mahindra navistar outperformers’ league cement 15 th jun 2012 jaipur sushil cherian 1© 2012, all...

19
MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1 © 2012, All Rights Reserved. l

Upload: noreen-allison

Post on 26-Dec-2015

222 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

MAHINDRA NAVISTAR

Outperformers’ LeagueCement

15th Jun 2012 Jaipur

Sushil Cherian

1© 2012, All Rights Reserved. l

Page 2: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

2© 2012, All Rights Reserved. l

Cement Logistics Importance and Opportunities

Page 3: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

Industry Overview• Current Installed Capacity is 245 million T

– 139 Large plants produce ~ 234 million T– 365 mini plants produce ~ 11 million T

• Players in market

• Unequal distribution of production areas and consumption areas leads to logistics playing critical role in Cement Supply Chain

3 © 2012, All Rights Reserved. l

Page 4: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

Industry Overview

4 © 2012, All Rights Reserved. l

• Critical components of cement costs

• Logistics cost is 19-25 % of Cement Production cost

Page 5: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

Cement Logistics

5 © 2012, All Rights Reserved. l

Page 6: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

Distribution Puzzle ?

6 © 2012, All Rights Reserved. l

Page 7: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

You have a product that is inexpensive to make and has a phenomenal demand !

7© 2012, All Rights Reserved. l

Page 8: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

8 © 2012, All Rights Reserved. l

Not quite….

Page 9: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

9 © 2012, All Rights Reserved. l

What takes away a chunk of the winning is the disproportionate

transportation cost.

Page 10: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

This is the dilemma which Cement Makers face

10 © 2012, All Rights Reserved. l

Page 11: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

Preferred Transportation Model

11 © 2012, All Rights Reserved. l

• Transportation • Transportation costs high - freight accounts for 19-20 % of the production

cost • Road preferred mode for transportation for distances less than 250kms.

However, industry is heavily dependant on roads as the railway infrastructure is not adequate - shortage of wagons.

• Capacity additions • Acquisitions have been the mainstay of the business • Regional imbalance resulting in cross regional movement -

limestone availability in pockets has led to uneven capacity additions • Capacity additions have slowed down

Page 12: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

Rajasthan scenario

© 2012, All Rights Reserved. l 12

Page 13: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

Distribution logistics

13 © 2012, All Rights Reserved. l

> 1000 kms

Page 14: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

© 2012, All Rights Reserved. l 14

Plant Locations vsDistribution

Page 15: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

Road Freight Determinants - Cement

15 © 2012, All Rights Reserved. l

Return Load

Distance

Road Condition/ Congestion

Loading Time/ Load Timings

Waiting Period

Unloading Time/ Unloading Timings

Mode / Transport Availability

Page 16: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

© 2012, All Rights Reserved. l 16

Logistics HUB- Cement

Page 17: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

© 2012, All Rights Reserved. l 17

• Explore secondary delivery and invoicing (on behalf of distributor) for region

• How does it work ?– Identify local area along highway for downsizing Cement Consignment ( Bulk

Breaking)– Place Containers ( 40 ft ) along periphery with multi opening– Cement bulk is transported to HUB Container and reloaded to small capacity

vehicle– Possibility of Invoicing system on small vehicle to facilitate quick delivery– This works well where rail freight can get offset ( bulk loading)

Value Addition by you …

Page 18: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

© 2012, All Rights Reserved. l 18

• Portable Container warehousing• Timely delivery with in 6-12 hrs• End to End Logistics Solution• Reduction in shortages and wastage• Bag Damages reduction• Other Labour related issues at Plants• Reduction in payment of wharfage charges • Improving sales efficiency by 15-20 % ( cycle time)• Overcome Railway indent issues

WINWIN

SITUATION !

Benefits

Page 19: MAHINDRA NAVISTAR Outperformers’ League Cement 15 th Jun 2012 Jaipur Sushil Cherian 1© 2012, All Rights Reserved. l

Thank You

19© 2012, All Rights Reserved. l