maintenance bureau 1409 coliseum boulevard … 2008-2pi.pdf · 1409 coliseum boulevard montgomery,...

10
ALABAMA DEPARTMENT OF TRANSPORTATION MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD MONTGOMERY, ALABAMA 36130-3050 PHONE (334) 242-6272 FAX (334) 242-6378 Bob Riley Joe McInnes GOVERNOR TRANSPORTATION DIRECTOR MAINTENANCE BUREAU SPECIFICATION 2008 – 2 PI FURNISH & INSTALL SIGN POSTS (July 2008) Post Installation: The Department shall be responsible for providing drawings including post length, type, and location to be used by Contractor for installation, when specified by contract. LF price includes the cost of all labor, equipment, and material to fabricate, coat/galvanize, inspect, package, and ship to jobsite. LF price also includes footing or stub/anchor; break away connection (if required), installation, erection of posts, inspection, clean-up and redressing of right-of-way as needed. Removal and Disposal of Old Signs: The Contractor shall be responsible for removal and disposal of old signs and sign structures at no additional expense to the Department. Unless directed otherwise, the contractor shall salvage all posts removed and deliver to ALDOT district or division specified. Unless otherwise specified herein, applicable Maintenance Bureau specifications, or special drawings, ALL work must conform to section 710 & 880 of ALDOT standard specifications and any applicable special provisions of the Alabama Department of Transportation. MBS 2008-2PI Page 1 of 10 July 2008

Upload: hoangngoc

Post on 05-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

ALABAMA DEPARTMENT OF TRANSPORTATION

MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD

MONTGOMERY, ALABAMA 36130-3050 PHONE (334) 242-6272 FAX (334) 242-6378

Bob Riley Joe McInnes GOVERNOR TRANSPORTATION DIRECTOR

MAINTENANCE BUREAU SPECIFICATION 2008 – 2 PI

FURNISH & INSTALL SIGN POSTS (July 2008)

Post Installation: The Department shall be responsible for providing drawings including post length, type, and location to be used by Contractor for installation, when specified by contract. LF price includes the cost of all labor, equipment, and material to fabricate, coat/galvanize, inspect, package, and ship to jobsite. LF price also includes footing or stub/anchor; break away connection (if required), installation, erection of posts, inspection, clean-up and redressing of right-of-way as needed.

Removal and Disposal of Old Signs: The Contractor shall be responsible for removal and disposal of old signs and sign structures at no additional expense to the Department. Unless directed otherwise, the contractor shall salvage all posts removed and deliver to ALDOT district or division specified.

Unless otherwise specified herein, applicable Maintenance Bureau specifications, or special drawings, ALL work must conform to section 710 & 880 of ALDOT standard specifications and any applicable special provisions of the Alabama Department of Transportation.

MBS 2008-2PI Page 1 of 10 July 2008

Page 2: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

MBS 2008-2PI Page 2 of 10 July 2008

Page 3: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

MBS 2008-2PI Page 3 of 10 July 2008

Page 4: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

MBS 2008-2PI Page 4 of 10 July 2008

Page 5: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

MBS 2008-2PI Page 5 of 10 July 2008

Page 6: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

MBS 2008-2PI Page 6 of 10 July 2008

Page 7: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

MBS 2008-2PI Page 7 of 10 July 2008

Page 8: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

MBS 2008-2PI Page 8 of 10 July 2008

Page 9: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

MBS 2008-2PI Page 9 of 10 July 2008

Page 10: MAINTENANCE BUREAU 1409 COLISEUM BOULEVARD … 2008-2PI.pdf · 1409 coliseum boulevard montgomery, alabama 36130-3050 phone ... 2 pi furnish & install ... post installation:

MBS 2008-2PI Page 10 of 10 July 2008