Station to Werribee and new outer ring road from Werribee to Hume Highway is a 50 Kilometre track costing $4 billion.

the  “single largest Australian government investment in urban rail ever!” (Lucas, 2009)

Page 16: Marie gordon

F d l F diFederal Funding

Page 17: Marie gordon

C ti  S t i bl  T tCreating Sustainable Transport

The Melbourne 2030 will create  

A it t d ff d bl A city more compact and affordable. 

less car‐dependent. 

move from a city‐centric hub‐and‐spoke landscape to one of a network of almost self‐contained 

i l d it tcommercial and community centres.

Page 18: Marie gordon

Th  S l ti  The Solution 

Fast 

F t Frequent

Reliable

Safe

Accessible Accessible

Connected 

Page 19: Marie gordon

C l iConclusion

government to provide  adequate funding to upgrade infrastructure;

travel faster, safer and easier;

ith ff ti i ti l t t governance with effective organisational structures staffed by competent employees;

d i t bl lt f i ti d dynamic accountable culture of innovation and improvements, ensuring the efficiency and reliability.

Page 20: Marie gordon

Q ti  ?Questions ?