1 November, 2013 Managing Project Safety and Community Relations LEWINO 1G2 case study

Upload: others

Post on 28-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

1 November, 2013

Managing Project Safety and Community

Relations – LEWINO 1G2 case study

Page 2: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

2

1. Introduction

2. Main hazards and mitigations

3. Our performance

4. Environmental aspects

5. Community relations

AGENDA

Page 3: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

3

San Leon Energy is the international group of

companies dealing with exploration and

production of conventional and

unconventional oil and gas resources in

Europe and Africa.

WHAT ARE WE?

Page 4: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

4

Albania 1 koncesja 1.0 mln akrów

San Leon concessions Polska 42 koncesje 4.8 mln akrów

Niemcy 1 koncesja 15.6 tys akrów

Hiszpania 2 koncesje 8 w trakcie aplikacji 2.2 mln akrów

Moroko 5 koncesji 6.0 mln akrów

Francja 10 w trakcie aplikacji 2.4 milionów akrów

Irlandia 8 koncesji 0.6 milionów akrów

Rumunia 1 koncesji 0.1 mln akrów

Bułgaria 1 koncesja 0.1 mln akrów

Słowacja 3 koncesje 0.3 mln akrów

Italy 2 koncesji 0.2 mln akrów

San Leon Energy Plc – area

84 concessions covering

28.5 mln acres (11,5 mln ha) gross /

17.8 mln acres (7,2 mln ha) net

Page 5: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

5

SLE CONCESSIONS IN POLAND

Page 6: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

6

LEWINO-1G2 WELLSITE

Page 7: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

7

LEWINO-1G2 WELL DATA

SPUD DATE: 26.09.2011

TVD DATE: 10.11.2011

OPERATIONS COMPLETED: 16.11.2011

TESTS STARTED – STAGE I 19.06.2013

HYDRAULIC FRACKING – STAGE II 2.07.2013

TEST COMPLETION DATE – STAGE I 12.08.2013

TESTS COMMENCEMENT DATE STAGE II 21.10.2013

HYDRAULIC FRACING STAGE II 8.11.2013/12.11.2013

TESTS COMPLETED – STAGE II On-going

GAS PRODUCTION ???

Page 8: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

8

WELLSITE DEVELOPMENT

Page 9: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

9

SEPARATE SPILL ZONES

Page 10: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

10

FRAC SITE ARRANGEMENT – STAGE 1.

Page 11: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

11

SUMMARY - WHAT DID WE START WITH?

Abandoned wellsite – sand covered. Concrete slabs in wellhead area. Upgraded with geomembrane in selected areas and then covered with gravel. Erosion of slopes.

Gravel access road – only a minor upgrade needed.

Limited resources – all activities tailor - made.

MAIN DEVELOPMENT AREAS:

Enthusiastic and resourceful operational team, however no operational safety system set and operable.

Prepare the facility for a time - limited operation

Established relations with the local community.

FACILITY AND RESOURCES

Set common set set of rules fro the contractors to follow while on the site.

Re-establish community communication ways – introducing new company.

Page 12: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

12

1. Introduction

2. Main hazards and mitigations

3. Our performance

4. Environmental aspects

5. Community relations

AGENDA

Page 13: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

13

COMPLETIONS PROGRAMME

SERVICE SCOPE OF WORK JOB PERFORMED BY

Well stimulation

Preparing the liquids and

performing fracing (3 fracs, 2

intervals).

United Oilfield Services Sp. z

o.o + subcontractors

Piping tightness,

well perforation. Casing perforation, tests. Geofizyka Toruń SA

Coiled tubing

(nitrogen unit) Well cleaning and mud circulation. SMAPE S.r.l.

Packer

mechanical plug

drilling

Tools Weatherford

Surface tests and

flare. Well testing ITALFLUID Geoenergy S.r.l.

Frac wellhead Frac wellhead installation FMC

Snubbing Unit Removal / assmbly of production

tubulars and packer installation. SNUBCO Group of Companies

Lewino 1G2 work scope - well completion works – in two stages.

Page 14: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

14

HSE OPERATIONAL CHALLENGES

Mutual principles agreed by 10+ Contractors- mostly foreign;

EXTERNAL:

Crews commuting to well site – on narrow, slippery and unlit roads – used by local drivers as well (also timber cargo).

Logistics: congestion at the well site – with very limited truck / rest parking space available. Different travelling times

INTERNAL

Billingual safety documents / operational forms.

Operational planning and communication – also on HSE.

Traffic management. Crews aware of changing weather conditions.

Mitigation:

Operations by numerous services. Limited

storage / maneuver space; Adverse weather

conditions; Support services perfomed by

independent local contractors; Local

roustabouts

Satisfying Polish legal requirments: Mining

Enterprise Manager representing the site to

external authiorities – inside - supporting

San Leon crew.

Safety documents abstract and HSE

compliance statement.

Page 15: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

15

TRANSPORTATION

Page 16: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

16

ON - SITE CHALLENGES

Page 17: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

17

SPACE LIMITS

Page 18: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

18

1. Introduction

2. Main hazards and mitigations

3. Our performance

4. Environmental aspects

5. Community relations

AGENDA

Page 19: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

19

SAFETY PERFORMANCE - COMPLETIONS

Aspirational target ZERO INCIDENTS met - ca. 25 000 manhours worked without a serious incident / HPI – by numerous service companies; lots of simultaneous operations.

Safety system established - based on best industry practices.

Near misses were reported, recorded and investigated. Main types: operational practices – mostly lifting ops, equipment failures , but also transportation issues – including those outside the site (side / access road – gravel surface).

GENERAL REMARKS:

Communicative, safety aware, and experienced crews, strong observance of safety regulations.

Documents: safety certificates / mediclas presented and available: great job on supervision side.

No protests from local community.

FACTS:

Page 20: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

20

SOME OPERATIONAL RULES TO FOLLOW

Security staff responsible for POB (doubled for frac team)

Documents: medical and safety certificates available and registered by HSE / KRZ;

Fire fighting equipment: provide valid adequately to own operations (and submit a plan of its positioning as well).

Elevated attention on adequate PPE and site surface conditions.

Team Leaders: Direct supervision and responsibility on your team / equipment safe operation.

Shared resources: Forkilft / manlift / crane load mounting: use - subject to planning and availability. So contractors’ certificates in the matter are of value as well.

HSE Rep – on -site rather than in the office. Supporting role for organizing activities.

Barriers: language / abilites / experience – but the staff 99 % competent and aware.

Water handling and storage / pressure jobs – winter risk included.

Page 21: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

21

1. Introduction

2. Main hazards and mitigations

3. Our performance

4. Environmental aspects

5. Community relations

AGENDA

Page 22: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

22

PERMITS, PERMITS….

Rodzaj decyzji Wydana przez Numer/znak Wydana w dniu

Czas

obowiązywania

CONCESSION

Minister

Środowiska 71/2009/p 10-gru-09 10-gru-14

ENVIRONMENTAL CONDITIONS DECISION

Regionalna

Dyrekcja Ochrony

Środowiska w

Gdańsku

RDOŚ-Gd-

WOO.4210.2.2012.

ER.21 24-lip-13

n/d

WATER PERMIT FOR GROUNDWATER WELLS

Starosta

Wejherowski OS-858/2011 07-wrz-11 n/d

WATER PERMIT FOR GROUND WATER CONSUMPTION

Starosta

Wejherowski OS-42/2012 30-sty-12 10-paź-14

MINING WASTE PRODUCTION PERMIT

Marszałek woj.

pomorskiego

DROŚ-

S.7240.130.2012.N

B 18-lip-12 -

AGRICULTURAL GROUND EXEMPTION PERMIT

Starosta

Wejherowski OS-643/2011 18-maj-11 18-maj-16

GROUND RECLAIM PROCESS DECISION

Starosta

Wejherowski OS-721/2011 15-cze-11 n/d

Page 23: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

23

WATER CONSUMPTION [m3]

OPERATIONAL STAGE WATER WELLS PIPELINE

DRILLING 1220 22

TESTS - STAGE I 1417 633

TESTS – STAGE II

Page 24: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

24

DRILLING WASTE [Mg]

OPERATIONAL STAGE QUANTITY

DRILLING

1850,02

SOLID

1274,94

LIQUID

575,08

TESTS – STAGE I

719,35

MUD

131,6

FLOWBACK

587,75

TESTS – STAGE II

0

MUD

0

FLOWBACK

0

Page 25: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

25

WATER CONSUMPTION [m3]

OPERATIONAL STAGE DEEP WATER

WELLS

PIPELINE

DRILLING 1220 22

TESTS – STAGE I 1417 633

TESTS – STAGE II

Page 26: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

26

NOISE PROPAGATION

Faza prac Ilość odpadów

Etap wiercenia 1850,02

Stałych

1274,94

Ciekłych

575,08

Etap testów złożowych - etap I 719,35

Płuczki wiertnicze

131,6

Płyn powrotny

587,75

Etap testów złożowych - etap II 0

Płuczki wiertnicze

0

Płyn powrotny

0

Page 27: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

27

PERMITS AND CONTROL

Monitor and report your water consumption – we plan the water draw activites accordingly (wells – up to 10 m3/h; network – up to 10 m3/ h – 22 – 6 hrs.)

Water freezes in sub-zero tempereatures – heat equipment prior to use;

Beware of wastewater you produce – it may freeze, too;

Waste:

Selective collection of waste will be arranged and followed;

Keep your workplace in order;

Watch out for spills – have your spill management sets ready.

Water

Page 28: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

28

1. Introduction

2. Main hazards

3. Mitigation measures undertaken

4. Our performance

5. Community relations

AGENDA

Page 29: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

29

YOUTH PATROL

Page 30: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

30

COMMUNITY RELATIONS

•Show your respect to local community

• Ensure the public has its say –

nominate a local representative

• Structurize your communication

• Lead discussions based on facts, not

opinions

• Explain the operational process and

your priorities

• Listen to comments, communicate

your responses

• Proactive actions may be of great

value

Page 31: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

31

CLOSING REMARKS

1. Communication, awareness and supervision as limited resources

available;

2. Safety over operational goals – present example and made crew

follow;

3. System? Rules? It is YOU where the safety starts from! Rest is

tools – for reference.

SAFETY

ENVIRONMENT

1. Can be organized safely and in a responsive manner – depending on

local conditions;

2. Waste and noise seem to be greatest challenges: water does require

management;

COMMUNITY

Want to be well perceived – communicate locally and have ideas and

resources to follow.

Page 32: Managing Project Safety and Community Relations LEWINO 1G2 ...petroleumclub.ro/downloads/ShaleGas/Dariuz_Latka... · tvd date: 10.11.2011 operations completed: 16.11.2011 tests started

32

Thank you for your attention

Dariusz Łątka

HSE Management

Consultant

November, 2013

Think safe - Work safe –